RC-000718-2017 ' TO" OF QUEENSBURY
742 Bay Road,Queensbury,NY '12804-5904 (518)761-8201
.. Community Development-Building& Codes (518)761-8256
CERTIFICATE OF OCCUPANCY
Permit Number: RC-000718-2017 Date Issued: Thursday, March 29, 2018
This is to certify that work requested to be done as shown by Permit Number RC-000718-2017
has been completed.
Tax Map Number: 295.15-2-7
Location: 74 JOHN CLENDON RD
Owner: FOOTHILLS BUILDERS,LLC
Applicant: FOOTHILLS BUILDERS,LLC
This structure may be occupied as a: SFD w/in-law apt.2278 s.f.
Cross Ref, Area Variance approval with 25 year condition placed up issuance By Order of Town Board
of Certificate of Occupancy;In-Law Apartment expires year 2042 TOWN OF QUEENSBURY
Z-AV-68-2017
Issuance of this Certificate of Occupancy DOES NOT relieve the , a
property owner of the responsibility for compliance with Site Plan,
Variance, or other issues and conditions as a result of approvals by the
Director of Building&Code 1;nfbrcement
Planning Board or Zoning Board of Appeals.
TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development- Building& Codes (518) 761-8256
BUILDING PERMIT
Permit Number: RC-000718-2017
:2 .,I
Tax Map No: 295.15-4-6"
Permission is hereby granted to: FOOTHILLS BUILDERS,LL,C
For property located at: 74 JOI1N C.,ENDON RD
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information'hereto filed and approved and in compliance with the NYS I..iniform
Building Codes and the Queensbury Coning Ordinance
Tyne of Construction
Owner Name: FOOT"HILL,S BUILDERS,I.0 Single Family-New $250,000.00
Owner Address: 9 Mountainside DR Total Value $250,000.00
Queensbury,NY 12804
Contractor or Builder's Name l Address Electrical Inspection Agency
FOOTIILL L,S BUILDERS,LLC
9 Mountainside DR
Queensbury,NY 12804
Plans&Specifications
SIT)wlin-law apt.2278 s.f.
Cross Ref.Area Variance approval with 25 year condition placed up issuance of Certificate of Occupancy;In-L,aw
Apartment expires year 2042
G-AV-68-2017
$455.60 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,November 22,2018
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Town of ccns/��p �edn., y, ovember 22,2017'
SIGNED BY: for the Town of Queensbury.
Q'
Director of Building&Code Enforcement
PRINCIPAL STRUCTURE APPLICATION Office Use Only
Date: I "
_.___..
'Tax Map 11) _._ �� ... �_ � �.m.. , Permit Fee
Tone ".._ ,. _. _ Historic? Yes mm No Ree Fee
ubdivis.ion Name ;" C, k1 � � (A b Llot C Site,Plarr#
u vt dl to,#t f It .� o
Project Location V"I
TOWN R ,w RESOLUTION iq recreation fee for ir«*deV6w 11 ] lCici 1riI,� @axes/ sr�r Email , multiple family,
apartments,condominiums,townhouses,and/or manufact r� prod ar harnes,� d
p no l haves. This is in addition to the
permit fee(s).
Primary Owner(s) Foothills Builders
Address 9 Mountainside Drive., Queenshury,NY 12804
phone/Email (518) 796-3520/(518) 791-1933 / FoothillsBuildersNY@giiiail.coi-n
Applicant � Foothills Builders
ltddress 9 Mountainside Drive, QueensbUry, NY 12804 �
Phone/l�;txtall (518) 796-3520/(51.8) 791-1933 / FoothillsBuil.dersNY as niail.coni
Contractor Foothills Builders �.
. dress 9 Mountainside Drive„ Queensbury„NY 12804
P one/l rnail (518) 796.-3520/(518) 791-1933 / Footh.illsB ildersNY maia.il.com
Contact Person for Building& Codes Compliance ((��mm ,L� � __.___..__.___.«__._ ._.Phone siw � 3_`2
�. Check all that apply New Addition Alteration I
floor sf 2°"d floor sf Total sf Height
SingleFamily
Multi-Family
(#f of units
Townhouse
nhouse
Business Office
Retail_Mercantile
Factory-Industrial.
Attached Garage
(1, 2, :3, 4+)
Cater
Town of Queensbury Building&Codes Principal Structure Application revised January 2016
If commercial or industrial please indicate name of business
Proposed rise of building or addition P, �r, f.1 �� �.
Source of 1"lle�rt c��z°cue°c�rz�� �-
_ ( ) t gas. Oil propane Solar Other
1"ireplace: C oap1e-te a se r_ar__„t_e-_i�_i_p_l_.1i c—at ic._n t_er_—F_u _1__3_..u_rn—z
___.... „ : x topptrance» -hi ys
Are there structures not shown on plot plan?
:re there casement: on tlae property? , i,,
Site Information:
a4 Dimensions or acreage of lot
b. Is this a corner lct? es o
g
ca r the grade be changed as a result of construction =Yess
X No
d, Public water or Private well circle one, ublrc PrivAt
e. Sewer or Private Septic System (circle care) Sewer rr-_..
Value of all work to be performed labor or materials) L, Ll
I, I acknowledge no construction shall be corm-rrenced prior to issuance of a valid permit and will be
completed within a 1.2 month period.
. If work is not complete by the 1 year expiration date the pen-nit may be renewed, subject to foes and
department.approval.
. I certify that the application, plans and supporting materials are a trace and complete statement /
description of the work proposed, that all work will be performed in accordance with the NYS
Building CodesJocal building;laws and ordinances,and in conformance with local zonings regulations
. 1 acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate
of occupancy.
. I also understand. that I /we are required to provide an as-built survey by a licensed land surveyor of
all newly constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree to the above:
PRINT NAME: DATE:
S1 �� 1�:
� _... .... ATE:_
For offfccR use only
Operating Permit Issued: _ ""des o
Occupancy Type
Construction Classification
Assembly Occupancy Limit
Special Conditions
,t"own of Queerrsbrary Building&Codes Principal Structure application Revised January 2016
SEPTIC DISPOSAL APPLICATION 90
i
Received
DATE: Tax Map ID
TAX MALE ID:
Permit 110.
Permit Fee
(518)796-3650/
APPLICANT W.. Foothills Builders �� fE-MAIL ( 1 )791-1933
„_._.... _ _.
ADDRESS
9 Mountainside.Drive Queensbury, NY 12804 .._..._.M_.._Foothill sBuildersl Y@guiai1,com
BIJILDER Foothills builders Same as above
OWNERFoothills builders
ADDRESS ,. ..9 Mountainside Drive Quee:rasmbury,.mY..128C14.__..._� .._.w.....__..u_�....a.__......_,.......w.W....,.�„_.•__.w__.�.._,.__,..,_...._.....__.,._..__......._....___..._.
CONTAC;°T PL; SON F'OR BUILDINGCODE,COMPLIANCE:
Leuci
PHONE/E-MAIL �(518)796/3520/ 51£1 i91-1933 /Footliil]sBuildersNY@gmail.com
_�.,.,,i_.�.....
RESIDENCE Ilv '1 .�_....___..,._�_. .__......._.m_.....___.._..._._.__._.._._.._..,,._w__.w_,, ._�_..,....�._._._______rv._..._.._..Ww_..rv�.____w_._..__...�. _..__.._�_.____.....
ON
� . ..�. , ........m..._.....
Year Llailt of bedrooms, 9cas ta yc� _._.._..,.__..._...._...,.__...._.._...... . ......w:_
ga
1980 or older Caarba e grinder installed _.._�"�
_..._...__._._.�_____._..w_.-., ...._n.__ ....._._.._._..._ _ .._.. _._._aw_.a.._ __._ µ_...,.__._.W... ....�
No
__. .___.__. ..__ ,...__ ......__.._.w._._.. ..,g..µu..___..,_._ __...._ b
or Iot"rut)a Yes 1 to
19 1-1991 ---._.._.._.__.._..,.. Spa o.r if ut)installed ._.__mm.. ._.. , _......
nsf.
