Loading...
IM Inspection Worksheet_04-10-2023_15-34-04INSPECTION WORKSHEET (COMFIN-028106-2023) CC-0539-2021Case Number:Case Module:Permit Management 10/04/2023 FailedInspection Status:Inspection Date: Commercial Final InspectionInspection Type:Inspector:Mark Smith Job Address:Parcel Number:708 Quaker Rd Queensbury, NY 12804 303.15-1-12 Company Name NameContact Type Applicant TWAS QUAKER ROAD LLC Architect Reztark Design Studio Dan Berger Contractor Eric Alexander Ferrandino & Son Dave Coven Granted Permission TWAS QUAKER ROAD LLC Primary Owner TWAS QUAKER ROAD LLC Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle False Handicapped Ramps False Final Survey False October 04, 2023 Page 1 of 5 INSPECTION WORKSHEET (COMFIN-028106-2023) Checklist Item CommentsPassed Building Inspector Notes False 8/29/23 final commercial inspection not approved, please address the items listed below and call for recheck when ready. -complete inspections for framing and insulation. -provide all special inspection reports, refer to email from 7/29/21 -provide proof of final electrical inspection. -a final inspection by Code Compliance Officer Bruce Frank will be required. -provide a letter of substantial completion from design architect & engineer -Handicapped signs and grab bars are required at both restrooms. -final sign off from Town of Queensbury sewer & Water department. - flush handle at exterior restroom should be on the open side of the toilet. -complete Fire Marshals items. - provide spec sheet for vacuum equipment - install ceiling a vacuum equipment room -provide handicapped signs and parking lot striping as per approved site plan. 10/4/2023 Commercial Final Inspection Not Approved Complete the following items listed below: - Complete all outstanding framing and insulation items in roof area. - Secure all fsk25 foil paper to underside of ceiling insulation on warm side and make sure that all gaps/daylight at tops of exterior walls and ceiling meeting points are sealed tight with insulation. - Submit all outstanding required special inspection reports, refer to email dated 7/29/21 - Complete all electrical items and obtain a Final Electrical Inspection from an approved Town of Queensbury electrical inspector. - Remove all existing abandoned electrical wiring in roof area above the ceiling insulation. - Remove all abandoned plumbing in roof area above the ceiling insulation. - Remove all miscellaneous construction debris in the roof area above the ceiling insulation. - Submit final certified electronic as-builts for architectural, structural, plumbing, heating and electrical plans. - Schedule a final inspection with Bruce Frank the code compliance officer regarding the completion of the site work in accordance with the approved site plan. - Submit a final approval letter from the Architect and Engineer stating all work has been completed in accordance with the approved plans and specifications. --Verify that the Town of Queensbury Water and Sewer Department have performed their final inspection and have signed off on the project. - Install new toilet tank with flush handle on open side at exterior unisex handicap bathroom. - Install receptacle cover plate on receptacle in exterior handicap bathroom. - Mirror needs to be lowered to 40" from finish floor to bottom edge of mirror in exterior handicap bathroom. - No hot water in bathrooms please turn on to verify. - Suspended space heater in mechanical room needs condensate drip line extended to stand pipe with trap at wall. - Complete all outstanding Fire Marshal items. - Install handicapped parking signs and no parking signs in October 04, 2023 Page 2 of 5 INSPECTION WORKSHEET (COMFIN-028106-2023) Checklist Item CommentsPassed designated parking and access aisles already striped. Install handicapped sign in parking spot and no parking sign in access aisle. Bottom of signs need to be 60" minimum from finish pavement. . Bldg Access All Sides 20ft Drivable Surface False H/C rear grab bar 36" with 24" to open side False Backflow Preventors where required False Public Toilet Room Handicapped Accessible False Exterior timer for exterior lighting False Hydraulic Elevators: Oil Seperator REQUIRED False Firewalls, 2 Hr, 3 Hr / Fire Dampers / Fire Doors False Handicap parking striping False Boiler/Furnace Enclosurer Fire Ext System False Int/Ext Balusters 4 inch Spacing Platform Decks False Bldg Num or Tenant Address on Bld or Drive False Ramps: 12" extension top & bottom False Attic Access Insulation = Attic R- Value False Individual storage units 5% of each type False Gas Shut-off Exposed & Regulator 12" min abv grd False Water Fountain or Cooler False As-built Septic System Layout Required False Public Sewer Sign-Off False Bollard Protection:4' on ctr/3' abv grd, gas meter False Handicapped Service Counters 34 inch False Gas Furnace Shut Off False 12" beyond top & bottom False Int/Ext Guardrails 42 inch Platform Decks