Loading...
IM Inspection Worksheet_09-11-2023_15-43-09INSPECTION WORKSHEET (RESFINAL-028779-2023) RC-0553-2022Case Number:Case Module:Permit Management 11/09/2023 Partial PassInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:21 Duncan Cv Queensbury, NY 12804 226.16-1-7 Company Name NameContact Type Applicant AJA Architecture & Planning Architect AJA Architecture & Planning Contractor Hilltop Construction Granted Permission Stephen Orban MEGHAN ORBAN Primary Owner Stephen Orban MEGHAN ORBAN Checklist Item CommentsPassed bedroom(s) with gas appliances False Low flow toilet 1.3 gal/flushing cycle False Bathroom Fans, if no window False 3" Plumbing Vent through roof minimum 18 inch False Grade away from foundation: 6" down, 10' out False Final Survey Plot Plan False Sewer Dept. Inspection Sticker False Window guards req:<2' above floor/6' above grade False Interior privacy/trim/doors/main entrance 36 False Backflow Preventors where required False Basement wall insulation R- value verified False Emergency egress below grade False Fuel Tanks above flood plain elevation False Intake Openings False Safety glazing: w/in 5' of tub/shower False Site Plan / Variance required False Seals on Garage Doors, esp. Wood False Not less than 3' horiz from opening of bthrn False Basement ceiling covered 2x8 fl joist or less False Attic Access Insulation = Attic R- Value False Gas Shut-off Exposed & Regulator 12" min abv grd False Platform at all exterior doors False Fireblocking at fl joist 80 s.f. or less False Garage Floor Pitched False Buried Fuel Tanks anchored in flood zone False Wood deck: 2'+ from grade dia bracing required False Inter Connected False Arc Fault Breaker Habitable Spaces False November 09, 2023 Page 1 of 3 INSPECTION WORKSHEET (RESFINAL-028779-2023) Checklist Item CommentsPassed Dryer Duct Max Length 35', Labeled Over 35'False Energy Sticker on Elec. Panel:R-Val. & Heating Sys False Furnace/Hot Water Heater operating False Hot water drain pan to indirect waste False Fresh Air Intake False Chimney Rain Cap Installed False Basement stairs closed rise greater than 4 inches False Foam in basement/attics covered w/thermal barrier False Outside every bedroom area False Oil Furnace Shut-Off at Entrance to Furnace Area False Blower Door Test Certification False Fin Elect; Energy Saving Light Bulbs 90 Percent False Heat detector in garage False Gas Log In Sealed or Glass Enclosure False OK to Issue C/O False Truss ID Signage Installed at Electrical Meter False Range Hood 400+ cfm-Fresh Air REQUIRED False 4 inch Building Number Address visible from road False CO in bedrooms w/gas appliances False HVAC Vent Terminal 10' from Lot Line & Openings False Attic Access Gasketed False Jack posts in basement lagged at top and bottom False Flood Plain Certification, if required False Guard at deck, porches 36" or more False 6" clearance to sill plate False Crawl space/knee wall access insulated & gasketed False 5/8" Type X with Living Space Above False 20 Minute Fire Door/Self-Closing Hardware False Furnace shut-off w/in 30 ft. or w/in line of site False Handrail Termination at Newell Post or Wall False Battery backup False OK to Issue Temporary C/O False 1/2" Gypsum or House Wall and Gable False Fresh air supply 3' from grade False Floor truss, draft stop- fin base 1,000 sq. ft.False 4+ Deck Joist Ledger Connections-24" From Ends False Handrail 4 or more risers False Every level, Every bedroom False As Built Septic System False Carbon Monoxide Detectors:False Deck Ledger-Bolted per Code False Flex Gas Pipe Bonding False November 09, 2023 Page 2 of 3 INSPECTION WORKSHEET (RESFINAL-028779-2023) Checklist Item CommentsPassed Smoke Detectors:False Plumbing fixtures False 1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. Truss False General Comments True I will return to site Monday 11/13 to verify septic, then send full report. Tom has list for what is needed for residence inside. Engineer has to verify septic, provide his asbuilt report along with site plan certification for zoning. A Temp C/O will have to be issued. 11/9/23 Guards at stairs,decks,patios 30" + above grade False Basement Egress: 5s.f. window w/sill or Bilco door False Pull down stairs boxed out and insulated False Attic Access 22 x 30 minimum False Chimney Height / B Vent / Direct Vent Location False HRV or ERV Installed per Bedroom Requirements False Duct work sealed properly False Electronic as-builts False within 10' of all sleeping areas False Encl. Stairs Sheetrock Underside minimum ½ Gypsum False Knee wall/Crawl space 18" x 24"False CSST/other piping in conduit if buried,if required False Outside Spigots have Air Gap False Low water shut-off boiler False All Hot Water Systems: 3/4" or larger piping R-3 False Roof Complete / Exterior Finish Complete False Relief Valve ,Heat Trap/Water Temp 110 deg or less False Interior/Exterior Railings 34 to 38 False Bathroom / Kitchen Watertight False on all levels w/gas appliances (i.e. furnace)False Foundation insulation to floor False Propane Tank: Proper Setback from Prop Line/Struct False Guard at stairwell at 34" or more False November 09, 2023 Page 3 of 3