1992laresent
PARCEL INFORMATION
Topography " " Flat rolling Steep slope %Slope
Soil Natarre Sand Loam Clay doer
_ . ...____. ..._,._.._ ........_ .............
Groundwater At what
..._ depth:
At Atuoat depth:/Ina erviour ,._........____....,......._..
__.._.... _,... _.._.___... __
-----
Domesticwell,
Water Supply Municipal Well(if w ell,water supply from any septic system absorption is._ft.)
perccaleatlearr'1`est__...___..._IT..._. air per eraraclW__. ..____.._.___.__, _._..__._w_.._ _..._ .__ _.m......_ _._.,. ._
. . -_.._.w._n...__ p per a(test to e completed by licensed engineerwdarcltitect)
PROPOSED SYSTEM FOR�NEW CONSTRUCTION
TankTm_._.mn.._.,�__...,_ .alloras(miss.sire_�._C9(l._mm.mm�,,....._._,___.._..._.w,__a._,. ___...__._._.....w_..v..._._._.._.._ ..�.__..__�._....___....�w__�.___,.,_,mm.�.... .._•_....._.
ink size _...._41 0 gallons„add 2 0 gallons to size far each aarbage cylinder or spa or loot tub
sierra Absorption field with L#2 ston. ...M__._ ..__._ _mw_.__...___.._..w....__..___.
a. Absc Total length..... ....___._. It.,Each Trench...........
Seepage:,Pit with kl.3 stone flow rnany: Size—...
_ . ....._..._ ,__......_.. _ .,_..... __..w..
Altemative System Lied or other type _.__.m ......
Holding I`ank S stern Total required capacity? .. µ_ � Tank size _._ _ .n.� .o f.�
y cttanks ,.
Notes; 1)Alarm systerri r associated electrical work must e inspected by a Town approved electrical inspection agency;2) We willno longer allow systems to be:covered until such time as an As-built plan is received&approved. The installed system must snatch the
septic,system layout on File _-no exceptions.
Declaration: Any permit or approval granted which is based upon or,is granted in reliance upon any material representation or failure
to snake;a material fact or c;ircumstaancer,known by or on behalf of an applicant,shall be void, 1 have react the regulations and agree to
abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance,
PRINTNAM
1�1'ATd lt� � �
5 � � _..__�. �°�_�._ DATE:
Town of Queensbury Building&Codes Principal Structures Application Revised January 2016
Town of Queensbury 'I"hornas R. Van Ness
Highway Department Highway Superintendent
742 Bay Road, Queensbury, NY 12804 Horne: 518-745-0929
Phone: 518-761-8211
Fax: 518-745-4466 David Duell
Deputy Highway Superintendent
Home: 518-745-0938
DRIVEWAY PEIM11'
Date:
Applicant Name: Foothills Builders
-------------
S 2
Telephone No.:
Address to be Inspected
Return Addressa 9 Mountainside Drive Queensbury, NY 1,2804
Applicant must show exact location and width of driveway(s) to be connected to the highway by placing stakes
at the specified location
The Superintendent of Highways of the'rown of Queensbury has reviewed this application. The following action
has been taken:
STEP 1: Preliminary approval
NEED Slight Swale
Deep Swale
Level with the road
Level with the top of the paved wing
Size culvert pipe to be used (if necessary)
( ) 12" ( ) 15" ( ) 18" ( ) 24" 36"
Prefirninary inspection completed by: Date:
Approval by Highway Supt.: or Deputy Supt.:
Upon completion please resubmit this approval permit for a final approval.
STEP 2: Final Approval Rejected
Date:
-ri"n-t-e"n--d-ien-t' -a-vidD-u,-e -5-e-p,u"t y- -1-1"i"g-J"i'w--a'"y-'S-u p-e,r-i-n-t-e-i i"d--e'n-t'
Town of Queensbury Building&Codes Principal Strticture Application Revised Jarmary 2016
1280
Manual S Compliance Re ort Job:
p Nov
®ate: Nov os,2017
Entire ouse By: SLL
Plan: 1280
FOOTHILL BUILDERS
CUEENSBURY, NY12804
....11-111,1113
Far: JOE LEUCI, FOOTHILL BUILDERS � r
QUEENSBURY, NY 12804 � °�
Design Conditions
Outdoor design DB: 85.0°F Sensible gain: 28393 Btuh Entering coil DB: 75.3°F
Outdoor design WB: 71.0°F Latent gain: 6476 Btuh Entering coil WB: 62.6°F
Indoor design DB: 75.0°F Total gain: 34869 Btuh
Indoor RH: 50% Estimated airflow: 1359 cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split AG
Manufacturer: York Model TCGD42S41S4+CX420B(6,9)35+T"(8,L)V*C16
Actual airflow: 1260 cfm
Sensible capacity: 0 Btuh 0% of load
Latent capacity: 0 Btuh 0% of load
Total capacity: 0 Btuh 0% of load SHR: 0%
Design Conditions
Outdoor design DB: -4.0°F Heat loss: 111269 Btuh Entering coil DB: 65.4°F
Indoor design DB: 68.0°F
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Gas furnace
Manufacturer: York Model: TM9X120D20MP11
Actual airflow: 1260 cfm
Output capacity. 114000 Btuh 102% of load Temp. rise: 50 °F
.1 -1-6 RC-000718-2017
Foothill FoothillS Builders
74 John CI ndon Rd., Lot 9
Meets are all requirements ofACCA Manual S. SFD W/in-lawapt. 2278 s.f.
2017-Nov-08 10:59:48
rlghtsoft' Right-Suiteg Universal 2017 17.0.16 RSU25116 Page 1
Xw ...ott.langeworthy\Documents\York\BERUBE LOT 9.rup Calc=MJ7 House faces: N
—
Res idential PlansExaminer Review Form Form
for HVAC RPER1
ACC,K° 15 MarV9
QUEENSBURY NY
Meader Information
Contractor: FOOTHILL BUILDERS REQUIRED ATTACHMENTS ATTACHED
�nc�aniva| |ioanae. Manual J1 Form(and suPPorUng workaoeeta): Yea [] wn []
orMJ1AE Form*(and supporting wnrxshaets): Yes [] No []
— — OEM performance data(»eaU»Q.cooling,b|owe,): Yes No oBuxdingp|an#: 1280 �anua/ opncoonn�emm,hso��: Yes [] No
[]
[]
Home address(Street orLot#.Block.Subdivision): . Entire House Duct distribution sketch: Yes [] No []
iditions Building Construction Information
Winter Design Conditions Building
Outdoor temperature: '4 OF Orientation: House faces North
Indoor temperature: 68 OF North,East,West,South,Northeast,Northwest,Southeast,Southwest
Total heat loss: 111269 Btuh Number nfbedrooms: 4
Conditioned floor area: 5881 ft2
Summer Design Conditions Number of occupants: O
Outdoor temperature: 85 OF
Indoor temperature: 75 OF Windows
Grains difference: 27 y�|b @50% RH sa"e overhang uo�x: O M Roof
Sensible heat gain: 31548 Btuo Internal shade: none
Latent heatgain: 7196 s%uh mmu"'u=p"'°�� =�°Depth Window
Total heat gain: 38744 suuh Number ofskylights: O �
7eafinq Equipment Da— Coolinq Equipment Data Blower Data
E�uumace,Heat ipm p.n,/*^°',� Gas furnace ����°,,p"�p.°� Spn'� Heating 1260
��� ----- � cpoxngdm: 1260
Model: York Mode: York Static in H20
TM9X120o20MP11 TCGo42G41G4 Fan's rated external static pressure for
Heating output winter^," Bmh TTotal cooxngoopaoin, O amx ^°°m"omw°
Heat� ' c—acity-- — ~�'---,---n— Sensible cooling capacity: O Btuh
Aux. heating output capacity: 0 Btuh Latent cooling capacity: O emx
HIVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1)
Design airflow: 1260 cfn Longest supply duct: 8 ft Duct Materials Used
Equipment design ESP: D in H2O Longest return duct: O ft Trunk duct:
Total device pressure losses: 8 in H2O Total effective mnem(TsL): O ft
Available static pressure(xSP): O inH3O Friction rate: D in/100ft Branch duct: Sheet metal
Fric
tion
I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building
plan listed above. I understand the claims made on these forms will be subjectto review and verification.
