Loading...
RC-000718-2017 ' TO" OF QUEENSBURY 742 Bay Road,Queensbury,NY '12804-5904 (518)761-8201 .. Community Development-Building& Codes (518)761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-000718-2017 Date Issued: Thursday, March 29, 2018 This is to certify that work requested to be done as shown by Permit Number RC-000718-2017 has been completed. Tax Map Number: 295.15-2-7 Location: 74 JOHN CLENDON RD Owner: FOOTHILLS BUILDERS,LLC Applicant: FOOTHILLS BUILDERS,LLC This structure may be occupied as a: SFD w/in-law apt.2278 s.f. Cross Ref, Area Variance approval with 25 year condition placed up issuance By Order of Town Board of Certificate of Occupancy;In-Law Apartment expires year 2042 TOWN OF QUEENSBURY Z-AV-68-2017 Issuance of this Certificate of Occupancy DOES NOT relieve the , a property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code 1;nfbrcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development- Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: RC-000718-2017 :2 .,I Tax Map No: 295.15-4-6" Permission is hereby granted to: FOOTHILLS BUILDERS,LL,C For property located at: 74 JOI1N C.,ENDON RD In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information'hereto filed and approved and in compliance with the NYS I..iniform Building Codes and the Queensbury Coning Ordinance Tyne of Construction Owner Name: FOOT"HILL,S BUILDERS,I.0 Single Family-New $250,000.00 Owner Address: 9 Mountainside DR Total Value $250,000.00 Queensbury,NY 12804 Contractor or Builder's Name l Address Electrical Inspection Agency FOOTIILL L,S BUILDERS,LLC 9 Mountainside DR Queensbury,NY 12804 Plans&Specifications SIT)wlin-law apt.2278 s.f. Cross Ref.Area Variance approval with 25 year condition placed up issuance of Certificate of Occupancy;In-L,aw Apartment expires year 2042 G-AV-68-2017 $455.60 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,November 22,2018 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of ccns/��p �edn., y, ovember 22,2017' SIGNED BY: for the Town of Queensbury. Q' Director of Building&Code Enforcement PRINCIPAL STRUCTURE APPLICATION Office Use Only Date: I " _.___.. 'Tax Map 11) _._ �� ... �_ � �.m.. , Permit Fee Tone ".._ ,. _. _ Historic? Yes mm No Ree Fee ubdivis.ion Name ;" C, k1 � � (A b Llot C Site,Plarr# u vt dl to,#t f It .� o Project Location V"I TOWN R ,w RESOLUTION iq recreation fee for ir«*deV6w 11 ] lCici 1riI,� @axes/ sr�r Email , multiple family, apartments,condominiums,townhouses,and/or manufact r� prod ar harnes,� d p no l haves. This is in addition to the permit fee(s). Primary Owner(s) Foothills Builders Address 9 Mountainside Drive., Queenshury,NY 12804 phone/Email (518) 796-3520/(518) 791-1933 / FoothillsBuildersNY@giiiail.coi-n Applicant � Foothills Builders ltddress 9 Mountainside Drive, QueensbUry, NY 12804 � Phone/l�;txtall (518) 796-3520/(51.8) 791-1933 / FoothillsBuil.dersNY as niail.coni Contractor Foothills Builders �. . dress 9 Mountainside Drive„ Queensbury„NY 12804 P one/l rnail (518) 796.-3520/(518) 791-1933 / Footh.illsB ildersNY maia.il.com Contact Person for Building& Codes Compliance ((��mm ,L� � __.___..__.___.«__._ ._.Phone s­iw � 3_`2 �. Check all that apply New Addition Alteration I floor sf 2°"d floor sf Total sf Height SingleFamily Multi-Family (#f of units Townhouse nhouse Business Office Retail_Mercantile Factory-Industrial. Attached Garage (1, 2, :3, 4+) Cater Town of Queensbury Building&Codes Principal Structure Application revised January 2016 If commercial or industrial please indicate name of business Proposed rise of building or addition P, �r, f.1 �� �. Source of 1"lle�rt c��z°cue°c�rz�� �- _ ( ) t gas. Oil propane Solar Other 1"ireplace: C oap1e-te a se r_ar__„t_e-_i�_i_p_l_.1i c—at ic._n t_er_—F_u _1__3_..u_rn—z ___.... „ : x topptrance» -hi ys Are there structures not shown on plot plan? :re there casement: on tlae property? , i,, Site Information: a4 Dimensions or acreage of lot b. Is this a corner lct? es o g ca r the grade be changed as a result of construction =Yess X No d, Public water or Private well circle one, ublrc PrivAt e. Sewer or Private Septic System (circle care) Sewer rr-_.. Value of all work to be performed labor or materials) L, Ll I, I acknowledge no construction shall be corm-rrenced prior to issuance of a valid permit and will be completed within a 1.2 month period. . If work is not complete by the 1 year expiration date the pen-nit may be renewed, subject to foes and department.approval. . I certify that the application, plans and supporting materials are a trace and complete statement / description of the work proposed, that all work will be performed in accordance with the NYS Building CodesJocal building;laws and ordinances,and in conformance with local zonings regulations . 1 acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. . I also understand. that I /we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: DATE: S1 �� 1�: � _... .... ATE:_ For offfccR use only Operating Permit Issued: _ ""des o Occupancy Type Construction Classification Assembly Occupancy Limit Special Conditions ,t"own of Queerrsbrary Building&Codes Principal Structure application Revised January 2016 SEPTIC DISPOSAL APPLICATION 90 i Received DATE: Tax Map ID TAX MALE ID: Permit 110. Permit Fee (518)796-3650/ APPLICANT W.. Foothills Builders �� fE-MAIL ( 1 )791-1933 „_._.... _ _. ADDRESS 9 Mountainside.Drive Queensbury, NY 12804 .._..._.M_.._Foothill sBuildersl Y@guiai1,com BIJILDER Foothills builders Same as above OWNERFoothills builders ADDRESS ,. ..9 Mountainside Drive Quee:rasmbury,.mY..128C14.__..._� .._.w.....__..u_�....a.__......_,.......w.W....,.�„_.•__.w__.�.._,.__,..,_...._.....__.,._..__......._....___..._. CONTAC;°T PL; SON F'OR BUILDINGCODE,COMPLIANCE: Leuci PHONE/E-MAIL �(518)796/3520/ 51£1 i91-1933 /Footliil]sBuildersNY@gmail.com _�.,.,,i_.�..... RESIDENCE Ilv '1 .