IM Inspection Worksheet_20-12-2023_14-56-35INSPECTION WORKSHEET (RPLUM-029527-2023)
RC-0559-2022Case Number:Case Module:Permit Management
12/20/2023 Partial PassInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:108 Lake Pkwy
Lake George, NY 12845
226.15-1-16
Company Name NameContact Type
Applicant Nicholas Falco
Contractor Witt Construction, Inc.
Engineer Valley Engineering
Granted Permission West Point South LLC
Primary Owner West Point South LLC
Checklist Item CommentsPassed
Building Inspector Notes True 5/8/23 partial approval for rough plumbing
- plumbing under slab approved.
12/20/23 partial approval for rough plumbing.
- Plumbing for domestic water supply approved.
- Sanitary drains and vents approved.
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min True
Washing Machine Drain 2 inch minimum True
All Return Air Hard Duct Work False
5 psi or 10 ft. above highest conn. for 15 minutes True 5 psi for 15 minutes
Rough Plumbing / Nail Plates True
Duct Testing Outside Conditioned Space False
Shower liner test (2" of water)False
Water Supply Piping True
Duct Insulation - if required in unheated spaces False
Duct work sealed properly False
Cleanout every 100 feet change of direction True
Plumbing Vent Vents in Place True
Air Test Gas Piping 10 psi for 10 Minutes False
Washing Machine Trap: 18"-42" discharge True
Air Head True 50 PSI for 15 minutes
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size True
Drain Vent True
Permit Card Visible From Road True
December 20, 2023 Page 1 of 1