Contractor's printed name:
Contractor's signature: Date:
Reserved for County,Town Municipality orAuthority having jurisdiction use.
Mome qualifies for MJ1AE Form based on Abridged Edition Checklist
+ wrightScmW mnm'ounmm Universal zu1r1ro.1onouzs11a
Project Summary Job: 1280
6, Date: Nov 08,2017
Entire House By: SILL
FOOTHILL BUILDERS Plan: 1280
QUEENSBURY, NY 12804
For: JOE LEUCI, FOOTHILL BUILDERS
QUEENSBURY NY 12804
Notes:
Weather: Glens Falls AP, NY US
Winter Design Conditions Summer Design Conditions
Outside db -4 OF Outside db 85 ®F
Inside db 68 OF Inside db 75 OF
Design TD 72 OF Design TD 10 OF
Daily range M
Re ative humidity 50 %
Moisture difference 27 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 104676 Btuh Structure 27069 Btuh
Ducts 6593 Btuh Ducts 1324 Btuh
Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh
(pone) (none)
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 111269 Btuh Use manufacturer's data n
Rate/swing multiplier 0.90
Infiltration Equipment sensible load 25554 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 0 Structure 6476 Btuh
D ucts 0 Btuh
Central vent (0 cfm) 0 Btuh
Heatin Coolin (pone)
1 5 8N
Area (ft2 588 Equipment latent load 6476 Btuh
Volume ft.) 52929 52929
Air chan es/hour 0.70 0.40 Equipment total load 32030 Btuh
Equiv.2F (cfm) 618 353 Req. total capacity at 0.70 SHR 3.0 ton
Heating Equipment Summary Cooling Equipment Summary
Make York Make York
Trade YORK Trade ADP
Model TM9X120D20MP11 Cond TCGD42S41S4
AHRI ref 2008696 Coil CX420B(6,9)35+T-(8,L)V-C16
AHRI ref 6492466
Efficiency 95.5 AFU E Efficiency 11.0 EER, 14 SEER
Heating input 120000 Btuh Sensible cooling 26460 Btuh
Heating output 114000 Btuh Latent cooling 11340 Btuh
Temperature rise 82 'F Total cooling 37800 Btuh
Actual air flow 1260 cfm Actual air flow 1260 cfm
Air flow factor 0.011 cfm/Btuh Air flow factor 0.044 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.81
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
2017-Nov-08 M59:48
wrilghftOft' Right-Suite@ Universal 2017 17,016 RSU25116 Page 1
...ott.Vangeworthy\Documents\York\BERUBE LOT 9,rup Calc=VIJ7 House faces N
Right-JCS Worksheet Job: 1280
Entire House Date: Nov 08,2017
y: L
FOOTHILL BUILDERS Plan:
SIL
1280
QUEENSBURY, NY 12804
-- MANUAL Ji 7th Ed,
1 Name of room Entire House Rooml Room2 Room3
2 Length of exposed wall 732,0 ft 164.0 ft 164,0 ft 45.0 ft
3 Room dimensions 1.0 x 1411 ft 1.0 x 1411 ft 1,0 x 376.0 ft
4 Ceilings Condit. Option 9.0 ft d 9.0 ft heat/cool 9,0 ft heat/cool 9.0 ft heat1cool
TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
— EXPOSURE NO, Htg I Cig - (W) Htg C1g (ft') Htg I CIg (w) Htg CIg (ft2) Htg Clg
5 Gross a 12E3 5A 1,0 6588 1476 .... ... 1476 405
Exposed b 0 0 !!!!! **** -- !!!!!!! !!!I I I
walls and c 0 0 HIM
partitions d 0 0 1
e 0 0
f 0 0 11111 HIM
6 Windows and a 3D0 26.0 420 10917 80 2079 0 0 70 1819
glass doors b 0 0 0 0 0 0 0 0 0
Heating c 0 0 0 0 0 0 0 0 0
d 0 0 0 0 0 0 0 0 0
e 0 0 0 0 0 0 0 0 0
f 0 01 0 0 01 0 0 0 0
7 Windows and North 17,0 170 2890 20 340 0 0 70 1190
glass doors NE/NW 0 0 0 0 0 0 0 0 0
Cooling E/W 62,0 90 5580 60 3720 0 0 0 0
SE/SW 0 0 0 0 0 0 0 0 0
South MO 160 4800 0 0 0 0 0 0
— Harz 1 0 0 01 0 0 01 0 0 0
8 Other doors a 10DO 331 6.3 84 2782 526 0 0 0 0 0 0 21 696 131
b 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c 0 0 0 0 0 0 01 0 0 0 0 0 0 0
9 Net a 12E 3 5.4 1,0 6084 32854 6206 1396 7538 1424 1476 7970 1506 314 1696 320
exposed b 0 0 0 0 1!!!! 0 0 i!! 0 0 0 0
walls and c 0 0 0 0 0 0 11 0 0 0 0
partitions d 0 0 0 0 0 0 0 0 0 0
e 0 0 Iffill 0 0 0 0 0 0 0 0
f 01 0 !1!111 0 0 i i 0 0 0 01 0 0
10 Ceilings a 16G 0 2A 11 2840 6748 3186 0 0 0 581 1380 652 6 14 7
to 0 0 0 0 M11 0 0 0 0 0 0
c 0 0 0 0 !!!!!! 0 0 0 0 0 0
d 0 0 0 0 Illlll 0 0 0 0 0 0
e 0 0 0 0 !!!!!! 0 0 0 0 0 0
f 0 0 0 0 111m 01 0 0 0 0 0
11 Floors a 1910 1.7 0 1411 2438 0 1411 2438 0 0 0 0 0 0 0
(Note: room b 1910 1,7 0 18 31 0 0 0 0 0 0 0 0 0 0
perimeter C 0 0 !!!!!! 0 0 1 0 0 0 0 0 0
is displ. d 0 0 HIM 0 0 !!!In0 0 0 0 0 0
for slab e 0 0 0 0 1!1!!! 0 0 HIM 0 0 0 0
floors) f 0� 0 0 0 11 M 0 0 MM 0 0 0 0
12 Infiltration a 970 7 7 504 48906 3881 80 7763 616 0 0 0 91 8830 701
.Ventilation 0 0 0 0 0 0. 01 0
13 Subtotal loss=6+8:.+11+12 104676 19819 9351 13055
Less external heating 0 0 0 0
Less transfer () .*** 0 0 0
Heating redistribution 0 **** 0 0 0
14 Duct loss 6% 6593 6% 1248 6% 589 6% 822
15 Total loss= 13+14 111269 21067 9940 13877
16 Int. gains: People 300 0 0 0 0 0 0 0 0
Appl. @ 1200 0 0 0 0 0 0 0 0
17 Subtot RSH gain=7+8-+12+16 27069 6100 2157 2349
Less external cooling 0 0 0 0
Less transfer 0 0 0 0
Coding redistribution 0 0 0 0
18 Duct gain 5% 1324 5% 298 5% 106 5% 115
19 Total RSH gain=(1 7+18)*P LF 1.00 28393 1,00 6398 1.00 2263 1.00 2464
20 Air required(cfm) 126�0
—------------L 1260� 239 284 113 100 157 109
I
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
2017-Nov-08 10:59:48
vvirilightsoft Right-Suited Universal 2017 17.0.16 RSU25116 Page 1
hw ...att.langeworthy\DocLiments\York\BERUBE LOT 9.rup Calc=MJ7 House faces. N
Right-M)Worksheet Job: 1280
Entire House Date: Nov 08,2017
y: SILL
FOOTHILL BUILDERS Plan: 1280
QUEENSBURY, NY 12804
-- MANUAL J:7th Ed,
I Name of room Room4 Room5 Room6 Room?
