Loading...
IM Inspection Worksheet_27-10-2023_15-39-22INSPECTION WORKSHEET (SEP-028590-2023) SEP-0236-2023Case Number:Case Module:Permit Management 10/27/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:366 Cleverdale Rd Queensbury, NY 12804 226.12-1-62 Company Name NameContact Type Applicant Katheryn McMorrow Contractor Crandall Excavating Engineer Hutchins Engineering Granted Permission Daniel McMorrow Primary Owner Katheryn McMorrow Checklist Item CommentsPassed Building Inspector Notes True verified operation of unit / flow to D-box / floats & alarm with Pete Carr Soil Type: Sand False ETU Maintenance Contract provided True please provide ETU maintenance agreement ? received Size of Stone True # 2 Final Electrical True received Roof gutters don't discharge over leach field False Waterline separation distance True Building to Tank True 4" SCHD 40 Public Sewer Sign-Off False [Provide extension collar if Yes]True Tank to Distribution Box True 2" force main from pump station Opening Sealed:True 90% alarm level activates True End Cap False lines are looped Absorbtion Fields: Total Length True 11x29 bed system Foundation to Tank True see asbuilt Engineer Report and As-Built True received Location of system on property True Inlet & Outlet manholes 12"+ below grade True Type of Water: Municipal / Well Water True Lake Locations / Separations True see asbuilt Depth of Trenches True bed Length of Each Trench True 2 lines @ 25ft looped @ 6ft System Use Status True Conforms as per Plot Plan True Size of tank True FUJI clean model CE-5 ETU Distribution box to Field / Pit False 4" SDR 35 Foundation to Absorption True see asbuilt InletOutlet Pipes & Baffles True outlet from FUJI clean CE-5 ETU to pump chamber October 27, 2023 Page 1 of 2 INSPECTION WORKSHEET (SEP-028590-2023) Checklist Item CommentsPassed 50% alarm level activates True October 27, 2023 Page 2 of 2