Loading...
IM Inspection Worksheet_18-12-2023_13-58-25INSPECTION WORKSHEET (FRM-029426-2023) RC-0676-2023Case Number:Case Module:Permit Management 12/18/2023 Partial PassInspection Status:Inspection Date: Building FramingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:2 Amethyst Dr Queensbury, NY 12804 308.14-1-25 Company Name NameContact Type Applicant Jim Troelstra Granted Permission Jim Troelstra Primary Owner Jim Troelstra Checklist Item CommentsPassed Building Inspector Notes False Insulation under bow & bay window(s)False Air Seal all Plates and Sills False Joist hangers False Exterior wall outlets sealed False 20 in. (W)False Draft stopping 1,000 sq. ft. floor trusses False 5.0 sf grade False Design Professional Sign-off, if required False 24 in. (H)False Air Seal All Registers at Floor False <4:12 pitch double layer of ice/snow underlayment False Anchor Bolts 6 ft. or less on center False Ice and water shield 24 inches from wall True for ice and water barrier only 12/18/23 Bath fans connected to exterior vent False 12 O.C.False Air Sealing all Joints Before Insulation False Notches Holes Bearing Walls False 5.7 sf above below grade False >1000 s.f. then firestop must be installed False Truss Specification Provided False Windows Habitable Space Bedrooms False Metal Strapping for Notches Top Plate False Bracing Bridging False Garage portal framing False Deck (post beam connections hex head bolts)False Jack Studs Headers False Jack Posts Main Beams False Attic Access 22 x 30 minimum False Soffits-Insulation Baffel False Exterior sheeting nailed properly False Hurricane Clips/Uplift Screws/Nail Holes Filled False December 18, 2023 Page 1 of 2 INSPECTION WORKSHEET (FRM-029426-2023) Checklist Item CommentsPassed Permit Card Visible From Road False Framing False Headroom 6 ft. 8 in.False December 18, 2023 Page 2 of 2