2 Length of exposed wall 24.0 ft 27.0 ft 5.0 ft 17.0 ft
3 Room dimensions 1.0 x 297.0 ft 110 x 14.0 ft 5.0 x 11.0 ft 6.0 x 11.0 ft
4 Ceilings Condit.Option 9.0 ft heat/cool R 0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
- EXPOSURE NO. Htg Cig (ft2) Htg Cig (ft2) Htg Cig (ft2) Htg CIg (ft2) Htg Clg
5 Gross a 12E3 5.4 1.0 216 243 45 .... 153
Exposed b 0 0 HIM
walls and c 0 0 ......
partitions d 0 0
e 0 0
f 0 0 mil HIM
6 Windows and a 3D0 26.0 30 780 40 1040 10 260 0 0
glass doors b 0 0 0 0 0 0 0 D 0
Heating c 0 0 0 0 0 0 0 0 0
d 0 0 0 0 0 0 0 0 0
e 0 0 0 0 0 0 0 0 0
f 0 0 0 0 01 0 0 0 0
7 Windows and North 17.0 15 255 15 255 0 0 0 0
glass doors NE/NW 0 0 0 0 0 0 0 0
0
Cooling E/W
62.0 0 0 25 1550 0 0 0 0
SE/SW 0 0 0 0 0 0 0 0 0
South 30.0 15 450 0 0 10 300 0 0
Horz 0 0 0 0 0 0 0 0
8 Other doors a 10DO 33.1 6.3 42 1391 263 0 0 0 0 0 0 0 0 0
b 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c 0 0 0 0 0 0 0 1 0 01 0 01 0 01 0
9 Net a 12E 3 5.4 1.0 144 778 147 203 1096 207 35 189 36 153 826 156
exposed b 0 0 0 0 0 0 0 0 0 0
walls and C 0 0 0 0 0 0 0 0 0 0
partitions d 0 0 0 0 !!!M' 0 0 0 0 IIIIII 0 0
e 0 0 0 0 0 0 !Imf 0 0 0 0
f 0 0 0 0 0 0 0 0 pfm 0 0
10 Ceilings a 16G 0 2.4 1.1 272 646 305 182 432 204 55 131 62 66 157 74
b 0 0 0 0 0 0 !!!111 0 0 0 0
c 0 0 0 0 0 0 !11111 0 0 0 0
d 0 0 0 0 0 0 0 0 0 0
e 0 0 0 0 0 0 0 0 0 0
f 0 0 0 0 01 0 0 01 01 0
11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0
(Note: room b 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0
perimeter c 0 0 0 0 0 0 0 0 0 0
is displ. d 0 0 0 0 0 0 0 0 0 0
for slab e 0 0 0 0 0 0 IIIIII 0 0 IIIIII 0 0
floors) f 0 0 0 0 0 0 IIIIII 0 0 IIIIII 0 0
12 Infiltration a 97,0 7.7 72 6987 5541 40 3881 308 10 970 77 0 0 0
- Ventilation I............ I I -- 0 0 0 1 0 1 0 01 01 0
13 Subtotal loss=6+8..+11+12 10581 6450 1550 983
Less external heating 0 0 0 0
Less transfer 0 0 0 0
Heating redistribution 0 0 0 0
14 Duct loss 6% 666 6% 406 6% 98 6% 62
15 Total loss= 13+14 11248 - 6856 - 1648 1045
16 Int. gains: People @ 300 0 0 0 0 0 0 0 0
Appl. @ 1200 0 0 0 0 0 0 0 0
17 Subtot RSH gain=7+8-+12+16 1974 2524 - 474 230
Less external cooling 0 0 0
Less transfer 0 0 0 0
0
Cooling redistribution 0 0 0 0
18 Duct gain 5% 97 5% 123 5% 23 5% 11
19 Total RSH gain=(1 7+18)*P LF 1.00 2071 1.00 2648 1.00 498 1.00 241
20 1 Air required(cfm) 1 127 92 78 118 19 22 12 11
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
0:ag 2 e
2017-Nov-08 159:48
wrightsoft" Right-Suited Universal 2017 17.0.16 RSU25116 P
...ott.langeworthy\Documents\York\BERUBE LOT 9.rup Calc=MJ7 House faces: N
Right-J@ Worksheet Job: 1280
Entire House Date: Nov 08,2017
: SILL
FOOTHILL BUILDERS Plan: 1280
QUEENSBURY, NY 12804
-- MANUAL J: 7th Ed.
1 Name of room Room8 Roon-9 Room10 Roon-11
2 Length of exposed wall 3.0 ft 24.0 ft 19.0 ft 0 ft
3 Room dimensions 13.0 x 3.0 ft 12.0 x 12.0 ft 17.0 x 12.0 ft 6.0 x 3.0 ft
4 Ceilings -Condit, Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
- EXPOSURE - NO, Htg CIg (ft2) Htg CIg (w) Htg CIg (ft2) Htg Cig (ft2) Htg CIg
5 Gross a 12E 3 5.4 1.0 27 216 171 0
Exposed b 0 0 HIM HIM
walls and c 0 0 HIM
partitions d 0 0 HIM
a 0 0
HIM
f 0 0 MM
IM!
6 Windows and a 3D0 26.0 5 130 30 780 30 780
0 0 0 0 0 0
0 0
glass doors b
Heating c 0 0 0 0 0 0 0 0 0 0 0
d 0 0 0 0 0 0 0 0 0
e 0 0 0 0 0 0 0 0 0
f- 0 0 0 0 0 0 0 0 0
7 Windows and North 17.0 0 0 0 0 0 0 0 0
glass doors NE/NW 0 0 0 0 0 0 0 0 0
Cooling E/W 62.0 5 310 0 0 0 0 0 0
SE/SW 0 0 0 0 0 0 0 0 0
South 30.0 0 0 30 900 30 900 0 0
Harz 0 0 0 0 0 0 0 0 0
8 Other doors a 10DO 33A 6.3 0 0 01 0 0 0 21 696 131� 0 0 0
b 0 0 0 0 0 0 0 0 0 0 0 0 0
c 0 0 0 0 0 0 0 0 0 0 0 0
9 Net a 12E3 5.4 1.0 22 119 22 186 1004 190 120 648 122 0 0 0
exposed b 0 0 0 0 0 0 0 0 0 0
walls and c 0 0 0 0 0 0 0 0 0 0
partitions Fd 0 0 0 0 0 0 0 0 IIIIII 0 0
a 0 0 0 0 0 0 0 0 0 0
f 0 0 0 0 0 0 IIIIII 0 0 0 0
10 Ceilings a 16G0 2.4 1A 0 0 0 0 0 0 0 0 0 0 0 0
b 0 0 0 0 1!!!!! 0 0 0 0 IIIIII 0 0
c 0 0 0 0 0 0 0 0 0 0
d 0 0 0 0 0 0 0 0 0 0
e 0 0 0 0 0 0 0 0 0 0
- f 0. 0 0 0 0 0, 0 0 0 01
11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0
(Note: room b 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0
perimeter C 0 0 0 0 !!!!!! 0 0 0 0 0 0
is displ. d 0 0 0 0 i!!! 0 0 0 0 0 0
for slab a 0 0 0 0 !!!!!! 0 0 IIIIII 0 0 IIIIII 0 0
floors) f 0 0 0 0 llte 0 0 0 0 !!!!.11 01 0
I
12 Infiltration a 97.0 7.7 5 485 39 30 2911 231 51 4949 393 0 0 0
Ventilation 1 0 0 0 1 0 0 0 0 0
13 Subtotal loss=6+8,.+11+12 734 4695 7072 ... .. 0
Less external heating 0 0 0 0
Less transfer 0 0 0 0
Heating redistribution 0 0 0 0
14 Duct loss 6% 46 6% 296 6% 445 6% 0
15 Total loss= 13+14 - 780 4991 1 7518 01
16 Int.gains: People 300 0 0 0 0 0 0 0 0
Appl, @ 1200 0 0 0 0 0 0 0 0
17 Subtot RSH gain=7+8..+12+16 371 1321 1547 0
Less external cooling 0 0 0 0
Less transfer 0 0 0 0
Cooling redistribution 0 0 0 0
18 Duct gain 5% 18 5% 65 5% 76 5% 0
19 Total RSH gain=(1 7+18)*P LF 1.00 389 1.00 1385 1.00 1622 1,00 0
20 Air required(cfm) n 11
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
4 2017-Nov-08 10:59:48 j+ vvrightsoft', Right-Suitet Universal 2017 1T0,16 RSU25116 Page 3
4.11 ...ott.langeworthy\Documents\York\BER UBE LOT 9.rup Calc=MJ7 House faces: N
Right-M) Worksheet Job: 1280
Entire House Date: Nov 08,2017
y: SILL
FOOTHILL BUILDERS Plan: 1280
QUEENSBURY, NY 12804
-- MANUAL J 7th Ed.
