Loading...
IM Inspection Worksheet_27-11-2023_13-55-02INSPECTION WORKSHEET (SEP-029021-2023) SEP-0746-2022Case Number:Case Module:Permit Management 11/27/2023 Partial PassInspection Status:Inspection Date: SepticInspection Type:Inspector:John O'Brien Job Address:Parcel Number:22 Ward Ln Queensbury, NY 12804 240.6-1-6 Company Name NameContact Type Applicant David Barlow Engineer Hutchins Engineering Granted Permission David Barlow Primary Owner David Barlow Checklist Item CommentsPassed November 27, 2023 Page 1 of 4 INSPECTION WORKSHEET (SEP-029021-2023) Checklist Item CommentsPassed Building Inspector Notes False 4/27/23 partial approval for septic system - placement of two 1500 gallon poly holding tank approved, ok to back fill. Call for recheck when remaining components of septic system are installed. 5/26/23 partial approval for septic system - connection of 2" forced main at holding tank verified - connection of the two holding tanks with 4" SDR 35 verified. Ok to back fill holding tanks. Items remaining - verify pump tank and alarms are operational. - verify alarms and water shut off solenoid are operational at holding tank. -provide as built drawing from design engineer at completion of installation of septic system. - provide proof of final electrical inspection ( at completion of project) 9/15/23 Septic System Partial Approval of Holding Tank System Components Only! - alarms and shut off solenoid verified. - alarms at grinder pump verified. - proof of final electric verified. Items remaining - Submit certified as-built drawing from design engineer 11/7/23 Left message with Tom Center on status of septic issues by David Dickey. 11/17/23 As per Tom Center's email requesting closing out the septic system permit for 22 Ward Lane due to the fact that Mr. Dickey has postponed two meetings and has not forwarded his concerns with the septic system installed on the Barlow property. Mr. Dickey was copied on the email and has responded. He has requested more time to submit a detailed response of his concerns. He has listed a brief summary of some of his concerns which Tom Center the design engineer will address and respond. 11/27/23 Spoke with Tom Center and John Strough about the concerns that David Dickey the neighbor of the Barlows has raised regarding the newly installed holding tank system at 22 Ward Lane. After speaking with John Strough Tom Center will draft a letter explaining in detail that the holding tank system has been installed in accordance with the approved septic variance with no major modifications allowing for the approval of the septic system. John Strough stated that if there are issues that occur in the future then they will need to be addressed accordingly. Final Electrical True Commonwealth Waterline separation distance True Building to Tank True 2" Pump line from grinder pump in residence to holding #1 Tank to Distribution Box True 4" SCH40 PVC from holding tank #1 to holding tank #2 Opening Sealed:True 90% alarm level activates True November 27, 2023 Page 2 of 4 INSPECTION WORKSHEET (SEP-029021-2023) Checklist Item CommentsPassed Foundation to Tank True Engineer Report and As-Built False 9/15/23 Septic System Partial Approval of Holding Tank System Components Only! - alarms and shut off solenoid verified. - alarms at grinder pump verified. - proof of final electric verified. Items remaining - Submit certified as-built drawing from design engineer 11/27/23 Spoke with Tom Center and John Strough about the concerns that David Dickey the neighbor of the Barlows has raised regarding the newly installed holding tank system at 22 Ward Lane. After speaking with John Strough Tom Center will draft a letter explaining in detail that the holding tank system has been installed in accordance with the approved septic variance with no major modifications allowing for the approval of the septic system. John Strough stated that if there are issues that occur in the future then they will need to be addressed accordingly. Water shut off activates at 90% full True Location of system on property False 9/15/23 Septic System Partial Approval of Holding Tank System Components Only! - alarms and shut off solenoid verified. - alarms at grinder pump verified. - proof of final electric verified. Items remaining - Submit certified as-built drawing from design engineer 11/27/23 Spoke with Tom Center and John Strough about the concerns that David Dickey the neighbor of the Barlows has raised regarding the newly installed holding tank system at 22 Ward Lane. After speaking with John Strough Tom Center will draft a letter explaining in detail that the holding tank system has been installed in accordance with the approved septic variance with no major modifications allowing for the approval of the septic system. John Strough stated that if there are issues that occur in the future then they will need to be addressed accordingly. Type of Water: Municipal / Well Water True Lake water supply System Use Status False 9/15/23 Septic System Partial Approval of Holding Tank System Components Only! - alarms and shut off solenoid verified. - alarms at grinder pump verified. - proof of final electric verified. Items remaining - Submit certified as-built drawing from design engineer 11/7/23 Left message with Tom Center on status of septic issues by David Dickey. 11/27/23 Spoke with Tom Center and John Strough about the concerns that David Dickey the neighbor of the Barlows has raised regarding the newly installed holding tank system at 22 Ward Lane. After speaking with John Strough Tom Center will draft a letter explaining in detail that the holding tank system has been installed in accordance with the approved septic variance with no major modifications allowing for the approval of the septic system. John Strough stated that if there are issues that occur in the future then they will need to be addressed accordingly. November 27, 2023 Page 3 of 4 INSPECTION WORKSHEET (SEP-029021-2023) Checklist Item CommentsPassed Conforms as per Plot Plan False 9/15/23 Septic System Partial Approval of Holding Tank System Components Only! - alarms and shut off solenoid verified. - alarms at grinder pump verified. - proof of final electric verified. Items remaining - Submit certified as-built drawing from design engineer 11/27/23 Spoke with Tom Center and John Strough about the concerns that David Dickey the neighbor of the Barlows has raised regarding the newly installed holding tank system at 22 Ward Lane. After speaking with John Strough Tom Center will draft a letter explaining in detail that the holding tank system has been installed in accordance with the approved septic variance with no major modifications allowing for the approval of the septic system. John Strough stated that if there are issues that occur in the future then they will need to be addressed accordingly. Size of tank True 2 1500 gallon holding tanks InletOutlet Pipes & Baffles True 50% alarm level activates True November 27, 2023 Page 4 of 4