�_....___..,._�_. .__......._.m_.....___.._..._._.__._.._._.._..,,._w__.w_,, ._�_..,....�._._._______rv._..._.._..Ww_..rv�.____w_._..__...�. _..__.._�_.____..... ON � . ..�. , ........m..._..... Year Llailt of bedrooms, 9cas ta yc� _._.._..,.__..._...._...,.__...._.._...... . ......w:_ ga 1980 or older Caarba e grinder installed _.._�"� _..._...__._._.�_____._..w_.-., ...._n.__ ....._._.._._..._ _ .._.. _._._aw_.a.._ __._ µ_...,.__._.W... ....� No __. .___.__. ..__ ,...__ ......__.._.w._._.. ..,g..µu..___..,_._ __...._ b or Iot"rut)a Yes 1 to 19 1-1991 ---._.._.._.__.._..,.. Spa o.r if ut)installed ._.__mm.. ._.. , _...... nsf. 1992laresent PARCEL INFORMATION Topography " " Flat rolling Steep slope %Slope Soil Natarre Sand Loam Clay doer _ . ...____. ..._,._.._ ........_ ............. Groundwater At what ..._ depth: At Atuoat depth:/Ina erviour ,._........____....,......._.. __.._.... _,... _.._.___... __ ----- Domesticwell, Water Supply Municipal Well(if w ell,water supply from any septic system absorption is._ft.) perccaleatlearr'1`est__...___..._IT..._. air per eraraclW__. ..____.._.___.__, _._..__._w_.._ _..._ .__ _.m......_ _._.,. ._ . . -_.._.w._n...__ p per a(test to e completed by licensed engineerwdarcltitect) PROPOSED SYSTEM FOR�NEW CONSTRUCTION TankTm_._.mn.._.,�__...,_ .alloras(miss.sire_�._C9(l._mm.mm�,,....._._,___.._..._.w,__a._,. ___...__._._.....w_..v..._._._.._.._ ..�.__..__�._....___....�w__�.___,.,_,mm.�.... .._•_....._. ink size _...._41 0 gallons„add 2 0 gallons to size far each aarbage cylinder or spa or loot tub sierra Absorption field with L#2 ston. ...M__._ ..__._ _mw_.__...___.._..w....__..___. a. Absc Total length..... ....___._. It.,Each Trench........... Seepage:,Pit with kl.3 stone flow rnany: Size—... _ . ....._..._ ,__......_.. _ .,_..... __..w.. Altemative System Lied or other type _.__.m ...... Holding I`ank S stern Total required capacity? .. µ_ � Tank size _._ _ .n.� .o f.� y cttanks ,. Notes; 1)Alarm systerri r associated electrical work must e inspected by a Town approved electrical inspection agency;2) We willno longer allow systems to be:covered until such time as an As-built plan is received&approved. The installed system must snatch the septic,system layout on File _-no exceptions. Declaration: Any permit or approval granted which is based upon or,is granted in reliance upon any material representation or failure to snake;a material fact or c;ircumstaancer,known by or on behalf of an applicant,shall be void, 1 have react the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance, PRINTNAM 1�1'ATd lt� � � 5 � � _..__�. �°�_�._ DATE: Town of Queensbury Building&Codes Principal Structures Application Revised January 2016 Town of Queensbury 'I"hornas R. Van Ness Highway Department Highway Superintendent 742 Bay Road, Queensbury, NY 12804 Horne: 518-745-0929 Phone: 518-761-8211 Fax: 518-745-4466 David Duell Deputy Highway Superintendent Home: 518-745-0938 DRIVEWAY PEIM11' Date: Applicant Name: Foothills Builders ------------- S 2 Telephone No.: Address to be Inspected Return Addressa 9 Mountainside Drive Queensbury, NY 1,2804 Applicant must show exact location and width of driveway(s) to be connected to the highway by placing stakes at the specified location The Superintendent of Highways of the'rown of Queensbury has reviewed this application. The following action has been taken: STEP 1: Preliminary approval NEED Slight Swale Deep Swale Level with the road Level with the top of the paved wing Size culvert pipe to be used (if necessary) ( ) 12" ( ) 15" ( ) 18" ( ) 24" 36" Prefirninary inspection completed by: Date: Approval by Highway Supt.: or Deputy Supt.: Upon completion please resubmit this approval permit for a final approval. STEP 2: Final Approval Rejected Date: -ri"n-t-e"n--d-ien-t' -a-vidD-u,-e -5-e-p,u"t y- -1-1"i"g-J"i'w--a'"y-'S-u p-e,r-i-n-t-e-i i"d--e'n-t' Town of Queensbury Building&Codes Principal Strticture Application Revised Jarmary 2016 1280 Manual S Compliance Re ort Job: p Nov ®ate: Nov os,2017 Entire ouse By: SLL Plan: 1280 FOOTHILL BUILDERS CUEENSBURY, NY12804 ....11-111,1113 Far: JOE LEUCI, FOOTHILL BUILDERS � r QUEENSBURY, NY 12804 � °� Design Conditions Outdoor design DB: 85.0°F Sensible gain: 28393 Btuh Entering coil DB: 75.3°F Outdoor design WB: 71.0°F Latent gain: 6476 Btuh Entering coil WB: 62.6°F Indoor design DB: 75.0°F Total gain: 34869 Btuh Indoor RH: 50% Estimated airflow: 1359 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AG Manufacturer: York Model TCGD42S41S4+CX420B(6,9)35+T"(8,L)V*C16 Actual airflow: 1260 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% Design Conditions Outdoor design DB: -4.0°F Heat loss: 111269 Btuh Entering coil DB: 65.4°F Indoor design DB: 68.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: York Model: TM9X120D20MP11 Actual airflow: 1260 cfm Output capacity. 114000 Btuh 102% of load Temp. rise: 50 °F .1 -1-6 RC-000718-2017 Foothill FoothillS Builders 74 John CI ndon Rd., Lot 9 Meets are all requirements ofACCA Manual S. SFD W/in-lawapt. 2278 s.f. 2017-Nov-08 10:59:48 rlghtsoft' Right-Suiteg Universal 2017 17.0.16 RSU25116 Page 1 Xw ...ott.langeworthy\Documents\York\BERUBE LOT 9.rup Calc=MJ7 House faces: N — Res idential Plans­Examiner Review Form Form for HVAC RPER1 ACC,K° 15 MarV9 QUEENSBURY NY Meader Information Contractor: FOOTHILL BUILDERS REQUIRED ATTACHMENTS ATTACHED �nc�aniva| |ioanae. Manual J1 Form(and suPPorUng workaoeeta): Yea [] wn [] orMJ1AE Form*(and supporting wnrxshaets): Yes [] No [] — — OEM performance data(»eaU»Q.cooling,b|owe,): Yes No oBuxdingp|an#: 1280 �anua/ opncoonn�emm,hso��: Yes [] No [] [] Home address(Street orLot#.Block.Subdivision): . Entire House Duct distribution sketch: Yes [] No [] iditions Building Construction Information Winter Design Conditions Building Outdoor temperature: '4 OF Orientation: House faces North Indoor temperature: 68 OF North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 111269 Btuh Number nfbedrooms: 4 Conditioned floor area: 5881 ft2 Summer Design Conditions Number of occupants: O Outdoor temperature: 85 OF Indoor temperature: 75 OF Windows Grains difference: 27 y�|b @50% RH sa"e overhang uo�x: O M Roof Sensible heat gain: 31548 Btuo Internal shade: none Latent heatgain: 7196 s%uh mmu"'u=p"'°�� =�°Depth Window Total heat gain: 38744 suuh Number ofskylights: O � 7eafinq Equipment Da— Coolinq Equipment Data Blower Data E�uumace,Heat ipm p.n,/*^°',� Gas furnace ����°,,p"�p.