I Name of room Room 13 Room14 Room16 Room17
2 Length of exposed wall 120.0 ft 27.0 ft 25,0 ft 7.0 ft
3 Room dimensions 1.0 x 839.0 ft 1.0 x 186,0 ft 1.0 x 112.0 ft 7.0 x TO ft
4 Ceilings Condit.Option 9,0 ft heat/cocq 9,0 ft heat/cool 9,0 ft heat/cool 9,0 ftj heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
— EXPOSURE NO. Htg Clg (ft') Htg I Clg (w) Htg Clg (ft2) Htg Clg (w) Htg I Clg
5 Gross a 12E3 5.4 1.0 1080 243
Exposed b 0 0 !!!111 225 63
walls and c 0 0 !!!ffj HIM HIM HIM
partitions d 0 0 ......
a 0 0 HIIII
f 0 0 HIM
6 Windows and a 3D0 26.0 0 0 30 780 20 520 0 0
glass doors b 0 0 0 0 0 0 0 0 0
Heating C 0 0 0 0 0 0 0 0 0
d 0 0 0 0 0 0 0 0 0
e 0 0 0 0 0 0 0 0 0
f 0 0 0 0 0 0 0 0 0,
7 Windows and North ITO 0 0 30 510 20 340 0 0
glass doors NE/NW 0 0 0 0 0 0 0 0 0
Cooling E/W 62.0 0 0 0 0 0 0 0 0
SE/SW 0 0 0 0 0 0 0 0 0
South 30.0 0 0 0 0 0 0 0 0
Harz 0 0 <» 0 0 1 0 01 01 0 0
8 Other doors a�10D1 331 6.3 0 0� 0 ol 0 0 0 0 0 0 0 0
0 0 0 0 0 0
C 0 0 0 0 0 0 0 0 0 0 0 0 01 0
b 0 0 0 0 0 0 0 0
9 Net a 12E3 5.4 1.0 1080 5832 1102 213 1150 217 205 1107 209 63 340 64
exposed b 0 0 0 0 HIM 0 0 MM 0 0 0 0
walls and c 0 0 0 0 0 0 HIM 0 0 !M 0 0
partitions d 0 0 m!ll 0 0 0 0 !!!! 1 0 0 M 0 0
a 0 0 !!!!!! 0 0 0 0 11 0 0 0 0
- f 0 0 !11!11 0 0 01 0 0 01 0 0
10 Ceilings a 16GO 2.4 1A 839 1993 941 186 442 209 112 266 126 49 116 55
b 0 0 !1111 0 0 n 0 0 0 0 0 0
C 0 0 !!!Ill 0 0 0 0 0 0 0 0
d 0 0 1!1111 0 0 0 0 0 0 0 0
e 0 0 0 0 0 0 HIM 0 0 0 0
f. 01 0 0 0 0 0 !!!!!! 01 0 01 0
11 Floors a 1910 1,7 0 0 0 0 0 0 0 0 0 0 0 0 0
(Note: room b 1910 1.7 0 9 16 0 0 0 0 0 0 0 0 0 0
perimeter C 0 0 !!Im 0 0 0 0 0 0 0 0
is displ, d 0 0 0 0 0 0 0 0 IIIIII 0 0
for slab e 0 0 0 0 0 0 0 0 IIIIII 0 0
floors) f 0 0 0 0 0, 0 0 0, 11!!!! 0 0
12 Infiltration a 97.0 7.7 0 0 01 30 2911 231 20 1941 154 0 0 0
,Ventilation --0 0 0 0 0 0 01 0
13 Subtotal loss=6+8.+11+12 7841 — — 5283 .... 3834 457
Less external heating 0 — — 0 0 0 ...
Less transfer 0 — 0 0 0
Heating redistribution 0 ... 0 — 0 0
14 Duct loss 6% 494 6% 333 6% 241 6% 29
15 Total loss= 13+14 1 8335 -- 5616, -- 4075 — 485
16 Int. gains: People @ 300 0 -- 0 0 -- 0 0 — 0 0 0
Appl. @ 1200 0 0 0 0 0 0 0 0
17 Subtot RSH gain=7+8..+12+16 2043 1167 829 119
Less extemal cooling 0 0 0 0
Less transfer 0 0 0 0
Cooling redistribution — 0 0 0 0
18 Duct gain 5% 100 5% .. 57 5% 41 5% 6
19 Total RSH gain=(1 7+18)*P LF 1.00 21431 1.00 1224 1.00 8691 1.00 125
20 Air required(cfm) --------L— 94 64 54 1 1 1 46 1 51 6 1
Calculations apEroved by AC 'A to meet all requirements of Manual J 7th Ed.
4IJ4- wrightsoft", 2017-Nov-08 10:%48
Right-Suite(D Universal 2017 17,0.16 RSU25116 Page 4
...ott.langeworthy\Documents\York\BERUBE LOT 9.rLIP Calc=MJ7 House faces: IN
Right-J@ Worksheet Job: 1280
Entire House Date: Nov 08,2017
L
FOOTHILL BUILDERS Plan:
B(,n: 12 SL80
QUEENSBURY, NY 12804
-- MANUAL J:7th Ed.
