Loading...
IM Inspection Worksheet_24-07-2023_15-43-44INSPECTION WORKSHEET (RPLUM-026757-2023) RC-0860-2021Case Number:Case Module:Permit Management 07/24/2023 PassedInspection Status:Inspection Date: Rough PlumbingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:15 Tuscarora Dr Queensbury, NY 12804 239.8-1-44 Company Name NameContact Type Applicant William Mason Contractor Takundewide Management Group Inc. (TMG INC) Granted Permission Lisa Paplanus Primary Owner Lisa Paplanus Checklist Item CommentsPassed Building Inspector Notes True 3/21/22 rough plumbing for renovations to existing home approved Pressure Test True Pressure Test True 3" Vent Through Roof - 18" min True All Return Air Hard Duct Work True 5 psi or 10 ft. above highest conn. for 15 minutes True Sanitary plumbing and vents tested with air head test, holding 5 psi for 15 minutes Rough Plumbing / Nail Plates True Water Supply Piping True Duct work sealed properly True Plumbing Vent Vents in Place True Air Head True Air Head True 50 P.S.I for 15 minutes True 1 ½ inch minimum Drain Size True July 24, 2023 Page 1 of 1