Loading...
IM Inspection Worksheet_09-11-2023_12-59-10INSPECTION WORKSHEET (FMGAS-028778-2023) RC-0553-2022Case Number:Case Module:Permit Management 11/09/2023 PassedInspection Status:Inspection Date: Gas Fireplace/StoveInspection Type:Inspector:Tyson Converse Job Address:Parcel Number:21 Duncan Cv Queensbury, NY 12804 226.16-1-7 Company Name NameContact Type Applicant AJA Architecture & Planning Architect AJA Architecture & Planning Contractor Hilltop Construction Granted Permission Stephen Orban MEGHAN ORBAN Primary Owner Stephen Orban MEGHAN ORBAN Checklist Item CommentsPassed Fire Marshal Notes True Installed per manual True Floor Protection True FOLLOWUP on flooring CO Detection True Firestop(s) - Wall Penetration True Caulking needed Vent Chimney Termination True CSST Bonding True Connected to flue: flue gases not mixing w/rm air True Gas Shut-off Valve True Mantel-height above fp opening True 14" Model True Phoenix 42-oft Weather cap installed True Hearth Extension (if any)True Noncombustibles Vent Clearance to Combustibles True Manufacturer True Heat glow Witness Operation True worked properly Clearances to Combustibles (all sides)True Firestop(s) - Vertical Chase True Fire caulk At penetration at roof needs to be sealed November 09, 2023 Page 1 of 1