Loading...
IM Inspection Worksheet_06-10-2023_13-05-50INSPECTION WORKSHEET (SEP-028134-2023) RC-0532-2023Case Number:Case Module:Permit Management 10/06/2023 Partial PassInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:19 Park Ave Queensbury, NY 12804 303.16-1-64 Company Name NameContact Type Applicant Ronald Dufour Sr Contractor Windy Hollow Homes Inc Granted Permission Ronald Dufour Sr Primary Owner Ronald Dufour Sr Checklist Item CommentsPassed Building Inspector Notes True system is for a manufactured home to be placed on slab Soil Type: Sand False ETU Maintenance Contract provided False Size of Stone True #2 Waterline separation distance True Building to Tank True 4" SCHD [Provide extension collar if Yes]False Tank to Distribution Box False Opening Sealed:False End Cap True Absorbtion Fields: Total Length True 100 ft Septic system field above flood plain True Foundation to Tank False slab next to system Engineer Report and As-Built False please provide engineer asbuilt report Location of system on property False right side of property Inlet & Outlet manholes 12"+ below grade False Type of Water: Municipal / Well Water True municipal Locations / Separations False Depth of Trenches True 16" Separation of Pits False Length of Each Trench True 50 ft System Use Status False Conforms as per Plot Plan False Size of tank True 1000 Distribution box to Field / Pit True 4" sewer and drain Foundation to Absorption False InletOutlet Pipes & Baffles True October 06, 2023 Page 1 of 1