°� Spn'� Heating 1260 ��� ----- � cpoxngdm: 1260 Model: York Mode: York Static in H20 TM9X120o20MP11 TCGo42G41G4 Fan's rated external static pressure for Heating output winter^," Bmh TTotal cooxngoopaoin, O amx ^°°m"omw° Heat� ' c—acity-- — ~�'---,---n— Sensible cooling capacity: O Btuh Aux. heating output capacity: 0 Btuh Latent cooling capacity: O emx HIVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1) Design airflow: 1260 cfn Longest supply duct: 8 ft Duct Materials Used Equipment design ESP: D in H2O Longest return duct: O ft Trunk duct: Total device pressure losses: 8 in H2O Total effective mnem(TsL): O ft Available static pressure(xSP): O inH3O Friction rate: D in/100ft Branch duct: Sheet metal Fric tion I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subjectto review and verification. Contractor's printed name: Contractor's signature: Date: Reserved for County,Town Municipality orAuthority having jurisdiction use. Mome qualifies for MJ1AE Form based on Abridged Edition Checklist + wrightScmW mnm'ounmm Universal zu1r1ro.1onouzs11a Project Summary Job: 1280 6, Date: Nov 08,2017 Entire House By: SILL FOOTHILL BUILDERS Plan: 1280 QUEENSBURY, NY 12804 For: JOE LEUCI, FOOTHILL BUILDERS QUEENSBURY NY 12804 Notes: Weather: Glens Falls AP, NY US Winter Design Conditions Summer Design Conditions Outside db -4 OF Outside db 85 ®F Inside db 68 OF Inside db 75 OF Design TD 72 OF Design TD 10 OF Daily range M Re ative humidity 50 % Moisture difference 27 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 104676 Btuh Structure 27069 Btuh Ducts 6593 Btuh Ducts 1324 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (pone) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 111269 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 25554 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 6476 Btuh D ucts 0 Btuh Central vent (0 cfm) 0 Btuh Heatin Coolin (pone) 1 5 8N Area (ft2 588 Equipment latent load 6476 Btuh Volume ft.) 52929 52929 Air chan es/hour 0.70 0.40 Equipment total load 32030 Btuh Equiv.2F (cfm) 618 353 Req. total capacity at 0.70 SHR 3.0 ton Heating Equipment Summary Cooling Equipment Summary Make York Make York Trade YORK Trade ADP Model TM9X120D20MP11 Cond TCGD42S41S4 AHRI ref 2008696 Coil CX420B(6,9)35+T-(8,L)V-C16 AHRI ref 6492466 Efficiency 95.5 AFU E Efficiency 11.0 EER, 14 SEER Heating input 120000 Btuh Sensible cooling 26460 Btuh Heating output 114000 Btuh Latent cooling 11340 Btuh Temperature rise 82 'F Total cooling 37800 Btuh Actual air flow 1260 cfm Actual air flow 1260 cfm Air flow factor 0.011 cfm/Btuh Air flow factor 0.044 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.81 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 2017-Nov-08 M59:48 wrilghftOft' Right-Suite@ Universal 2017 17,016 RSU25116 Page 1 ...ott.Vangeworthy\Documents\York\BERUBE LOT 9,rup Calc=VIJ7 House faces N Right-JCS Worksheet Job: 1280 Entire House Date: Nov 08,2017 y: L FOOTHILL BUILDERS Plan: SIL 1280 QUEENSBURY, NY 12804 -- MANUAL Ji 7th Ed, 1 Name of room Entire House Rooml Room2 Room3 2 Length of exposed wall 732,0 ft 164.0 ft 164,0 ft 45.0 ft 3 Room dimensions 1.0 x 1411 ft 1.0 x 1411 ft 1,0 x 376.0 ft 4 Ceilings Condit. Option 9.0 ft d 9.0 ft heat/cool 9,0 ft heat/cool 9.0 ft heat1cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) — EXPOSURE NO, Htg I Cig - (W) Htg C1g (ft') Htg I CIg (w) Htg CIg (ft2) Htg Clg 5 Gross a 12E3 5A 1,0 6588 1476 .... ... 1476 405 Exposed b 0 0 !!!!! **** -- !!!!!!! !!!I I I walls and c 0 0 HIM partitions d 0 0 1 e 0 0 f 0 0 11111 HIM 6 Windows and a 3D0 26.0 420 10917 80 2079 0 0 70 1819 glass doors b 0 0 0 0 0 0 0 0 0 Heating c 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 f 0 01 0 0 01 0 0 0 0 7 Windows and North 17,0 170 2890 20 340 0 0 70 1190 glass doors NE/NW 0 0 0 0 0 0 0 0 0 Cooling E/W 62,0 90 5580 60 3720 0 0 0 0 SE/SW 0 0 0 0 0 0 0 0 0 South MO 160 4800 0 0 0 0 0 0 — Harz 1 0 0 01 0 0 01 0 0 0 8 Other doors a 10DO 331 6.3 84 2782 526 0 0 0 0 0 0 21 696 131 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 01 0 0 0 0 0 0 0 9 Net a 12E 3 5.4 1,0 6084 32854 6206 1396 7538 1424 1476 7970 1506 314 1696 320 exposed b 0 0 0 0 1!!!! 0 0 i!! 0 0 0 0 walls and c 0 0 0 0 0 0 11 0 0 0 0 partitions d 0 0 0 0 0 0 0 0 0 0 e 0 0 Iffill 0 0 0 0 0 0 0 0 f 01 0 !1!111 0 0 i i 0 0 0 01 0 0 10 Ceilings a 16G 0 2A 11 2840 6748 3186 0 0 0 581 1380 652 6 14 7 to 0 0 0 0 M11 0 0 0 0 0 0 c 0 0 0 0 !!!!!! 0 0 0 0 0 0 d 0 0 0 0 Illlll 0 0 0 0 0 0 e 0 0 0 0 !!!!!! 0 0 0 0 0 0 f 0 0 0 0 111m 01 0 0 0 0 0 11 Floors a 1910 1.7 0 1411 2438 0 1411 2438 0 0 0 0 0 0 0 (Note: room b 1910 1,7 0 18 31 0 0 0 0 0 0 0 0 0 0 perimeter C 0 0 !!!!!! 0 0 1 0 0 0 0 0 0 is displ. d 0 0 HIM 0 0 !!!In0 0 0 0 0 0 for slab e 0 0 0 0 1!1!!! 0 0 HIM 0 0 0 0 floors) f 0� 0 0 0 11 M 0 0 MM 0 0 0 0 12 Infiltration a 970 7 7 504 48906 3881 80 7763 616 0 0 0 91 8830 701 .Ventilation 0 0 0 0 0 0. 01 0 13 Subtotal loss=6+8:.+11+12 104676 19819 9351 13055 Less external heating 0 0 0 0 Less transfer () .