Loading...
IM Inspection Worksheet_28-08-2023_11-44-57INSPECTION WORKSHEET (BINS-027452-2023) RC-0553-2020Case Number:Case Module:Permit Management 08/28/2023 Partial PassInspection Status:Inspection Date: Building InsulationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:5 Palmer Dr Queensbury, NY 12804 316.17-1-4 Company Name NameContact Type Applicant Brian Hayward Granted Permission Brian Hayward Primary Owner Karen Hayward Brian Hayward Checklist Item CommentsPassed Zip exterior sheathing, nailing & taping True Building Inspector Notes False 8/16/23 partial approval of insulation. - thermal insulation at second floor walls and ceiling only approved. R 49 @ ceiling, R 23 @ walls 8/28/23 partial approval for insulation. -insulation at garage exterior walls and ceiling approved. R 19 in walls with 1/2 ridged insolation continuous, R 30 in ceiling with 1/2 ridged insolation continuous. U Factors = .3 cfm for windows, .5 cfm for doors False Tub Shower R-20 with Vapor Barrier False Exterior wall outlets sealed True All Return Air Hard Duct Work False Duct work sealed properly / No duct tape False Duct Testing Outside Conditioned Space True House Wrap Taped at all Seams False Door / Window Sealed (No Insulation)True Air Seal Outside Penetrations False All Ductwork Sealed Return and Supply False Air Barrier behind Knee Walls False Blower Door Test False Duct Insulation - if required in unheated spaces False Combustion Air Supply for Furnace False Window Sealing True Duct Blaster Test for duct work, R-8, unhtd spaces False Permit Card Visible From Road True Proper Vent, Attic Vent True Insulation ResCheck ComCheck True R 49 @ ceilings, R 23 @ walls, second floor August 28, 2023 Page 1 of 1