False H/C side & rear grab bars 36" above floor False HVAC air balancing report False H/C sinks 34" above floor False Hydraulic Elevators: Non-comb. Plumbing REQUIRED False Wood deck: 2'+ from grade dia bracing required False Low Water Shut Off for Boilers False H/C 18" minimum vertical grab bar False Engineer or Architect Approval False Ramps: 6" or more need handrails False Hot water drain pan to indirect waste False Chimney Rain Cap Installed False Foam in basement/attics covered w/thermal barrier False Oil Furnace Shut-Off at Entrance to Furnace Area False H/C grab bar: 42" side, 12" from center False Ceiling Fire Stopping, 3,000 sq. ft. Wood Frame False October 04, 2023 Page 3 of 5 INSPECTION WORKSHEET (COMFIN-028106-2023) Checklist Item CommentsPassed OK to Issue C/O False 10/4/2023 Commercial Final Inspection Not Approved Complete the following items listed below: - Complete all outstanding framing and insulation items in roof area. - Secure all fsk25 foil paper to underside of ceiling insulation on warm side and make sure that all gaps/daylight at tops of exterior walls and ceiling meeting points are sealed tight with insulation. - Submit all outstanding required special inspection reports, refer to email dated 7/29/21 - Complete all electrical items and obtain a Final Electrical Inspection from an approved Town of Queensbury electrical inspector. - Remove all existing abandoned electrical wiring in roof area above the ceiling insulation. - Remove all abandoned plumbing in roof area above the ceiling insulation. - Remove all miscellaneous construction debris in the roof area above the ceiling insulation. - Submit final certified electronic as-builts for architectural, structural, plumbing, heating and electrical plans. - Schedule a final inspection with Bruce Frank the code compliance officer regarding the completion of the site work in accordance with the approved site plan. - Submit a final approval letter from the Architect and Engineer stating all work has been completed in accordance with the approved plans and specifications. --Verify that the Town of Queensbury Water and Sewer Department have performed their final inspection and have signed off on the project. - Install new toilet tank with flush handle on open side at exterior unisex handicap bathroom. - Install receptacle cover plate on receptacle in exterior handicap bathroom. - Mirror needs to be lowered to 40" from finish floor to bottom edge of mirror in exterior handicap bathroom. - No hot water in bathrooms please turn on to verify. - Suspended space heater in mechanical room needs condensate drip line extended to stand pipe with trap at wall. - Complete all outstanding Fire Marshal items. - Install handicapped parking signs and no parking signs in designated parking and access aisles already striped. Install handicapped sign in parking spot and no parking sign in access aisle. Bottom of signs need to be 60" minimum from finish pavement. . Chimney / B Vent / Direct Vent Location False HVAC Vent Terminal 10' from Lot Line & Openings False Attic Access Gasketed False Jack posts in basement lagged at top and bottom False Bottled or cooler water provided False Smoke Vents Or Fan, if required False Crawl space/knee wall access insulated & gasketed False Bollard Protection: 15" footings & 3' below grade False H/C toilet flush handle on open side False Floor Bathroom Watertight Other Floors Okay False October 04, 2023 Page 4 of 5 INSPECTION WORKSHEET (COMFIN-028106-2023) Checklist Item CommentsPassed Ramps: 4" toe kick each side of ramp False Plumbing Vent Through Roof/Roof complete False Outside Spigots have Air Gap False Electronic as-builts False Doors 36 inch wLever Hand Panic Hardware, if req False CSST/other piping in conduit if buried,if required False Ext Finish /Grade Complete/6 in 10ft or Equivalent False Relief Valve ,Heat Trap/Water Temp 110 deg or less False Final Electrical / Flex Gas Piping Bonded False Exits At Grade Or Platform 36 (w) x 44 (l)False Blower Door Test False Step risers: riser 7" & treads 11"False OK to Issue Temporary C/O False Handicapped water cooler installed False Universal Symbol of Access displayed False H/C mirrors 40" above floor False Active Listening System and Signage Assembly Space False Propane Tank: Proper Setback from Prop Line/Struct False Stair rail 34"–38": both sides of stairway False Handicapped Units False Special Inspections False Pull down stairs boxed out and insulated False Elevator Operation and Signage Shaft Sealed False Occupancy sensor lighting control False Handicapped Bath/Parking Lot Signage False Site Plan Variance required False Attic Access 30 x 20 x 30 (h)False Stockroom /Storage/Receiving/Shipping Room False Elevator Hoistways Pressurized False Vestibules for Exit doors greater than 3000 sq. ft False ¾ Hour Corridor Doors & Closers False H/C vertical grab bar 39" from floor and corner False October 04, 2023 Page 5 of 5