Loading...
IM Inspection Worksheet_20-12-2023_14-55-49INSPECTION WORKSHEET (PTI-029419-2023) PT-0403-2022Case Number:Case Module:Permit Management 12/20/2023 PassedInspection Status:Inspection Date: Property Transfer InspectionsInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:80 Rockhurst Rd Queensbury, NY 12804 227.13-2-42 Company Name NameContact Type Agent Rucinski Hall Architecture Primary Owner Joseph Sheehan Checklist Item CommentsPassed Watertight True Building Inspector Notes False 5/31/23 home is still under rehabilitation and rough plumbing has not been completed / inspected. Main line was verified for flow into first of 3 holding tanks, via of pouring water into main line. House plumbing must be completed as to test each fixture for flow into the first holding tank.Last tank in line, I was able to verify floats and water shut off, but not the operation of alarms or water shut off (solenoid) Operation of floats / alarm / and water shut off verified 12/20/23 Weather/lack of information/inaccessibility False Holding tank (if yes, include capacity)True (3) 1500 gallon System/components indicate unacceptable False Is there a high water alarm?True Yes Concrete tank True Temperature (Fahrenheit)True 75+ Plumbing fixtures tested & confirmed True Via at drain lines Holding Tank:verify level rises; cap. w/in 250 gal True System appears undersized/undersized components False Verify 50% & 90% floats True Tank cover True Steel manhole (traffic rated) System appears to have functioned adequately True System passes all function testing True property transfer completed / all fixtures verified for flow to holding tanks with testing of floats / alarm and water shut off Evidence of prolonged high liquid level False Access riser? (if yes, depth to cover)True Steel manhole Inlet baffle True No treatment tank/other critical component(s)False As-built provided is accurate False for new holding tanks Test each fixture flow to septic tank True No / DWV and supply not completed - 12/20/23 flow test of fixtures completed On-site as-built req'd before insp is complete True Are both switch and alarm operable?True Newly installed, main panel box not completed. In order for a certificate of occupancy, all parts of the system will have to be verified of operation. All verified 12/20/23 Outlet baffle False December 20, 2023 Page 1 of 2 INSPECTION WORKSHEET (PTI-029419-2023) Checklist Item CommentsPassed Weather True Sunny Are there any obvious electrical shortcomings?False December 20, 2023 Page 2 of 2