Loading...
IM Inspection Worksheet_27-07-2023_12-06-55INSPECTION WORKSHEET (SEP-026868-2023) SEP-0362-2022Case Number:Case Module:Permit Management 07/27/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:John O'Brien Job Address:Parcel Number:2483 Ridge Rd Queensbury, NY 12804 240.6-1-10 Company Name NameContact Type Applicant Bridget Congdon Contractor DeMartino Builders Engineer Environmental Design Partnership (EDP) Granted Permission Theodore Congdon Primary Owner Theodore Congdon Checklist Item CommentsPassed Building Inspector Notes True 4/24/23 Septic Inspection Partial Approval Remaining items: - Need to verify pump, alarms and dosing of pump tank to raised manifold pressure bed systems. - Need to verify Final Electrical Inspection. - Submit Final approval letter and certified septic system as-built. - Provide maintenance agreement contract for the Norweco ETU Unit. 5/5/23 partial approval for septic system - alarms and pumps verified. 6/27/23 Septic System Partial Approval Items remaining : - proof of final electrical inspection - provide maintenance agreement for enhanced treatment system. - provide asbuilt drawing and letter of completion from design engineer. 7/12/23 partial approval for septic system - final electrical inspection verified, Middle inspection service provided the inspection Items remaining -provide manufacturers maintenance agreement. 7/27/23 Septic System Final Inspection approved - Received Maintenance Agreement ETU Maintenance Contract provided True 7/27/23 Septic System Final Inspection approved - Received Maintenance Agreement Final Electrical True 6/27/23 Septic System Partial Approval Remaining Items: - proof of final electrical inspection - provide maintenance agreement for enhanced treatment system. 7/12/23 verified Roof gutters don't discharge over leach field True Waterline separation distance True Building to Tank True July 27, 2023 Page 1 of 2 INSPECTION WORKSHEET (SEP-026868-2023) Checklist Item CommentsPassed Opening Sealed:True 90% alarm level activates True Foundation to Tank True Engineer Report and As-Built True Sump pump not connected to septic system True Location of system on property True Type of Water: Municipal / Well Water True Well Locations / Separations True As per variance Well separation distance True As per variance System Use Status True System approved for use Conforms as per Plot Plan True Size of tank True 1300 gallon Norweco ETU Tank 1000 gallon concrete pump tank Foundation to Absorption True As per variance InletOutlet Pipes & Baffles True 50% alarm level activates True July 27, 2023 Page 2 of 2