IM Inspection Worksheet_18-09-2023_12-39-41INSPECTION WORKSHEET (MULT-027769-2023) CC-0273-2021Case Number:Case Module:Permit Management 09/18/2023 FailedInspection Status:Inspection Date: Multi-Dwelling, Hotel, Motel FinalInspection Type:Inspector:Mark Smith Job Address:Parcel Number:39 Longview Dr Queensbury, NY 12804 296.8-1-3 Company Name NameContact Type Applicant Richard E. Jones Associates Architect Richard E. Jones Associates Contractor Sano Rubin Granted Permission The Glen @ Hiland Meadows Memory CareNick Norton Sano Rubin Primary Owner The Glen @ Hiland Meadows Memory CareNick Norton Checklist Item CommentsPassed Roof Complete True Low flow toilet 1.3 gal/flushing cycle True Low flow toilet 1.3 gal/flushing cycle True September 18, 2023 Page 1 of 4 INSPECTION WORKSHEET (MULT-027769-2023) Checklist Item CommentsPassed Building Inspector Notes True 11/21/22 final commercial inspection not approved, please address the items listed below and call for recheck when ready - submit final approval letters from architect and engineer stating that the building was assembled in accordance with the approved plans and specifications - submit certification document from special inspection agency stating that all inspections have been completed and building was assembled in accordance with the approved plans and specifications -submit commissioning report for HVAC and electrical systems -submit air balancing report -submit electronic asbuilts for architectural, structural,plumbing,HVAC, electrical, fire sprinkler, and fire alarms systems. -final electrical inspection -blower door test results -final survey -complete all plumbing connections in each unit. - complete install of kitchens and countertops/ appliances in each unit. -vertical grab bars are required in each unit restroom. - install hand rail at east stair well. - install door closers and smoke seals at each unit door. - call for remaining fire caulking inspection in corridors when ready. - complete Fire Marshals items. 12/6/22 final inspection not approved, - verified second floor doors, smoke seals and self closing and latching at each room and stair wells. - fire caulking at first floor corridor connecting to existing building verified 12/15/22 final inspection of multi- dwelling approved for temporary C.O. Only. Please address the items listed below for final C.O. Approval. -provide electronic asbuilts. -provide electronic copies of all documentation - complete site work, final inspection by Code Compliance officer Bruce Frank will be required - complete caulking at exterior of building - complete all work in rooms in accordance with the Sanyo Rubin priority schedule - install fire glass at stairwell doors. Remove temporary fire rated plywood. -install door at east entrance near connection to existing building. -open hallways to existing building. - adjust exterior doors at porches, some of these doors observed to be hard to open/ close. -clean construction materials from store rooms. - complete work at wellness center. - submit final survey 3/6/23 Multi-Dwelling Final Inspection Not Approved Remaining Items: - Provide Final Electrical Certificate for Wellness Center Office, Gym, Yoga Room, Corridor and Employee Break Room. - Install cover plates on exposed electrical boxes. - Install access doors in ceiling of employee bathroom. - Install Handicapped Bathroom Signage on corridor wall next to Unisex Handicapped Bathroom. September 18, 2023 Page 2 of 4 INSPECTION WORKSHEET (MULT-027769-2023) Checklist Item CommentsPassed - Employee Break Room has to many smoke detectors in room. Some of the detectors are existing please correct. - Submit a letter of substantial completion from the architect and engineer that the Wellness Area minus the Pool Area has been completed in accordance with the approved plans, specifications and 2020 COMcheck. - Submit HVAC Air Balancing Report for Wellness Area minus the Pool Area. - Renew Temporary Certificate of Occupancy. Please pay the additional renewal fee of $165.00 to extend Temporary CO till 6/15/23. 6/13/23 final inspection for multi dwelling not approved - work at pool not completed at this time, contractor to renew temporary C.O. 9 18 23 final inspection for multi dwelling not approved. - work at pool not completed, I spoke to Wayne, he will renew the temp C.O. Bldg Access All Sides 20ft Drivable Surface True Final Survey Plot Plan False Window guards req:<2' above floor/6' above grade True Exterior timer for exterior lighting True Final Electrical True Safety glazing: w/in 5' of tub/shower True Building/Apartment Num on Bldg or Driveway True Public Sewer Sign-Off True Fire Walls 1, 2, 3 Hour / Fire Door ¾, 1 ½, 2 Hour True Interior Handrails Stairs 1 or More Risers True Wood deck: 2'+ from grade dia bracing required True Inter Connected True Dryer Duct Max Length 35', Labeled Over 35'True Engineer or Architect Approval True Furnace/Hot Water Heater operating True Outside every bedroom area True Blower Door Test Certification True OK to Issue C/O False Headroom 6ft 8 on Stairs True Carbon Monoxide Alarm – lowest sleeping level True Guardrails 42", Balusters 4 Minimum Spacing True Interior/Exterior Railings 34 into 38 inch True 20 Minute Fire Door/Self-Closing Hardware True Light Ventilation per Room Safety Glazing True Universal Symbol of Access displayed True Plumb Vent Thru Roof Minimum 6 True Ext rails , Balconies Landing 30 inches or more True Every level, Every bedroom True within 10' of all sleeping areas True September 18, 2023 Page 3 of 4 INSPECTION WORKSHEET (MULT-027769-2023) Checklist Item CommentsPassed Relief Valve ,Heat Trap/Water Temp 110 deg or less True Bathroom / Kitchen Watertight True Bathroom Fans Plumbing Fixtures Complete True Outside Spigots have Air Gap True OK to Issue Temporary C/O True 3/6/23 Multi-Dwelling Final Inspection Not Approved Remaining Items: - Provide Final Electrical Certificate for Wellness Center Office, Gym, Yoga Room, Corridor and Employee Break Room. - Install cover plates on exposed electrical boxes. - Install access doors in ceiling of employee bathroom. - Install Handicapped Bathroom Signage on corridor wall next to Unisex Handicapped Bathroom. - Employee Break Room has to many smoke detectors in room. Some of the detectors are existing please correct. - Submit a letter of substantial completion from the architect and engineer that the Wellness Area minus the Pool Area has been completed in accordance with the approved plans, specifications and 2020 COMcheck. - Submit HVAC Air Balancing Report for Wellness Area minus the Pool Area. - Renew Temporary Certificate of Occupancy. Please pay the additional renewal fee of $165.00 to extend Temporary CO till 6/15/23. Battery backup True Fire Separation, ¾, 1, 2 hr.True H/C Accessibility Parking Signage True Smoke Carbon Monoxide Detectors Interconnected True Ext Finish /Grade Complete/6 in 10ft or Equivalent True Doors 36 Lever Handles True Carbon Monoxide Detectors:True Attic Access 30 x 20 x 30 (h)True 3' from Baths True Smoke Detectors:True Int Handrails Balconies/Landing 30 inches or more True September 18, 2023 Page 4 of 4