Loading...
IM Inspection Worksheet_27-07-2023_15-21-28INSPECTION WORKSHEET (SEP-026835-2023) SEP-0417-2023Case Number:Case Module:Permit Management 07/27/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:383 Corinth Rd Queensbury, NY 12804 308.16-2-15 Company Name NameContact Type Applicant RITA MINER Contractor Sanitary Sewer Service Engineer Center Project Services Granted Permission RITA MINER Primary Owner RITA MINER Checklist Item CommentsPassed Building Inspector Notes True for 20x25 absorption bed Soil Type: Sand True ETU Maintenance Contract provided True Size of Stone True #2 Waterline separation distance True Building to Tank True existing [Provide extension collar if Yes]True at outlet / less than 12" Tank to Distribution Box True SDR 35 / 4" Opening Sealed:True End Cap True lines are looped Absorbtion Fields: Total Length True 4 lines at 20 ft / looped at 5 ft apart=95 ft Septic system field above flood plain True Foundation to Tank True existing 1000 gallon is 15 ft Engineer Report and As-Built True as built provided by installer Sump pump not connected to septic system False Location of system on property True Inlet & Outlet manholes 12"+ below grade False Type of Water: Municipal / Well Water True municipal Locations / Separations True Depth of Trenches True depth of bed 12"-16" Length of Each Trench True absorption bed 4 lines at 20 ft / looped at 15=95 ft System Use Status True Conforms as per Plot Plan True Distribution box to Field / Pit True SDR 35 solid to sewer and drain perforated / 4" Foundation to Absorption True 23 ft InletOutlet Pipes & Baffles True July 27, 2023 Page 1 of 1