Loading...
IM Inspection Worksheet_19-07-2023_08-36-29INSPECTION WORKSHEET (SEP-026676-2023) SEP-0093-2023Case Number:Case Module:Permit Management 07/19/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:10 Duncan Cv Queensbury, NY 12804 227.13-2-1 Company Name NameContact Type Applicant Matthew Parisi Contractor Ellsworth & Son Excavation Engineer Hutchins Engineering Granted Permission Matthew Parisi Primary Owner Matthew Parisi Checklist Item CommentsPassed Building Inspector Notes True Partial inspection for placement of 1250 precast septic tank and pump chamber only 7/7/23 Soil Type: Sand True Size of Stone True #2 Final Electrical True provide final electric / received Waterline separation distance True Building to Tank True 4" SCHD 40 / 4" SDR 35 to pump chamber [Provide extension collar if Yes]True Tank to Distribution Box True 2" SCHD 40 force main to manifold Opening Sealed:True 90% alarm level activates True End Cap True Absorbtion Fields: Total Length True 15x45 pipe in stone absorpition bed Septic system field above flood plain True Foundation to Tank True 10 ft Engineer Report and As-Built False please provide engineer asbuilt / received Location of system on property True Inlet & Outlet manholes 12"+ below grade True Type of Water: Municipal / Well Water True lake George Locations / Separations True Depth of Trenches True bed is 18"-20"+ Length of Each Trench True bed is 45 ft length (3) 2" SCHD 40 with 5/16" holes 4ft oc System Use Status True Conforms as per Plot Plan True Size of tank True 1250 pre cast to 500 gallon pre cast pump chamber Distribution box to Field / Pit True 2" SCHD 40 Foundation to Absorption True see specs InletOutlet Pipes & Baffles True 50% alarm level activates True July 19, 2023 Page 1 of 1