Loading...
IM Inspection Worksheet_20-12-2023_14-56-35INSPECTION WORKSHEET (RPLUM-029527-2023) RC-0559-2022Case Number:Case Module:Permit Management 12/20/2023 Partial PassInspection Status:Inspection Date: Rough PlumbingInspection Type:Inspector:Mark Smith Job Address:Parcel Number:108 Lake Pkwy Lake George, NY 12845 226.15-1-16 Company Name NameContact Type Applicant Nicholas Falco Contractor Witt Construction, Inc. Engineer Valley Engineering Granted Permission West Point South LLC Primary Owner West Point South LLC Checklist Item CommentsPassed Building Inspector Notes True 5/8/23 partial approval for rough plumbing - plumbing under slab approved. 12/20/23 partial approval for rough plumbing. - Plumbing for domestic water supply approved. - Sanitary drains and vents approved. Pressure Test True Pressure Test True 3" Vent Through Roof - 18" min True Washing Machine Drain 2 inch minimum True All Return Air Hard Duct Work False 5 psi or 10 ft. above highest conn. for 15 minutes True 5 psi for 15 minutes Rough Plumbing / Nail Plates True Duct Testing Outside Conditioned Space False Shower liner test (2" of water)False Water Supply Piping True Duct Insulation - if required in unheated spaces False Duct work sealed properly False Cleanout every 100 feet change of direction True Plumbing Vent Vents in Place True Air Test Gas Piping 10 psi for 10 Minutes False Washing Machine Trap: 18"-42" discharge True Air Head True 50 PSI for 15 minutes Air Head True 50 P.S.I for 15 minutes True 1 ½ inch minimum Drain Size True Drain Vent True Permit Card Visible From Road True December 20, 2023 Page 1 of 1