1 Name of room Room18 Room 19 Room20 Room21
2 Length of exposed wall 0 ft 25.0 ft 9.0 ft 4.0 ft
3 Room dimensions 7.0 x 9.0 ft 1.0 x 146.0 ft 1.0 x 95,0 ft 14.0 x 4.0 ft
4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft j heat/cool 9.0 ft heat/cool
TYPE OF CST HTMArea Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)EXPOSURE NO. Htg
Clg (f t2) Htg Cig (ft') Htg I Clig (w) Htg Cjg (ft') Htg I C1g
5 Grass a 12E3 5.4 1,0 0 225 81 --- 36
Exposed b 0 0 MlH HIM HIM
walls and C 0 0 HIM
partitions d 0 0
e 0 0
f 0 0 HIM HIM
6 Windows and a 3D0 26.0 0 0 30 780 15 390 0 0
glass doors b 0 0 0 0 0 0 0 0 0
Heating c 0 0 0 0 0 0 0 0 0
d 0 0 0 «< 0 0 0 0 0 0
e 0 0 0 0 0 0 0 0 0
f 0 0 0 0 0, 0 0 1 0 Oil
7 Windows and North 17.0 0 0 0 0 0 0 0 0
glass doors NE/NW 0 0 0 0 0 0 0 0 0
Cooling E/W 62.0 0 0 0 0 0 0 0 0
SE/SW 0 0 0 0 0 0 0 0 0
South 30.0 0 0 30 900 15 450 0 0
Horz 0 0 0 0 0 0, 0 0 0
8 Other doors a 10DO 331 6,3 0 0 0 o o o 0 0 0 0 0 0
b 0 0 0 0 0 0 0 0 0 0 0 0 0 0
— C 0 0 0 0 01 0 01 0 0 0 0 0 0 0
9 Net a 12E3 5.4 1 0 0 0 0 195 1053 199 66 356 67 36 194 37
exposed b 0 0 0 0 0 0 !!!!!I 0 0 IIIII 0 0
walls and c 0 0 0 0 0 0 !fml 0 0 0 0
partitions d 0 0 0 0 0 0 !!!!!! 0 0 0 0
e 0 0 loll!! 0 0 0 0 !!1111 0 0 0 0
f 0 0 0 0 !m! 0 of 0 0 0 0
10 Ceilings a 16GO 2,4 11 63 150 71 146 347 164 95 226 107 56 133 63
b 0 0 if!!!! 0 0 !!!!!! 0 0 0 0 0 0
C 0 0 !fIfIf 0 0 !11111 0 0 0 0 0 0
d 0 0 1 0 0 i!!i!! 0 0 !!!111 0 0 !!III" 0 0
e 0 0 0 0 1 i!i!! 0 0 0 0 11 0 0
f 1 01 0 0 0 M 01 0 0 01 !!!!!! 0 0
11 Floors a 1910 1,7 0 0 0 0 0 0 0 0 0 0 0 0 0
(Note: room b 1910 1.7 0 0 0 0 2 3 0 7 12 0 0 0 0
perimeter c 0 0 0 0 11111 0 0 0 0 0 0
is displ. d 0 0 0 0 !!!!1! 0 0 0 0 0 0
for slab a 0 0 0 0 !!M 0 0 0 0 0 0
floors) If 0 0 HIM. 0 0 !!!!!!1 0 0 0 0 0 0
12 Infiltration a 97,0 7.7 0 0 0 30 2911 231 15 1456 116 0 0 0
Ventilation 1 0 0 of 0 0 0 1 01 0
13 Subtotal loss=6+8,,+11+12 150 5094 2440 327
Less external heating 0 0 0 0
Less transfer 0 0 0 0
Heating redistribution — 0 0 0 0
14 Duct loss 6% 9 6% 321 6% 154 6% 21
15 Total loss= 13+14 -- 159 — 5415 2593 — 348
16 Int.gains: People @ 300 0 0 0 — 0 0 -- 0 0 0
Appl. @ 1200 0 0 0 — 0 0 0 0 0
17 Subtot RSH gain=7+8..+12+16 ... 71 — 1494 739 *... 100
Less external cooling 0 0 0 0
Less transfer 0 0 0 0
Cooling redistribution 0 0 0 0
18 Duct gain 5% 3 5% 73 5% 36 5% 5
19 Totat RSH gain=(17+18)*PLF 1.00 741 1.00 1567 1.00 776 1.00 104
20 Air required(cfm) 2, 31 61, 70. 1 291 341 1 41 51
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
'A wrlghtSOft" 2017-Nov-08 10:59:48
Right-Suited Universal 2017 17,0,16 RSU25116
Page 5
...ott.langeworthy\Documents\York\BERUBE LOT 9.rup Calc=MJ7 House faces: N
Right-J@ Worksheet Job: 1280
Entire House Date: Nov 08,2017
y: L
FOOTHILL BUILDERS Plan:
SL 80 lan: 12
QUEENSBURY, NY 12804
MANUAL J:7th Ed.
1 Name of room Room22
2 Length of exposed wall 23.0 ft
3 Room dimensions 12.0 x 11.0 ft
4 Ceilings Condit.Option 9.0 ft heat/cool
TYPE OF HTM Area Load(Btuh) Area Area Area
EXPOSURE — NS07T Htg CIg (ft2) Htg CIg Htg CIg I Htg Clg Htg CIg
5 Gross a 12E3 5.4 1.0 207
Exposed b 0 0
walls and c 0 0
partitions d 0 0
e 0 0
f 0 0
6 Windows and a 3D0 26.0 30 780
glass doors b 0 0 0
Heating c 0 0 0
d 0 0 0
e 0 0 0
f 0 0 0
7 Windows and North 170 0 0
glass doors NE/NW 0 0 0
Cooling E/W 62.0 0 0
SE/SW 0 0 0
South 30.0 30 900
Horz 0 0 0
8 Other doors a 10DO 33.1 6.3 0 0 0
b 0 0 0 0 0
I c- 01 0 01 0 0
9 Net a 12E 3 5.4 1.0 177 956 181
exposed b 0 0 !!!I 1 0 0
walls and c 0 0 !11111 0 0
partitions d 0 0 !!!!!! 0 0
e 0 0 Mill 0 0
f 0 0 0 0
10 Ceilings a 16G 0 24 1,1 132 314 148
b 0 0 !1!11 0 0
c 0 0 0 0
d 0 0 0 0
e 0 0 !11111 0 0
f 0 0 !!!!!! 0 0
11 Floors a 1910 1.7 0 0 0 0
(Note: room b 1910 1 7 0 0 0 0
perimeter c 0 0 f 1 0 0
is displ. d 0 0 !Iim 0 0
for slab e 0 0 !!!!!! 0 0
floors} If1 1 01 0 1 M!1 0 01
12 Infiltration a 97.0 7.7 30 2911 231
Ventilation 0 0
13 Subtotal loss=6+8.,+11+12 4960
Less external heating 0
Less transfer 0
Heating redistribution 0
14 Duct loss 6% 312
15 Total loss= 13+14 5273
16 Int. gains: People @ 300 0 0
Appl, @ 1200 0 0
17 Subtot RSH gain=7+8,.+12+16 1460
Less external cooling 0
Less transfer 0
Cooling redistribution 0
18 Duct gain 5% 71
19 Total RSH gain=(I 7+18)*P LF 1,00 1531
20,Air required(cfm) 1 1 601 681 1 1 1 1 1 1 1
Calculations approved by ACCA to meet all rtguirements of Manual J 7th Ed.
2017-Nov-08 10:59:48
wrightSoft"' Right-Suite@ Universal 2017 17 0 16 RSU25116 Page 6
...ott.langeworlhy\Documents\York\BER UBE LOT 9.rup Calc=MJ7 House faces: N
SoftwareREScheck N
QT rl_
Compliance Certificate
00
00
�.
Project Foothills Builders 40
Energy Code: 2015 IECC
Location: Glens Falls, New York
Construction Type: Single-family
Project Type: New ConstructionY p
Conditioned Floor Area: 2,278 ft2
Glazing Area 16%
CU
Climate Zone: 6 (7635 HDD)
Permit Date, a
Permit Number: -C3
r6 C � 0
Construction Site: Owner/Agent: Designer/Contractor: 0) O b- U_
John Glendon Dr VISION Engineering, LLC
CV LL r-- U)
Lot 9 206 Glen Street
Queensbury, NY 12804 Suite 56
Glens Falls, NY 12801
Compllan,ze: O.o%BetterThan Code Maaxin'iurn UA: 334 Your LW 334
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
a
Ceiling 1: Raised or Energy Truss 1,450 38.0 0.0 0,025 36
Wall 1: Wood Frame, 16" D.C. 1,494 21.0 0.0 0.057 68
Window I.: Vinyl/Fiberglass Frame:Double Pane with Low-E 202 0.290 59
Door 1: Solid 34 0.200 7
Door 2: Solid 18 0.200 4
Door 3: Glass 20 0.240 5
Door 4: Glass 20 0.240 5
Wall 2: Wood Frame, 16" o.c. 965 21.0 0.0 0.057 48
Window 2: Vinyl/Fiberglass Frame:Double Pane with Low-E 119 0.290 35
Basement Wall 1: Solid Concrete or Masonry 1,295 0.0 15.0 0.046 58
Wall height: 7.8'
Depth below grade: 7.0'
Insulation depth: 7.8'
Window 3: Vinyl/Fiberglass Frame:Double Pane 12 0.340 4
Window 4: Vinyl/Fiberglass Frame:Double Pane with Law-E 16 0.290 5
Floor 1: All-Wood Joist/Truss:Over Outside Air 10 30.0 0.0 0.033 0
Project Title: Foothills Builders Report date: 11/03/17
Data filename: C:\Users\lrobision\Desktop\1280 rescheck.rck Page 1 of10
Compliance Statement, The proposed building design described h e isonsistent with the building plans, specifications, and other
calculations submitte with the permit application.The proposed wilding has been designed to rrreet the 2015 I CC requirements in
REScheck Version 4. 4 and to comply with the mandatory requ emeryts lis
teol the RESch"eck Inspection Chet lis
s'r
Name-Title Sign e ate
r
Project Title: Foothills Builders Report date: 11/03/17
Data filenarne: C:\Users\lrobision\Desktop\1280 rescheck,rck Page 2 of10
,
^
REScheck Software Version 4"6,4
M ����0r��������N���� ���=W����0=N�����
Inspection Checklist
U�
N�'���� n�'� � ���� ��
Energy Code: 2015 |ECC
Requirements: 0.096 were addressed directly in the RES[he[ksoftvare
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requinement, the user certifies that a code requirement will be met and how that is documented' or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plans Verified I
re-Inspettlon/plan Review Value Complies? I Comments/Assumptions
103.1, Construction drawings and ElCornplies
-lDoes Not
103.2 documentation demonstrate r
building envelope.Thermal E]Not Observable
ONot Applicable
envelope represented on
construction documents.
