IM Inspection Worksheet_31-07-2023_15-42-39INSPECTION WORKSHEET (RPLUM-026906-2023)
CC-0061-2023Case Number:Case Module:Permit Management
07/31/2023 Partial PassInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:756 Glen St
Queensbury, NY 12804
302.6-1-51.2
Company Name NameContact Type
Applicant JET Enterprises HC3 LLC
Contractor JET Enterprises TSC2 LLC
Granted Permission Dave's Hot Chicken
Primary Owner QUEENSBURY PLAZA I, LLC
Checklist Item CommentsPassed
Building Inspector Notes False 7/31/23 partial approval for rough plumbing
-plumbing under slab for sanitary drains and vents approved.
-provide an as built drawing for the addition of the grinder pump,
the floats and alarms at the grinder pump will need to be verified.
Pressure Test False
Pressure Test True
3" Vent Through Roof - 18" min False
Washing Machine Drain 2 inch minimum False
All Return Air Hard Duct Work False
5 psi or 10 ft. above highest conn. for 15 minutes True plumbing under slab verified with water head test.
Duct Testing Outside Conditioned Space False
Shower liner test (2" of water)False
Water Supply Piping False
Duct Insulation - if required in unheated spaces False
Duct work sealed properly False
Cleanout every 100 feet change of direction False
Plumbing Vent Vents in Place False
Air Test Gas Piping 10 psi for 10 Minutes False
Washing Machine Trap: 18"-42" discharge False
Air Head False
Air Head False
50 P.S.I for 15 minutes False
1 ½ inch minimum Drain Size False
Drain Vent True
Permit Card Visible From Road False 7/31/23 partial approval for rough plumbing.
plumbing under slab for sanitary drains and vents approved.
July 31, 2023 Page 1 of 1