IM Inspection Worksheet_18-09-2023_12-39-41INSPECTION WORKSHEET (MULT-027769-2023)
CC-0273-2021Case Number:Case Module:Permit Management
09/18/2023 FailedInspection Status:Inspection Date:
Multi-Dwelling, Hotel, Motel FinalInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:39 Longview Dr
Queensbury, NY 12804
296.8-1-3
Company Name NameContact Type
Applicant Richard E. Jones Associates
Architect Richard E. Jones Associates
Contractor Sano Rubin
Granted Permission The Glen @ Hiland Meadows Memory CareNick Norton
Sano Rubin
Primary Owner The Glen @ Hiland Meadows Memory CareNick Norton
Checklist Item CommentsPassed
Roof Complete True
Low flow toilet 1.3 gal/flushing cycle True
Low flow toilet 1.3 gal/flushing cycle True
September 18, 2023 Page 1 of 4
INSPECTION WORKSHEET (MULT-027769-2023)
Checklist Item CommentsPassed
Building Inspector Notes True 11/21/22 final commercial inspection not approved, please
address the items listed below and call for recheck when ready
- submit final approval letters from architect and engineer stating
that the building was assembled in accordance with the approved
plans and specifications
- submit certification document from special inspection agency
stating that all inspections have been completed and building was
assembled in accordance with the approved plans and
specifications
-submit commissioning report for HVAC and electrical systems
-submit air balancing report
-submit electronic asbuilts for architectural,
structural,plumbing,HVAC, electrical, fire sprinkler, and fire alarms
systems.
-final electrical inspection
-blower door test results
-final survey
-complete all plumbing connections in each unit.
- complete install of kitchens and countertops/ appliances in each
unit.
-vertical grab bars are required in each unit restroom.
- install hand rail at east stair well.
- install door closers and smoke seals at each unit door.
- call for remaining fire caulking inspection in corridors when
ready.
- complete Fire Marshals items.
12/6/22 final inspection not approved,
- verified second floor doors, smoke seals and self closing and
latching at each room and stair wells.
- fire caulking at first floor corridor connecting to existing building
verified
12/15/22 final inspection of multi- dwelling approved for temporary
C.O. Only. Please address the items listed below for final C.O.
Approval.
-provide electronic asbuilts.
-provide electronic copies of all documentation
- complete site work, final inspection by Code Compliance officer
Bruce Frank will be required
- complete caulking at exterior of building
- complete all work in rooms in accordance with the Sanyo Rubin
priority schedule
- install fire glass at stairwell doors. Remove temporary fire rated
plywood.
-install door at east entrance near connection to existing building.
-open hallways to existing building.
- adjust exterior doors at porches, some of these doors observed
to be hard to open/ close.
-clean construction materials from store rooms.
- complete work at wellness center.
- submit final survey
3/6/23 Multi-Dwelling Final Inspection Not Approved
Remaining Items:
- Provide Final Electrical Certificate for Wellness Center Office,
Gym, Yoga Room, Corridor and Employee Break Room.
- Install cover plates on exposed electrical boxes.
- Install access doors in ceiling of employee bathroom.
- Install Handicapped Bathroom Signage on corridor wall next to
Unisex Handicapped Bathroom.
September 18, 2023 Page 2 of 4
INSPECTION WORKSHEET (MULT-027769-2023)
Checklist Item CommentsPassed
- Employee Break Room has to many smoke detectors in room.
Some of the detectors are existing please correct.
- Submit a letter of substantial completion from the architect and
engineer that the Wellness Area minus the Pool Area has been
completed in accordance with the approved plans, specifications
and 2020 COMcheck.
- Submit HVAC Air Balancing Report for Wellness Area minus the
Pool Area.
- Renew Temporary Certificate of Occupancy. Please pay the
additional renewal fee of $165.00 to extend Temporary CO till
6/15/23.
6/13/23 final inspection for multi dwelling not approved
- work at pool not completed at this time, contractor to renew
temporary C.O.
9 18 23 final inspection for multi dwelling not approved.
- work at pool not completed, I spoke to Wayne, he will renew the
temp C.O.
Bldg Access All Sides 20ft Drivable Surface True
Final Survey Plot Plan False
Window guards req:<2' above floor/6' above grade True
Exterior timer for exterior lighting True
Final Electrical True
Safety glazing: w/in 5' of tub/shower True
Building/Apartment Num on Bldg or Driveway True
Public Sewer Sign-Off True
Fire Walls 1, 2, 3 Hour / Fire Door ¾, 1 ½, 2 Hour True
Interior Handrails Stairs 1 or More Risers True
Wood deck: 2'+ from grade dia bracing required True
Inter Connected True
Dryer Duct Max Length 35', Labeled Over 35'True
Engineer or Architect Approval True
Furnace/Hot Water Heater operating True
Outside every bedroom area True
Blower Door Test Certification True
OK to Issue C/O False
Headroom 6ft 8 on Stairs True
Carbon Monoxide Alarm – lowest sleeping level True
Guardrails 42", Balusters 4 Minimum Spacing True
Interior/Exterior Railings 34 into 38 inch True
20 Minute Fire Door/Self-Closing Hardware True
Light Ventilation per Room Safety Glazing True
Universal Symbol of Access displayed True
Plumb Vent Thru Roof Minimum 6 True
Ext rails , Balconies Landing 30 inches or more True
Every level, Every bedroom True
within 10' of all sleeping areas True
September 18, 2023 Page 3 of 4
INSPECTION WORKSHEET (MULT-027769-2023)
Checklist Item CommentsPassed
Relief Valve ,Heat Trap/Water Temp 110 deg or less True
Bathroom / Kitchen Watertight True
Bathroom Fans Plumbing Fixtures Complete True
Outside Spigots have Air Gap True
OK to Issue Temporary C/O True 3/6/23 Multi-Dwelling Final Inspection Not Approved
Remaining Items:
- Provide Final Electrical Certificate for Wellness Center Office,
Gym, Yoga Room, Corridor and Employee Break Room.
- Install cover plates on exposed electrical boxes.
- Install access doors in ceiling of employee bathroom.
- Install Handicapped Bathroom Signage on corridor wall next to
Unisex Handicapped Bathroom.
- Employee Break Room has to many smoke detectors in room.
Some of the detectors are existing please correct.
- Submit a letter of substantial completion from the architect and
engineer that the Wellness Area minus the Pool Area has been
completed in accordance with the approved plans, specifications
and 2020 COMcheck.
- Submit HVAC Air Balancing Report for Wellness Area minus the
Pool Area.
- Renew Temporary Certificate of Occupancy. Please pay the
additional renewal fee of $165.00 to extend Temporary CO till
6/15/23.
Battery backup True
Fire Separation, ¾, 1, 2 hr.True
H/C Accessibility Parking Signage True
Smoke Carbon Monoxide Detectors Interconnected True
Ext Finish /Grade Complete/6 in 10ft or Equivalent True
Doors 36 Lever Handles True
Carbon Monoxide Detectors:True
Attic Access 30 x 20 x 30 (h)True
3' from Baths True
Smoke Detectors:True
Int Handrails Balconies/Landing 30 inches or more True