ElComplies
-]Does Not
103.1, Construction drawings and
103.2, documentation demonstrate
403.7 energy code compliance for
[]Not Observable
[PR311 lighting and mechanical systems.
Systems serving multiple. E]Not Applicable
dwelling units must demonstrate
compliance with the JECC
Commercial Provisions.
[PR2,12'' on loads calculated per ACCA Cooling: Cooling: F�Not Observable
Manual j or other methods Btu/hr Btu/hr— E]Not Applicable
approved by the code official,
Add|tfonaXCommmnents/Assumnptions:
Project Title: Foothills Builders Report date: II/83/I7
Data filename: [:\Users\|robision\Desktop\I280 rescheck.rck Page 3nfIO
pima;Verified'
Field ercfled
Foundation Inspection �d I�ae ' alfae Cora�piaes Cornments/Assumptions
402.1.1 Conditioned basement wall R- R- ❑Complies ;See the Envelope Assemblies
[FO411 insulation R-value.Where interior R_ R_ El
Not table for values.
6, insulation is used, verification
may need to occur during ❑Not Observable
Insulation Inspection. Not ❑Not Applicable
required in warm-humid locations
in Climate Zone 3.
_ __._,_----
....-----
.........,w__
E303.2 Conditioned basement wall ❑Complies
i[FO5]1 insulation installed per ❑Does Not
} manufacturer's instructions. '
QNot Observable
r
aC Not
___._........_._..._.._.__.._, .._...._....__.._._....._............_. Applicable....,. ......_,_............,. ____.._....._
402 2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies
[FO611 insulation depth of burial or ❑Does Not table for values,
E distance from top of wall.
❑Nat Observable
❑Not Applicable
C 111 to protect exposed exterior
_._.__. . __....._..
303 2.1 A protective covering is in OComplies
z p p ❑Does Not
insulation and extends a
minimum of 6 in. below grade. .;,ONot Obsen✓able
❑Not Applicable
40 .' 'Snow-and ice-melting system ❑Complies
C C)12] ,controls installed. "ODoes Not
Not Observable
C1Not Applicable
Additional Comments/Assumptions:
.... _..._...__._._..__
1 IHigh Impact(Tier 1) 2 [Medium Impact(Tier 2) Low Impact(Tier 3)
,,,._.... . . .....__ .. .,,_ _.a.._.___ .. ....
Project Title: Foothills Builders Report date. 11/03/17
Data filename: C:\Users\Irobision\Desktop\1280 rescheck.rck Page 4 of10
t[z�ra N r^�fxa ff r] i .........
m._..
lFraming/ sr 1 Inspection
r Complies?s? Coma eats/Ass mptlons
402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies
4023.4 ❑Does Not table for values.
[FRl]r
I FR ❑Not Observable
❑Nat Applicable €
402 1 1 Glazing U factor(area-weighted U- U ❑Corplies See the Envelope Assemblies
402.3.1, average). ❑Does Not table for values
402.3.3,
402,16, ❑Not Observable
402.5 ❑Not Applicable
[FR2]'
303.1.3 U-factors of fenestration products ❑Complies
[FR4]1 are determined in accordance ❑goes Not
f with the NFRC test procedure or '
taken from the default table. ❑Not Observable
❑Not Applicable
---.. .. ......ww.. _.__.._._. _ » .._._..._.,...,.
402.4.1.1 Air barrier and thermal barrier ❑Complies
[FR23]' installed per manufacturer's []Does Not
� . instructions. ,
❑Not Observable
❑Not Applicable
402.4 3 Fenestration that is not site built Complies❑ mm
[FR20] is listed and labeled as meeting ❑
Does Not
)�, AAMA/WDMA/CSA 101/1.5,2/A440
f or has infiltration rates per NFRC ❑Not Not
400 that do not exceed code ❑Not Applicable
limits.
�....._........__..._., _.._ ,� » ...; � w, .......................................... _
402A,5 IC-rated recessed lighting fixtures ❑Complies
WR1812 'sealed at housing/interior finish ❑Does Not
and labeled to indicate :s2.0 cfm ' '
leakage at 75 Pa. ❑Not Observable
❑Not Applicable
3.21 Supply and return ducts in attics ❑Complies
[FR12]1 insulated >= R-8 where duct is ❑Does Not
>=3 Inches in diameter and >= l�
' R-6 where 3 inches. Supply and ❑Nat Observable
( return ducts in other portions of ��' :; ❑Not Applicable
the building insulated >= R-6 for
diameter>= 3 inches and R-4.2
for< 3 inches in diameter. '
_............ .-..,.....,�... , .__....__.... _ � __... . ......_
403.3.3.5 'Building cavities are not used as ❑Complies
[FR15] ducts or plenums, ❑Doers Not
❑Not Observable
i
�,. Applicable
s»...�. .., _ _ ., . ..... ..�.
4g3';4 HVAC piping conveying fluids R- R- ❑Complies
[FR17]2 above 105 9F or chilled fluids ❑Does Not
below 55 QF are insulated to }R-
❑
3. Not Observable
❑Not Applicable
................_..._........ _.__ ❑Co m , .......,.. . _._ _. .. ..
403.4.1 Protection of insulation on HVAC plies
[FR24]' piping.
❑Does Not
❑Not Observable
❑Not Applicable
................. ...__... _...__ .. _....... -................_._.,...
403,53 Hot water pipes are insulated to R- R ❑Complies
[FRIO }R-3. ❑Does Not
❑Not Observable
❑Not Applicable
-... _,. _ _........ . .... .. ............ ......
_...
403 6a Automatic or,gravity dampers are * ❑Complies
ffA1912 installed on all outdoor air ❑Does Not
intakes and exhausts.
-]Not Observable
❑Not Applicable 9
..........
1 jHigh Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Irnpact(Tier 3)
Project Title: Foothills Builders Report date: 11/03/17
Data filename: C:\User,s\lrobision\Desktop\1280 rescheck,rck Page 5 of10
4
Additional Comments/Assumptions:
1 High Impact Medium Impact (Tier 2) Impact (Tier 3) _...._
Project Title: Foothills Builders Report date: 11/03/17
Data filename: C:\Users\lrobision\Desktop\1280 rescheck,rck Page 6 of10
Pi�
Va
ns Verifier lem ra ie _ _.,._......
nsulation Inspection erne ld Ii�e � lilies? Cep en s/Assu tions
7
3011 All installed insulation is labeled ❑Complies
[IN1812 or the installed R-values r `"
provided. r ❑Does Not
❑Not Observable
UNot Applicable
402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values.
f[IN1]1 ❑ Steel ❑ Steel ❑Not Observable
dye
❑Not Applicable
r..w._......_ _ _.._._.,_. _: _._...... _.. _._.__,.... _..
1303.2, Floor insulation installed per, ❑Complies
1402,23 manufacturer's instructions and ❑Does Not
j[IN2]1 in substantial contact with the '
l underside of the subfloor, or floor �� ❑Not Observable
framing cavity insulation is in ❑Not Applicable
contact with the top side of
sheathing, or continuous
insulation is installed on the
J underside of floor framing and
[ extends from the bottom to the
top of all perimeter floor framing
members.
402 1 1 Wall insulation R-value. If this is a R- R ❑Corplies See the Envelope Assemblies
402 2 S, mass wall with at least'/z of the Wood ❑ Wood ❑Does Not table for values.
