Loading...
Signed Inspection Worksheet (03-07-2018) (2) IIII IIIIIIIIIIIIIIIIII IIII IIII IIIIIIIIII III IIII III I IIII IIIIIIIIIIIII IIIIIIIIII IIIIII IIIIII III IIII III III IIIIIII IIII II III�I IIIIIIIU U I UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU Town of Queensbury-Building and Codes-Fire Marshal 742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal Case Number: RC-000718-2017 Case Module: Permit Inspection Date: 03/07/2018 Inspection Status: Failed Inspector: John O'Brien Inspection Type: Septic Job Address: 74 JOHN CLENDON RD Parcel Number: 295.15-2-7 Queensbury, NY 12804 Contact Type Company Name Name Granted Permission [FOOTHILLS BUILDERS, LLC] Primary Owner [FOOTHILLS BUILDERS, LLC] Applicant [FOOTHILLS BUILDERS, LLC] Contractor [FOOTHILLS BUILDERS, LLC] Checklist Item Passed Comments Building Inspector Notes NO 3/7/18 Septic System Not Approved-Not completed. Received call from engineer Tom Center to reinspect tomorrow morning. Scheduled for 9:00- 11:00 am. Public Sewer Sign-Off NO Soil Type: Sand NO Soil Type: Loam NO Soil Type: Clay NO Type of Water: Municipal/Well Water NO Waterline separation distance NO Well separation distance NO Well Casing Lengt: 50ft Absorbtion Fields:Total Length NO Septic system field above flood plain NO Septic tanks&p u m p station anchored in flood zone NO Length of Each Trench NO Depth of Trenches NO Size of Stone NO Seepage Pits: Number NO Size: NO Stone Size: NO Building to Tank NO Tank to Distribution Box NO Distribution box to Field/Pit NO Opening Sealed: NO End Cap NO Inil etOutlet Pipes&Baffles NO Manholes 12 or less below grade NO [Provide extension collar if Yes] NO Locations/Separations NO Foundation to Tank NO Mar 07,2018 Page(13) IIII IIIIIIIIIIIIIIIIII IIII IIII IIIIIIIIII III IIII III I IIII IIIIIIIIIIIII IIIIIIIIII IIIIII IIIIII III IIII III III IIIIIII IIII II III�I IIIIIIIU U I UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU Checklist Item Passed Comments Foundation to Absorption NO Separation of Pits NO Conforms as per Plot Plan NO Engineer Report and As-Built NO ETU Maintenance Contract provided NO Location of system on property NO System Use Status NO O'Brien,John(Inspector) Mar 07,2018 Page(14)