*** 0 0 0 Heating redistribution 0 **** 0 0 0 14 Duct loss 6% 6593 6% 1248 6% 589 6% 822 15 Total loss= 13+14 111269 21067 9940 13877 16 Int. gains: People 300 0 0 0 0 0 0 0 0 Appl. @ 1200 0 0 0 0 0 0 0 0 17 Subtot RSH gain=7+8-+12+16 27069 6100 2157 2349 Less external cooling 0 0 0 0 Less transfer 0 0 0 0 Coding redistribution 0 0 0 0 18 Duct gain 5% 1324 5% 298 5% 106 5% 115 19 Total RSH gain=(1 7+18)*P LF 1.00 28393 1,00 6398 1.00 2263 1.00 2464 20 Air required(cfm) 126�0 —------------L 1260� 239 284 113 100 157 109 I Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 2017-Nov-08 10:59:48 vvirilightsoft Right-Suited Universal 2017 17.0.16 RSU25116 Page 1 hw ...att.langeworthy\DocLiments\York\BERUBE LOT 9.rup Calc=MJ7 House faces. N Right-M)Worksheet Job: 1280 Entire House Date: Nov 08,2017 y: SILL FOOTHILL BUILDERS Plan: 1280 QUEENSBURY, NY 12804 -- MANUAL J:7th Ed, I Name of room Room4 Room5 Room6 Room? 2 Length of exposed wall 24.0 ft 27.0 ft 5.0 ft 17.0 ft 3 Room dimensions 1.0 x 297.0 ft 110 x 14.0 ft 5.0 x 11.0 ft 6.0 x 11.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool R 0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) - EXPOSURE NO. Htg Cig (ft2) Htg Cig (ft2) Htg Cig (ft2) Htg CIg (ft2) Htg Clg 5 Gross a 12E3 5.4 1.0 216 243 45 .... 153 Exposed b 0 0 HIM walls and c 0 0 ...... partitions d 0 0 e 0 0 f 0 0 mil HIM 6 Windows and a 3D0 26.0 30 780 40 1040 10 260 0 0 glass doors b 0 0 0 0 0 0 0 D 0 Heating c 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 f 0 0 0 0 01 0 0 0 0 7 Windows and North 17.0 15 255 15 255 0 0 0 0 glass doors NE/NW 0 0 0 0 0 0 0 0 0 Cooling E/W 62.0 0 0 25 1550 0 0 0 0 SE/SW 0 0 0 0 0 0 0 0 0 South 30.0 15 450 0 0 10 300 0 0 Horz 0 0 0 0 0 0 0 0 8 Other doors a 10DO 33.1 6.3 42 1391 263 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 1 0 01 0 01 0 01 0 9 Net a 12E 3 5.4 1.0 144 778 147 203 1096 207 35 189 36 153 826 156 exposed b 0 0 0 0 0 0 0 0 0 0 walls and C 0 0 0 0 0 0 0 0 0 0 partitions d 0 0 0 0 !!!M' 0 0 0 0 IIIIII 0 0 e 0 0 0 0 0 0 !Imf 0 0 0 0 f 0 0 0 0 0 0 0 0 pfm 0 0 10 Ceilings a 16G 0 2.4 1.1 272 646 305 182 432 204 55 131 62 66 157 74 b 0 0 0 0 0 0 !!!111 0 0 0 0 c 0 0 0 0 0 0 !11111 0 0 0 0 d 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 01 0 0 01 01 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note: room b 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 perimeter c 0 0 0 0 0 0 0 0 0 0 is displ. d 0 0 0 0 0 0 0 0 0 0 for slab e 0 0 0 0 0 0 IIIIII 0 0 IIIIII 0 0 floors) f 0 0 0 0 0 0 IIIIII 0 0 IIIIII 0 0 12 Infiltration a 97,0 7.7 72 6987 5541 40 3881 308 10 970 77 0 0 0 - Ventilation I............ I I -- 0 0 0 1 0 1 0 01 01 0 13 Subtotal loss=6+8..+11+12 10581 6450 1550 983 Less external heating 0 0 0 0 Less transfer 0 0 0 0 Heating redistribution 0 0 0 0 14 Duct loss 6% 666 6% 406 6% 98 6% 62 15 Total loss= 13+14 11248 - 6856 - 1648 1045 16 Int. gains: People @ 300 0 0 0 0 0 0 0 0 Appl. @ 1200 0 0 0 0 0 0 0 0 17 Subtot RSH gain=7+8-+12+16 1974 2524 - 474 230 Less external cooling 0 0 0 Less transfer 0 0 0 0 0 Cooling redistribution 0 0 0 0 18 Duct gain 5% 97 5% 123 5% 23 5% 11 19 Total RSH gain=(1 7+18)*P LF 1.00 2071 1.00 2648 1.00 498 1.00 241 20 1 Air required(cfm) 1 127 92 78 118 19 22 12 11 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 0:ag 2 e 2017-Nov-08 159:48 wrightsoft" Right-Suited Universal 2017 17.0.16 RSU25116 P ...ott.langeworthy\Documents\York\BERUBE LOT 9.rup Calc=MJ7 House faces: N Right-J@ Worksheet Job: 1280 Entire House Date: Nov 08,2017 : SILL FOOTHILL BUILDERS Plan: 1280 QUEENSBURY, NY 12804 -- MANUAL J: 7th Ed. 1 Name of room Room8 Roon-9 Room10 Roon-11 2 Length of exposed wall 3.0 ft 24.0 ft 19.0 ft 0 ft 3 Room dimensions 13.0 x 3.0 ft 12.0 x 12.0 ft 17.0 x 12.0 ft 6.0 x 3.0 ft 4 Ceilings -Condit, Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) - EXPOSURE - NO, Htg CIg (ft2) Htg CIg (w) Htg CIg (ft2) Htg Cig (ft2) Htg CIg 5 Gross a 12E 3 5.4 1.0 27 216 171 0 Exposed b 0 0 HIM HIM walls and c 0 0 HIM partitions d 0 0 HIM a 0 0 HIM f 0 0 MM IM! 6 Windows and a 3D0 26.0 5 130 30 780 30 780 0 0 0 0 0 0 0 0 glass doors b Heating c 0 0 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 f- 0 0 0 0 0 0 0 0 0 7 Windows and North 17.0 0 0 0 0 0 0 0 0 glass doors NE/NW 0 0 0 0 0 0 0 0 0 Cooling E/W 62.0 5 310 0 0 0 0 0 0 SE/SW 0 0 0 0 0 0 0 0 0 South 30.0 0 0 30 900 30 900 0 0 Harz 0 0 0 0 0 0 0 0 0 8 Other doors a 10DO 33A 6.3 0 0 01 0 0 0 21 696 131� 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 22 119 22 186 1004 190 120 648 122 0 0 0 exposed b 0 0 0 0 0 0 0 0 0 0 walls and c 0 0 0 0 0 0 0 0 0 0 partitions Fd 0 0 0 0 0 0 0 0 IIIIII 0 0 a 0 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 IIIIII 0 0 0 0 10 Ceilings a 16G0 2.4 1A 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 1!!!!! 0 0 0 0 IIIIII 0 0 c 0 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 0 - f 0. 0 0 0 0 0, 0 0 0 01 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note: room b 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 perimeter C 0 0 0 0 !!!!!! 0 0 0 0 0 0 is displ. d 0 0 0 0 i!!! 0 0 0 0 0 0 for slab a 0 0 0 0 !!!!!! 0 0 IIIIII 0 0 IIIIII 0 0 floors) f 0 0 0 0 llte 0 0 0 0 !!!!.11 01 0 I 12 Infiltration a 97.0 7.7 5 485 39 30 2911 231 51 4949 393 0 0 0 Ventilation 1 0 0 0 1 0 0 0 0 0 13 Subtotal loss=6+8,.+11+12 734 4695 7072 ... .. 0 Less external heating 0 0 0 0 Less transfer 0 0 0 0 Heating redistribution 0 0 0 0 14 Duct loss 6% 46 6% 296 6% 445 6% 0 15 Total loss= 13+14 - 780 4991 1 7518 01 16 Int.gains: People 300 0 0 0 0 0 0 0 0 Appl, @ 1200 0 0 0 0 0 0 0 0 17 Subtot RSH gain=7+8..+12+16 371 1321 1547 0 Less external cooling 0 0 0 0 Less transfer 0 0 0 0 Cooling redistribution 0 0 0 0 18 Duct gain 5% 18 5% 65 5% 76 5% 0 19 Total RSH gain=(1 7+18)*P LF 1.00 389 1.00 1385 1.00 1622 1,00 0 20 Air required(cfm) n 11 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 4 2017-Nov-08 10:59:48 j+ vvrightsoft', Right-Suitet Universal 2017 1T0,16 RSU25116 Page 3 4.11 ...ott.langeworthy\Documents\York\BER UBE LOT 9.rup Calc=MJ7 House faces: N Right-M) Worksheet Job: 1280 Entire House Date: Nov 08,2017 y: SILL FOOTHILL BUILDERS Plan: 1280 QUEENSBURY, NY 12804 -- MANUAL J 7th Ed. I Name of room Room 13 Room14 Room16 Room17 2 Length of exposed wall 120.0 ft 27.0 ft 25,0 ft 7.0 ft 3 Room dimensions 1.0 x 839.0 ft 1.0 x 186,0 ft 1.0 x 112.0 ft 7.0 x TO ft 4 Ceilings Condit.Option 9,0 ft heat/cocq 9,0 ft heat/cool 9,0 ft heat/cool 9,0 ftj heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) — EXPOSURE NO. Htg Clg (ft') Htg I Clg (w) Htg Clg (ft2) Htg Clg (w) Htg I Clg 5 Gross a 12E3 5.4 1.0 1080 243 Exposed b 0 0 !!!111 225 63 walls and c 0 0 !!!ffj HIM HIM HIM partitions d 0 0 ...... a 0 0 HIIII f 0 0 HIM 6 Windows and a 3D0 26.0 0 0 30 780 20 520 0 0 glass doors b 0 0 0 0 0 0 0 0 0 Heating C 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0 0 0 0 0, 7 Windows and North ITO 0 0 30 510 20 340 0 0 glass doors NE/NW 0 0 0 0 0 0 0 0 0 Cooling E/W 62.0 0 0 0 0 0 0 0 0 SE/SW 0 0 0 0 0 0 0 0 0 South 30.0 0 0 0 0 0 0 0 0 Harz 0 0 <» 0 0 1 0 01 01 0 0 8 Other doors a�10D1 331 6.3 0 0� 0 ol 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 0 0 0 0 01 0 b 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 1080 5832 1102 213 1150 217 205 1107 209 63 340 64 exposed b 0 0 0 0 HIM 0 0 MM 0 0 0 0 walls and c 0 0 0 0 0 0 HIM 0 0 !M 0 0 partitions d 0 0 m!ll 0 0 0 0 !!!! 1 0 0 M 0 0 a 0 0 !!!!!! 0 0 0 0 11 0 0 0 0 - f 0 0 !11!11 0 0 01 0 0 01 0 0 10 Ceilings a 16GO 2.4 1A 839 1993 941 186 442 209 112 266 126 49 116 55 b 0 0 !1111 0 0 n 0 0 0 0 0 0 C 0 0 !!!Ill 0 0 0 0 0 0 0 0 d 0 0 1!1111 0 0 0 0 0 0 0 0 e 0 0 0 0 0 0 HIM 0 0 0 0 f. 01 0 0 0 0 0 !!!!!! 01 0 01 0 11 Floors a 1910 1,7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note: room b 1910 1.7 0 9 16 0 0 0 0 0 0 0 0 0 0 perimeter C 0 0 !!Im 0 0 0 0 0 0 0 0 is displ, d 0 0 0 0 0 0 0 0 IIIIII 0 0 for slab e 0 0 0 0 0 0 0 0 IIIIII 0 0 floors) f 0 0 0 0 0, 0 0 0, 11!!!! 0 0 12 Infiltration a 97.0 7.7 0 0 01 30 2911 231 20 1941 154 0 0 0 ,Ventilation --0 0 0 0 0 0 01 0 13 Subtotal loss=6+8.+11+12 7841 — — 5283 .... 3834 457 Less external heating 0 — — 0 0 0 ... Less transfer 0 — 0 0 0 Heating redistribution 0 ... 0 — 0 0 14 Duct loss 6% 494 6% 333 6% 241 6% 29 15 Total loss= 13+14 1 8335 -- 5616, -- 4075 — 485 16 Int. gains: People @ 300 0 -- 0 0 -- 0 0 — 0 0 0 Appl. @ 1200 0 0 0 0 0 0 0 0 17 Subtot RSH gain=7+8..+12+16 2043 1167 829 119 Less extemal cooling 0 0 0 0 Less transfer 0 0 0 0 Cooling redistribution — 0 0 0 0 18 Duct gain 5% 100 5% .. 57 5% 41 5% 6 19 Total RSH gain=(1 7+18)*P LF 1.00 21431 1.00 1224 1.00 8691 1.00 125 20 Air required(cfm) --------L— 94 64 54 1 1 1 46 1 51 6 1 Calculations apEroved by AC 'A to meet all requirements of Manual J 7th Ed. 4IJ4- wrightsoft", 2017-Nov-08 10:%48 Right-Suite(D Universal 2017 17,0.16 RSU25116 Page 4 ...ott.langeworthy\Documents\York\BERUBE LOT 9.rLIP Calc=MJ7 House faces: IN Right-J@ Worksheet Job: 1280 Entire House Date: Nov 08,2017 L FOOTHILL BUILDERS Plan: B(,n: 12 SL80 QUEENSBURY, NY 12804 -- MANUAL J:7th Ed. 1 Name of room Room18 Room 19 Room20 Room21 2 Length of exposed wall 0 ft 25.0 ft 9.0 ft 4.0 ft 3 Room dimensions 7.0 x 9.0 ft 1.0 x 146.0 ft 1.0 x 95,0 ft 14.0 x 4.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft j heat/cool 9.0 ft heat/cool TYPE OF CST HTMArea Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)EXPOSURE NO. Htg Clg (f t2) Htg Cig (ft') Htg I Clig (w) Htg Cjg (ft') Htg I C1g 5 Grass a 12E3 5.4 1,0 0 225 81 --- 36 Exposed b 0 0 MlH HIM HIM walls and C 0 0 HIM partitions d 0 0 e 0 0 f 0 0 HIM HIM 6 Windows and a 3D0 26.0 0 0 30 780 15 390 0 0 glass doors b 0 0 0 0 0 0 0 0 0 Heating c 0 0 0 0 0 0 0 0 0 d 0 0 0 «< 0 0 0 0 0 0 e 0 0 0 0 0 0 0 0 0 f 0 0 0 0 0, 0 0 1 0 Oil 7 Windows and North 17.0 0 0 0 0 0 0 0 0 glass doors NE/NW 0 0 0 0 0 0 0 0 0 Cooling E/W 62.0 0 0 0 0 0 0 0 0 SE/SW 0 0 0 0 0 0 0 0 0 South 30.0 0 0 30 900 15 450 0 0 Horz 0 0 0 0 0 0, 0 0 0 8 Other doors a 10DO 331 6,3 0 0 0 o o o 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 — C 0 0 0 0 01 0 01 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1 0 0 0 0 195 1053 199 66 356 67 36 194 37 exposed b 0 0 0 0 0 0 !!!!!I 0 0 IIIII 0 0 walls and c 0 0 0 0 0 0 !fml 0 0 0 0 partitions d 0 0 0 0 0 0 !!!!!! 0 0 0 0 e 0 0 loll!! 0 0 0 0 !!1111 0 0 0 0 f 0 0 0 0 !m! 0 of 0 0 0 0 10 Ceilings a 16GO 2,4 11 63 150 71 146 347 164 95 226 107 56 133 63 b 0 0 if!!!! 0 0 !!!!!! 0 0 0 0 0 0 C 0 0 !fIfIf 0 0 !11111 0 0 0 0 0 0 d 0 0 1 0 0 i!!i!! 0 0 !!!111 0 0 !!III" 0 0 e 0 0 0 0 1 i!i!! 0 0 0 0 11 0 0 f 1 01 0 0 0 M 01 0 0 01 !!!!!! 0 0 11 Floors a 1910 1,7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note: room b 1910 1.7 0 0 0 0 2 3 0 7 12 0 0 0 0 perimeter c 0 0 0 0 11111 0 0 0 0 0 0 is displ. d 0 0 0 0 !!!!1! 0 0 0 0 0 0 for slab a 0 0 0 0 !!M 0 0 0 0 0 0 floors) If 0 0 HIM. 0 0 !!!!!!1 0 0 0 0 0 0 12 Infiltration a 97,0 7.7 0 0 0 30 2911 231 15 1456 116 0 0 0 Ventilation 1 0 0 of 0 0 0 1 01 0 13 Subtotal loss=6+8,,+11+12 150 5094 2440 327 Less external heating 0 0 0 0 Less transfer 0 0 0 0 Heating redistribution — 0 0 0 0 14 Duct loss 6% 9 6% 321 6% 154 6% 21 15 Total loss= 13+14 -- 159 — 5415 2593 — 348 16 Int.gains: People @ 300 0 0 0 — 0 0 -- 0 0 0 Appl. @ 1200 0 0 0 — 0 0 0 0 0 17 Subtot RSH gain=7+8..+12+16 ... 71 — 1494 739 *... 100 Less external cooling 0 0 0 0 Less transfer 0 0 0 0 Cooling redistribution 0 0 0 0 18 Duct gain 5% 3 5% 73 5% 36 5% 5 19 Totat RSH gain=(17+18)*PLF 1.00 741 1.00 1567 1.00 776 1.00 104 20 Air required(cfm) 2, 31 61, 70. 1 291 341 1 41 51 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 'A wrlghtSOft" 2017-Nov-08 10:59:48 Right-Suited Universal 2017 17,0,16 RSU25116 Page 5 ...ott.langeworthy\Documents\York\BERUBE LOT 9.rup Calc=MJ7 House faces: N Right-J@ Worksheet Job: 1280 Entire House Date: Nov 08,2017 y: L FOOTHILL BUILDERS Plan: SL 80 lan: 12 QUEENSBURY, NY 12804 MANUAL J:7th Ed. 1 Name of room Room22 2 Length of exposed wall 23.0 ft 3 Room dimensions 12.0 x 11.