402.2.E wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable
[IN3)' exterior,the exterior insulation
ce requirement applies (FR10), Steel ❑ Steel ❑Nat Applicable
303.2 Wall insulation is installed per ❑Complies
[IN4]1 manufacturer's instructions, ❑Does Not
❑Not Observable
[]Not Applicable
Additional Comments/Assumptions:
9 p k p --._- w. . )Ml High (Tier,1) Medium Impact (Tier 2) 3 Low Impact (Tier 3 ....._.._.a
Project Title: Foothills Builders Report date: 11/03/17
Data filenarne: C:\Users\lrobision\Desktop\1280 r-escheck.rck Page 7 of10
irr Plans►�9T�rcTrT� FT1 '�lf�rzfa �i
Final Inspection TTIITT ITCsT TTT C6TGN1Rl
,.. _m ...v..._,. __.___ _..._. .__ .._ .._._..... ._,. .' __..w,m ___ _ww w w.., _ _,..._,.---.._._,.
402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2, R Steel ❑ Steel ❑Not Observable
402.2.6
[Fill' �ElNot Applicable
303.1.1.1, 'Ceiling insulation installed per ❑Complies
p303.2 manufacturer's instructions, %❑Does Not
[F12]1 Blown insulation marked every
ill 300 ft' ❑Nat Observable
❑Nat Applicable
4C1 _ .._ __..m. _.........._.__..... __....... .._. _. �....._...__.mh, _..,
2.3 Vented attics with air"permeable ❑Complies
fF12212 insulation include baffle adjacent x --i❑Does Not
to soffit and eave vents that
extends over insulation. ❑Not Observable
❑Not Applicable
_.-.. _.._._._.._...._........ ........... ........... _ ., ._u _ ww _.._...__.._..__..... _..... _.__.._.._..... )
402.2.4 Attic access hatch and door R- R- ❑Complies
[F1311 insulation >_R-value of the ❑Does Not
adjacent assembly,
'.❑Not Observable
❑Not Applicable
402.4.1.2 'Blower door test @ 50 Pa. =5 ACH_ 0....4.____ _ACH ..........._._._.__.___._.............. "_... .... .............
......
50 = ❑Complies
[F11711 ach in Climate Zones 1-2, and ❑does Not
<=3 ach in Climate Zones 3-8.
k ❑Not Observable
❑Not Applicable
._........
...
403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 mplies
[F14]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not
I
<=3 cfm/100 ft2 without air
E handier @ 25 Pa. For rough-in ❑Nat Observable
l tests, verification may need to ❑Not Applicable
occur during Franvng Inspection
.,:. _ .._ ._ ..._.._... "............ ..............._. .................. ....._..............
403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies
[F12711 determine air leakage with ft2 ft2 ❑Does Not
either: Rough-in test:Total
t leakage measured with a ❑Not Observable
pressure differential of 0.1 inch ❑Not Applicable
t
w.g, across the system including
the manufacturer's air handler
E enclosure if installed at time of
j test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer's air
ler enclo
sure.
_,.,...... _._.. _, _._. . _..__.._.......__ _.........
_.__.._..._.
403.3.2.1 Air handler leakage designated ❑Complies
[FI24]1 by manufacturer at <=2% of F.j❑Does Not
design air flow.
❑Not Observable
❑Not
1Programmable
. Applicable .
Complies40311 Pro rammablethermostats
fF19] installed
__ _._._... _.,___ ........
for control of primary ❑Daes Not
heating and cooling systems and
initially set by manufacturer to ❑Nat Observable
code specifications ❑Not Applicable
4p3.1.2 Heat pump thermostat installed_.. „ � � _.._....... _ _, ........
❑Complies
[FI1012 on heat pumps. ❑Does Not
❑Not Observable
❑Not Applicable
03,5,1 Circulating service not water ❑Complies
[1`1112 systems have automatic or (❑Does Not
accessible manual controls.
(❑Not Observable
❑Not Applicable
1 �(
j High Impact(Tier 1) 2 I Medium Impact(Tier 2)„ 'f 3 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 11/03/17
Data filename: C:\llsers\lrobision\Desktop\1280 rescheck.rck Page 8 of10
an'
gift c�
Pros!InspectionProvisions i i F� 6a rEfi( M Complies? Comments/Assumptions �
........ ._ ..
4tf 41 "All mechanical ventilation system , ❑Complies
02512 ;fans not part of tested and listed ❑Does Not
HVAC equipment meet efficacy �r�! '❑Not Observable
and air flow limits. " []Not Applicable
_._._......
4t)3:2 Hot water boilers supplying heat ❑Complies
[F)212 through one-or two-pipe heating ❑Does Not
systems have outdoor setback
control to lower boiler water ❑Not Observable
temperature based on outdoor , ❑Not Applicable
temperature.
403,5,1.1 Heated water circulation systems ❑Complies
[Ft2812 have a circulation pump.The �� ❑Does Not
:system return pipe is a dedicated
'return pipe or a cold water supply ❑Not Observable
pipe. Gravity and thermos- ❑Not Applicable
syphon circulation systems are
not present. Controls for
circulating hot water system
Pumps start the pump with signal
;for hot water demand within the
occupancy. Controls
automatically turn off the pump ' '
'when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
_.,._.,_._..._.. ............... _.. _----- _ ..._.............
403. .1.2 :Electric heat trace systems ❑Complies
[F12 ) comply with IEEE 515.1 or UL ❑does Not
515. Controls automatically
adjust the energy input to the ❑Not Observable
heat tracing to maintain the ❑Not Applicable
desired water temperature in the
piping.
4035.2 Water distribution systems that ❑Complies
IF13012 have recirculation pumps that ❑Daes Not
pump water from a heated water
;supply pipe back to the heated ❑Not Observable
water source through a cold ❑Nat Applicable
water supply pipe have a
demand recirculation water '
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 1049F
_,............ _......... ........................
j
4015,4 Drain water heat recovery units ❑Complies
[F1332 tested in accordance with CSA ❑Does Not
855.1. Potable water-side
pressure loss of drain water heat ❑Not Observable
recovery units < 3 psi for ,� �� ❑Not Applicable
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units { 2 psi for
individual units connected to
three or more showers.
_ww ...,. �._._._.. .................... � � d
(404.1 75%of lamps in permanent ❑Complies
1[F1611 fixtures or 75%of permanent , ❑Does Not
fixtures have high efficacylamps.
lam 1
Does not apply ga low-voltage /' ❑Nat Observable
.... .. Not Applicablelighting_... ---__ ........4041.1 Fuel gas lighting systems have ❑Complies
[F12313 no continuous pilot light. ❑Daes Not
j ❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 rrLow Impact(Tier,3)
Project Title: Foothills Builders Report date: 11/03/17
Data filenarne: C:\Users\lrobision\Desktop\1280 rescheck.rck Page 9 of10
tlor Plansracer ed 8r� iel
Final Inspection Provisions Value Val Com a aes ants/Assumptions
__.w.._
Ct .3 Compliance certificate posted. �� ❑Complies
[F17]2 ❑Does Not
f ;❑Not Observable
y
�11�rr
❑Not Applicable
.............. ... .......... ..........._._......., _.,__..,._....._ ...,.......,_ ..._,.......__,__, ram w.w.ww>;-� � � In NM' ..._......_.__._..__..,.._._._...._ __._:._.....,__,,,_,.._....._ ......_...___._.,.,....__._ .,,..........,..,.
wtw�hSn hyy/��///Hnv»mhNn
30 .3 Manufacturer manuals for �� �� ❑Complies
[FI1'8JI mechanical and water heating ��'��/% ❑Does Not
systems have been provided.
F❑Not Observable
`❑Not Applicable
Additional Comments/Assumptions:
l High Impact(Tier 1) Medium Impact(Tier 2) how Impact(Tier 3)
Project Title: Foothills Builders Report date: 11/03/17
Data filename: C:\Users\lrobision\Desktop\1280 rescheck.rck Page 10 of10
2015 IECC Energy
Eff wiciency Certif i6cate
MCMMMOMMOMMIC230M
Above-Grade Wall 21.00
Below-Grade Wall 15.00
Floor 30.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Window 0.29
Door 0.20
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments