IM Inspection Worksheet_13-12-2023_14-58-04INSPECTION WORKSHEET (FDTN-029361-2023)
RC-0556-2023Case Number:Case Module:Permit Management
12/13/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:78 Queensbury Ave
Queensbury, NY 12804
303.16-1-19
Company Name NameContact Type
Applicant Jameson O'Dell
Granted Permission Jameson O'Dell
Primary Owner Jameson O'Dell
Checklist Item CommentsPassed
Building Inspector Notes False 10/18/23 partial approval for foundation.
-Footings at front and rear of the building approved. 3 rows of # 4
rebar continuous.
- provide an updated plan with engineer stamp showing the
changes and additional rebar at the existing foundation.
11/6/23 partial approval for foundation.
- Foundation walls at back extension only approved
11/22/23 partial approval for foundation.
- Frost walls at front extension approved.
- 2" ridged insulation poly, and wire mesh under slab verified at
back extension.
12/13/23 partial approval for foundation.
-welded wire mesh and 2" ridged insulation under slab at front
extension verified.
- Rebar at south foundation wall under main house verified,
stamped plans for this have been submitted.
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True 11/6/23 partial approval for foundation.
- Foundation walls at back extension only approved
12/13/23 partial approval for foundation.
-welded wire mesh and 2" ridged insulation under slab at front
extension verified.
- Rebar at south foundation wall under main house verified,
stamped plans for this have been submitted.
5 psi or 10 ft. above highest conn. for 15 minutes False
Masonry Wall False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
December 13, 2023 Page 1 of 2
INSPECTION WORKSHEET (FDTN-029361-2023)
Checklist Item CommentsPassed
Monolithic Slab True 10/18/23 partial approval for foundation.
-Footings at front and rear of the building approved. 3 rows of # 4
rebar continuous.
- provide an updated plan with engineer stamp showing the
changes and additional rebar at the existing foundation.
Footings True 10/18/23 partial approval for foundation.
-Footings at front and rear of the building approved. 3 rows of # 4
rebar continuous.
- provide an updated plan with engineer stamp showing the
changes and additional rebar at the existing foundation.
Footing Drain stone - 6 mil poly False
Piers False
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place False
Reinforcement in Place True 11/6/23 partial approval for foundation.
- Foundation walls at back extension only approved
3 rows of #4 rebar continuous
Permit Card Visible From Road False
Poly Under Slab True 12/13/23 partial approval for foundation.
-welded wire mesh and 2" ridged insulation under slab at front
extension verified.
- Rebar at south foundation wall under main house verified,
stamped plans for this have been submitted.
Footing Dowels or Keyway in place True #4 rebar 36" on center to top of wall