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool TYPE OF HTM Area Load(Btuh) Area Area Area EXPOSURE — NS07T Htg CIg (ft2) Htg CIg Htg CIg I Htg Clg Htg CIg 5 Gross a 12E3 5.4 1.0 207 Exposed b 0 0 walls and c 0 0 partitions d 0 0 e 0 0 f 0 0 6 Windows and a 3D0 26.0 30 780 glass doors b 0 0 0 Heating c 0 0 0 d 0 0 0 e 0 0 0 f 0 0 0 7 Windows and North 170 0 0 glass doors NE/NW 0 0 0 Cooling E/W 62.0 0 0 SE/SW 0 0 0 South 30.0 30 900 Horz 0 0 0 8 Other doors a 10DO 33.1 6.3 0 0 0 b 0 0 0 0 0 I c- 01 0 01 0 0 9 Net a 12E 3 5.4 1.0 177 956 181 exposed b 0 0 !!!I 1 0 0 walls and c 0 0 !11111 0 0 partitions d 0 0 !!!!!! 0 0 e 0 0 Mill 0 0 f 0 0 0 0 10 Ceilings a 16G 0 24 1,1 132 314 148 b 0 0 !1!11 0 0 c 0 0 0 0 d 0 0 0 0 e 0 0 !11111 0 0 f 0 0 !!!!!! 0 0 11 Floors a 1910 1.7 0 0 0 0 (Note: room b 1910 1 7 0 0 0 0 perimeter c 0 0 f 1 0 0 is displ. d 0 0 !Iim 0 0 for slab e 0 0 !!!!!! 0 0 floors} If1 1 01 0 1 M!1 0 01 12 Infiltration a 97.0 7.7 30 2911 231 Ventilation 0 0 13 Subtotal loss=6+8.,+11+12 4960 Less external heating 0 Less transfer 0 Heating redistribution 0 14 Duct loss 6% 312 15 Total loss= 13+14 5273 16 Int. gains: People @ 300 0 0 Appl, @ 1200 0 0 17 Subtot RSH gain=7+8,.+12+16 1460 Less external cooling 0 Less transfer 0 Cooling redistribution 0 18 Duct gain 5% 71 19 Total RSH gain=(I 7+18)*P LF 1,00 1531 20,Air required(cfm) 1 1 601 681 1 1 1 1 1 1 1 Calculations approved by ACCA to meet all rtguirements of Manual J 7th Ed. 2017-Nov-08 10:59:48 wrightSoft"' Right-Suite@ Universal 2017 17 0 16 RSU25116 Page 6 ...ott.langeworlhy\Documents\York\BER UBE LOT 9.rup Calc=MJ7 House faces: N SoftwareREScheck N QT rl_ Compliance Certificate 00 00 �. Project Foothills Builders 40 Energy Code: 2015 IECC Location: Glens Falls, New York Construction Type: Single-family Project Type: New ConstructionY p Conditioned Floor Area: 2,278 ft2 Glazing Area 16% CU Climate Zone: 6 (7635 HDD) Permit Date, a Permit Number: -C3 r6 C � 0 Construction Site: Owner/Agent: Designer/Contractor: 0) O b- U_ John Glendon Dr VISION Engineering, LLC CV LL r-- U) Lot 9 206 Glen Street Queensbury, NY 12804 Suite 56 Glens Falls, NY 12801 Compllan,ze: O.o%BetterThan Code Maaxin'iurn UA: 334 Your LW 334 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. a Ceiling 1: Raised or Energy Truss 1,450 38.0 0.0 0,025 36 Wall 1: Wood Frame, 16" D.C. 1,494 21.0 0.0 0.057 68 Window I.: Vinyl/Fiberglass Frame:Double Pane with Low-E 202 0.290 59 Door 1: Solid 34 0.200 7 Door 2: Solid 18 0.200 4 Door 3: Glass 20 0.240 5 Door 4: Glass 20 0.240 5 Wall 2: Wood Frame, 16" o.c. 965 21.0 0.0 0.057 48 Window 2: Vinyl/Fiberglass Frame:Double Pane with Low-E 119 0.290 35 Basement Wall 1: Solid Concrete or Masonry 1,295 0.0 15.0 0.046 58 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 3: Vinyl/Fiberglass Frame:Double Pane 12 0.340 4 Window 4: Vinyl/Fiberglass Frame:Double Pane with Law-E 16 0.290 5 Floor 1: All-Wood Joist/Truss:Over Outside Air 10 30.0 0.0 0.033 0 Project Title: Foothills Builders Report date: 11/03/17 Data filename: C:\Users\lrobision\Desktop\1280 rescheck.rck Page 1 of10 Compliance Statement, The proposed building design described h e isonsistent with the building plans, specifications, and other calculations submitte with the permit application.The proposed wilding has been designed to rrreet the 2015 I CC requirements in REScheck Version 4. 4 and to comply with the mandatory requ emeryts lis teol the RESch"eck Inspection Chet lis s'r Name-Title Sign e ate r Project Title: Foothills Builders Report date: 11/03/17 Data filenarne: C:\Users\lrobision\Desktop\1280 rescheck,rck Page 2 of10 , ^ REScheck Software Version 4"6,4 M ����0r��������N���� ���=W����0=N����� Inspection Checklist U� N�'���� n�'� � ���� �� Energy Code: 2015 |ECC Requirements: 0.096 were addressed directly in the RES[he[ksoftvare Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requinement, the user certifies that a code requirement will be met and how that is documented' or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Plans Verified I re-Inspettlon/plan Review Value Complies? I Comments/Assumptions 103.1, Construction drawings and ElCornplies -lDoes Not 103.2 documentation demonstrate r building envelope.Thermal E]Not Observable ONot Applicable envelope represented on construction documents. ElComplies -]Does Not 103.1, Construction drawings and 103.2, documentation demonstrate 403.7 energy code compliance for []Not Observable [PR311 lighting and mechanical systems. Systems serving multiple. E]Not Applicable dwelling units must demonstrate compliance with the JECC Commercial Provisions. [PR2,12'' on loads calculated per ACCA Cooling: Cooling: F�Not Observable Manual j or other methods Btu/hr Btu/hr— E]Not Applicable approved by the code official, Add|tfonaXCommmnents/Assumnptions: Project Title: Foothills Builders Report date: II/83/I7 Data filename: [:\Users\|robision\Desktop\I280 rescheck.rck Page 3nfIO pima;Verified' Field ercfled Foundation Inspection �d I�ae ' alfae Cora�piaes Cornments/Assumptions 402.1.1 Conditioned basement wall R- R- ❑Complies ;See the Envelope Assemblies [FO411 insulation R-value.Where interior R_ R_ El Not table for values. 6, insulation is used, verification may need to occur during ❑Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. _ __._,_---- ....----- .........,w__ E303.2 Conditioned basement wall ❑Complies i[FO5]1 insulation installed per ❑Does Not } manufacturer's instructions. ' QNot Observable r aC Not ___._........_._..._.._.__.._, .._...._....__.._._....._............_. Applicable....,. ......_,_............,. ____.._....._ 402 2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [FO611 insulation depth of burial or ❑Does Not table for values, E distance from top of wall. ❑Nat Observable ❑Not Applicable C 111 to protect exposed exterior _._.__. . __....._.. 