Loading...
Signed Inspection Worksheet (03-08-2018) IIII IIIIIIIIIIIIIIIIII IIII IIII IIIIIIIIII III IIIIIII I IIII IIIIIIIIIIIII IIIIIIIIII IIIIII IIIIII III IIII IIII IIIIIII IIIIIII IIII II III�I Town of Queensbury-Building and Codes-Fire Marshal 742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal Case Number: RC-000718-2017 Case Module: Permit Inspection Date: 03/08/2018 Inspection Status: Partial Pass Inspector: John O'Brien Inspection Type: Septic Job Address: 74 JOHN CLENDON RD Parcel Number: 295.15-2-7 Queensbury, NY 12804 Contact Type Company Name Name Contractor [FOOTHILLS BUILDERS, LLC] Applicant [FOOTHILLS BUILDERS, LLC] Primary Owner [FOOTHILLS BUILDERS, LLC] Granted Permission [FOOTHILLS BUILDERS, LLC] Checklist Item Passed Comments Building Inspector Notes NO 3/7/18 Septic System Not Approved-Not completed. Received call from engineer Tom Center to reinspect tomorrow morning. Scheduled for 9:00- 11:00 am. 3/8/18 Septic System Partial Approval Remaining Items: -Submit Engineer?s Field Inspection Report&Septic As-Built Soil Type: Sand YES Type of Water: Municipal/Well Water YES Municipal Waterline separation distance YES Absorbtion Fields:Total Length YES 200? Septic system field above flood plain YES Length of Each Trench YES 5640? Depth of Trenches YES 10 24? Size of Stone YES #2 Building to Tank YES 4?sch40 p v c Tank to Distribution Box YES 4?pvc Distribution box to Field/Pit YES 4?pvc to 4?p v c perforated Opening Sealed: YES End Cap YES Inil etOutlet Pipes&Baffles YES Manholes 12 or less below grade YES Locations/Separations YES Foundation to Tank YES 10? Foundation to Absorption YES 20?off edge of scapewell Conforms as per Plot Plan NO Mar 08,2018 Page(13) IIII IIIIIIIIIIIIIIIIII IIII IIII IIIIIIIIII III IIIIIII I IIII IIIIIIIIIIIII IIIIIIIIII IIIIII IIIIII III IIII IIII IIIIIII IIIIIII IIII II III�I Checklist Item Passed Comments Engineer Report and As-Built NO 3/7/18 Septic System Not Approved-Not completed. Received call from engineer Tom Center to reinspect tomorrow morning. Scheduled for 9:00- 11:00 am. 3/8/18 Septic System Partial Approval Remaining Items: -Submit Engineer?s Field Inspection Report&Septic As-Built Location of system on property YES Rear left side System Use Status NO 3/7/18 Septic System Not Approved-Not completed. Received call from engineer Tom Center to reinspect tomorrow morning. Scheduled for 9:00- 11:00 am. 3/8/18 Septic System Partial Approval Remaining Items: -Submit Engineer?s Field Inspection Report&Septic As-Built O'Brien,John(Inspector) Mar 08,2018 Page(14)