Loading...
IM Inspection Worksheet_13-12-2023_14-58-04INSPECTION WORKSHEET (FDTN-029361-2023) RC-0556-2023Case Number:Case Module:Permit Management 12/13/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:78 Queensbury Ave Queensbury, NY 12804 303.16-1-19 Company Name NameContact Type Applicant Jameson O'Dell Granted Permission Jameson O'Dell Primary Owner Jameson O'Dell Checklist Item CommentsPassed Building Inspector Notes False 10/18/23 partial approval for foundation. -Footings at front and rear of the building approved. 3 rows of # 4 rebar continuous. - provide an updated plan with engineer stamp showing the changes and additional rebar at the existing foundation. 11/6/23 partial approval for foundation. - Foundation walls at back extension only approved 11/22/23 partial approval for foundation. - Frost walls at front extension approved. - 2" ridged insulation poly, and wire mesh under slab verified at back extension. 12/13/23 partial approval for foundation. -welded wire mesh and 2" ridged insulation under slab at front extension verified. - Rebar at south foundation wall under main house verified, stamped plans for this have been submitted. Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True 11/6/23 partial approval for foundation. - Foundation walls at back extension only approved 12/13/23 partial approval for foundation. -welded wire mesh and 2" ridged insulation under slab at front extension verified. - Rebar at south foundation wall under main house verified, stamped plans for this have been submitted. 5 psi or 10 ft. above highest conn. for 15 minutes False Masonry Wall False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False December 13, 2023 Page 1 of 2 INSPECTION WORKSHEET (FDTN-029361-2023) Checklist Item CommentsPassed Monolithic Slab True 10/18/23 partial approval for foundation. -Footings at front and rear of the building approved. 3 rows of # 4 rebar continuous. - provide an updated plan with engineer stamp showing the changes and additional rebar at the existing foundation. Footings True 10/18/23 partial approval for foundation. -Footings at front and rear of the building approved. 3 rows of # 4 rebar continuous. - provide an updated plan with engineer stamp showing the changes and additional rebar at the existing foundation. Footing Drain stone - 6 mil poly False Piers False Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place False Reinforcement in Place True 11/6/23 partial approval for foundation. - Foundation walls at back extension only approved 3 rows of #4 rebar continuous Permit Card Visible From Road False Poly Under Slab True 12/13/23 partial approval for foundation. -welded wire mesh and 2" ridged insulation under slab at front extension verified. - Rebar at south foundation wall under main house verified, stamped plans for this have been submitted. Footing Dowels or Keyway in place True #4 rebar 36" on center to top of wall December 13, 2023 Page 2 of 2