303 2.1 A protective covering is in OComplies z p p ❑Does Not insulation and extends a minimum of 6 in. below grade. .;,ONot Obsen✓able ❑Not Applicable 40 .' 'Snow-and ice-melting system ❑Complies C C)12] ,controls installed. "ODoes Not Not Observable C1Not Applicable Additional Comments/Assumptions: .... _..._...__._._..__ 1 IHigh Impact(Tier 1) 2 [Medium Impact(Tier 2) Low Impact(Tier 3) ,,,._.... . . .....__ .. .,,_ _.a.._.___ .. .... Project Title: Foothills Builders Report date. 11/03/17 Data filename: C:\Users\Irobision\Desktop\1280 rescheck.rck Page 4 of10 t[z�ra N r^�fxa ff r] i ......... m._.. lFraming/ sr 1 Inspection r Complies?s? Coma eats/Ass mptlons 402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies 4023.4 ❑Does Not table for values. [FRl]r I FR ❑Not Observable ❑Nat Applicable € 402 1 1 Glazing U factor(area-weighted U- U ❑Corplies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values 402.3.3, 402,16, ❑Not Observable 402.5 ❑Not Applicable [FR2]' 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑goes Not f with the NFRC test procedure or ' taken from the default table. ❑Not Observable ❑Not Applicable ---.. .. ......ww.. _.__.._._. _ » .._._..._.,...,. 402.4.1.1 Air barrier and thermal barrier ❑Complies [FR23]' installed per manufacturer's []Does Not � . instructions. , ❑Not Observable ❑Not Applicable 402.4 3 Fenestration that is not site built Complies❑ mm [FR20] is listed and labeled as meeting ❑ Does Not )�, AAMA/WDMA/CSA 101/1.5,2/A440 f or has infiltration rates per NFRC ❑Not Not 400 that do not exceed code ❑Not Applicable limits. �....._........__..._., _.._ ,� » ...; � w, .......................................... _ 402A,5 IC-rated recessed lighting fixtures ❑Complies WR1812 'sealed at housing/interior finish ❑Does Not and labeled to indicate :s2.0 cfm ' ' leakage at 75 Pa. ❑Not Observable ❑Not Applicable 3.21 Supply and return ducts in attics ❑Complies [FR12]1 insulated >= R-8 where duct is ❑Does Not >=3 Inches in diameter and >= l� ' R-6 where 3 inches. Supply and ❑Nat Observable ( return ducts in other portions of ��' :; ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. ' _............ .-..,.....,�... , .__....__.... _ � __... . ......_ 403.3.3.5 'Building cavities are not used as ❑Complies [FR15] ducts or plenums, ❑Doers Not ❑Not Observable i �,. Applicable s»...�. .., _ _ ., . ..... ..�. 4g3';4 HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105 9F or chilled fluids ❑Does Not below 55 QF are insulated to }R- ❑ 3. Not Observable ❑Not Applicable ................_..._........ _.__ ❑Co m , .......,.. . _._ _. .. .. 403.4.1 Protection of insulation on HVAC plies [FR24]' piping. ❑Does Not ❑Not Observable ❑Not Applicable ................. ...__... _...__ .. _....... -................_._.,... 403,53 Hot water pipes are insulated to R- R ❑Complies [FRIO }R-3. ❑Does Not ❑Not Observable ❑Not Applicable -... _,. _ _........ . .... .. ............ ...... _... 403 6a Automatic or,gravity dampers are * ❑Complies ffA1912 installed on all outdoor air ❑Does Not intakes and exhausts. -]Not Observable ❑Not Applicable 9 .......... 1 jHigh Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Irnpact(Tier 3) Project Title: Foothills Builders Report date: 11/03/17 Data filename: C:\User,s\lrobision\Desktop\1280 rescheck,rck Page 5 of10 4 Additional Comments/Assumptions: 1 High Impact Medium Impact (Tier 2) Impact (Tier 3) _...._ Project Title: Foothills Builders Report date: 11/03/17 Data filename: C:\Users\lrobision\Desktop\1280 rescheck,rck Page 6 of10 Pi� Va ns Verifier lem ra ie _ _.,._...... nsulation Inspection erne ld Ii�e � lilies? Cep en s/Assu tions 7 3011 All installed insulation is labeled ❑Complies [IN1812 or the installed R-values r `" provided. r ❑Does Not ❑Not Observable UNot Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. f[IN1]1 ❑ Steel ❑ Steel ❑Not Observable dye ❑Not Applicable r..w._......_ _ _.._._.,_. _: _._...... _.. _._.__,.... _.. 1303.2, Floor insulation installed per, ❑Complies 1402,23 manufacturer's instructions and ❑Does Not j[IN2]1 in substantial contact with the ' l underside of the subfloor, or floor �� ❑Not Observable framing cavity insulation is in ❑Not Applicable contact with the top side of sheathing, or continuous insulation is installed on the J underside of floor framing and [ extends from the bottom to the top of all perimeter floor framing members. 402 1 1 Wall insulation R-value. If this is a R- R ❑Corplies See the Envelope Assemblies 402 2 S, mass wall with at least'/z of the Wood ❑ Wood ❑Does Not table for values. 402.2.E wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN3)' exterior,the exterior insulation ce requirement applies (FR10), Steel ❑ Steel ❑Nat Applicable 303.2 Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions, ❑Does Not ❑Not Observable []Not Applicable Additional Comments/Assumptions: 9 p k p --._- w. . )Ml High (Tier,1) Medium Impact (Tier 2) 3 Low Impact (Tier 3 ....._.._.a Project Title: Foothills Builders Report date: 11/03/17 Data filenarne: C:\Users\lrobision\Desktop\1280 r-escheck.rck Page 7 of10 irr Plans►�9T�rcTrT� FT1 '�lf�rzfa �i Final Inspection TTIITT ITCsT TTT C6TGN1Rl ,.. _m ...v..._,. __.___ _..._. .__ .._ .._._..... ._,. .' __..w,m ___ _ww w w.., _ _,..._,.---.._._,. 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, R Steel ❑ Steel ❑Not Observable 402.2.6 [Fill' �ElNot Applicable 303.1.1.1, 'Ceiling insulation installed per ❑Complies p303.2 manufacturer's instructions, %❑Does Not [F12]1 Blown insulation marked every ill 300 ft' ❑Nat Observable ❑Nat Applicable 4C1 _ .._ __..m. _.........._.__..... __....... .._. _. �....._...__.mh, _.., 2.3 Vented attics with air"permeable ❑Complies fF12212 insulation include baffle adjacent x --i❑Does Not to soffit and eave vents that extends over insulation. ❑Not Observable ❑Not Applicable _.-.. _.._._._.._...._........ ........... ........... _ ., ._u _ ww _.._...__.._..__..... _..... _.__.._.._..... ) 402.2.4 Attic access hatch and door R- R- ❑Complies [F1311 insulation >_R-value of the ❑Does Not adjacent assembly, '.❑Not Observable ❑Not Applicable 402.4.1.2 'Blower door test @ 50 Pa. =5 ACH_ 0....4.____ _ACH ..........._._._.__.___._.............. "_... .... ............. ...... 50 = ❑Complies [F11711 ach in Climate Zones 1-2, and ❑does Not <=3 ach in Climate Zones 3-8. k ❑Not Observable ❑Not Applicable ._........ ... 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 mplies [F14]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not I <=3 cfm/100 ft2 without air E handier @ 25 Pa. For rough-in ❑Nat Observable l tests, verification may need to ❑Not Applicable occur during Franvng Inspection .,:. _ .._ ._ ..._.._... "............ ..............._. .................. ....._.............. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F12711 determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total t leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable t w.g, across the system including the manufacturer's air handler E enclosure if installed at time of j test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air ler enclo sure. _,.,...... _._.. _, _._. . _..__.._.......__ _......... _.__.._..._. 403.3.2.1 Air handler leakage designated ❑Complies [FI24]1 by manufacturer at <=2% of F.j❑Does Not design air flow. ❑Not Observable ❑Not 1Programmable . Applicable . Complies40311 Pro rammablethermostats fF19] installed __ _._._... _.,___ ........ for control of primary ❑Daes Not heating and cooling systems and initially set by manufacturer to ❑Nat Observable code specifications ❑Not Applicable 4p3.1.2 Heat pump thermostat installed_.. „ � � _.._....... _ _, ........ ❑Complies [FI1012 on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable 03,5,1 Circulating service not water ❑Complies [1`1112 systems have automatic or (❑Does Not accessible manual controls. (❑Not Observable ❑Not Applicable 1 �( j High Impact(Tier 1) 2 I Medium Impact(Tier 2)„ 'f 3 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 11/03/17 Data filename: C:\llsers\lrobision\Desktop\1280 rescheck.rck Page 8 of10 an' gift c� Pros!InspectionProvisions i i F� 6a rEfi( M Complies? Comments/Assumptions � ........ ._ .. 4tf 41 "All mechanical ventilation system , ❑Complies 02512 ;fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy �r�! '❑Not Observable and air flow limits. " []Not Applicable _._._...... 4t)3:2 Hot water boilers supplying heat ❑Complies [F)212 through one-or two-pipe heating ❑Does Not systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor , ❑Not Applicable temperature. 403,5,1.1 Heated water circulation systems ❑Complies [Ft2812 have a circulation pump.The �� ❑Does Not :system return pipe is a dedicated 'return pipe or a cold water supply ❑Not Observable pipe. Gravity and thermos- ❑Not Applicable syphon circulation systems are not present. Controls for circulating hot water system Pumps start the pump with signal ;for hot water demand within the occupancy. Controls automatically turn off the pump ' ' 'when water is in circulation loop is at set-point temperature and no demand for hot water exists. _.,._.,_._..._.. ............... _.. _----- _ ..._............. 403. .1.2 :Electric heat trace systems ❑Complies [F12 ) comply with IEEE 515.1 or UL ❑does Not 515. Controls automatically adjust the energy input to the ❑Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 4035.2 Water distribution systems that ❑Complies IF13012 have recirculation pumps that ❑Daes Not pump water from a heated water ;supply pipe back to the heated ❑Not Observable water source through a cold ❑Nat Applicable water supply pipe have a demand recirculation water ' system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 1049F _,............ _......... ........................ j 4015,4 Drain water heat recovery units ❑Complies [F1332 tested in accordance with CSA ❑Does Not 855.1. Potable water-side pressure loss of drain water heat ❑Not Observable recovery units < 3 psi for ,� �� ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units { 2 psi for individual units connected to three or more showers. _ww ...,. �._._._.. .................... � � d (404.1 75%of lamps in permanent ❑Complies 1[F1611 fixtures or 75%of permanent , ❑Does Not fixtures have high efficacylamps. lam 1 Does not apply ga low-voltage /' ❑Nat Observable .... .. Not Applicablelighting_... ---__ ........4041.1 Fuel gas lighting systems have ❑Complies [F12313 no continuous pilot light. ❑Daes Not j ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 rrLow Impact(Tier,3) Project Title: Foothills Builders Report date: 11/03/17 Data filenarne: C:\Users\lrobision\Desktop\1280 rescheck.rck Page 9 of10 tlor Plansracer ed 8r� iel Final Inspection Provisions Value Val Com a aes ants/Assumptions __.w.._ Ct .3 Compliance certificate posted. �� ❑Complies [F17]2 ❑Does Not f ;❑Not Observable y �11�rr ❑Not Applicable .............. ... .......... ..........._._......., _.,__..,._....._ ...,.......,_ ..._,.......__,__, ram w.w.ww>;-� � � In NM' ..._......_.__._..__..,.._._._...._ __._:._.....,__,,,_,.._....._ ......_...___._.,.,....__._ .,,..........,..,. wtw�hSn hyy/��///Hnv»mhNn 30 .3 Manufacturer manuals for �� �� ❑Complies [FI1'8JI mechanical and water heating ��'��/% ❑Does Not systems have been provided. F❑Not Observable `❑Not Applicable Additional Comments/Assumptions: l High Impact(Tier 1) Medium Impact(Tier 2) how Impact(Tier 3) Project Title: Foothills Builders Report date: 11/03/17 Data filename: C:\Users\lrobision\Desktop\1280 rescheck.rck Page 10 of10 2015 IECC Energy Eff wiciency Certif i6cate MCMMMOMMOMMIC230M Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Window 0.29 Door 0.20 Heating System: Cooling System: Water Heater: Name: Date: Comments