IM Inspection Worksheet_22-01-2024_08-48-31INSPECTION WORKSHEET (RESFINAL-000317-2024)
RC-0360-2022Case Number:Case Module:Permit Management
01/22/2024 PassedInspection Status:Inspection Date:
Residential Final InspectionInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:373 West Mountain Rd
Queensbury, NY 12804
308.9-1-11
Company Name NameContact Type
Applicant Mark Reichen
Contractor Fine Home Building
Granted Permission Jessalie Reichen
Primary Owner Jessalie Reichen
Mark Reichen
Checklist Item CommentsPassed
bedroom(s) with gas appliances False N/A
Low flow toilet 1.3 gal/flushing cycle True
Bathroom Fans, if no window True
3" Plumbing Vent through roof minimum 18 inch True
Grade away from foundation: 6" down, 10' out False winter conditions
Final Survey Plot Plan True Provide final survey / received 1/19/24
Window guards req:<2' above floor/6' above grade False at grade
Interior privacy/trim/doors/main entrance 36 True
Backflow Preventors where required True
Basement wall insulation R- value verified True
Emergency egress below grade True
Intake Openings True
Safety glazing: w/in 5' of tub/shower True
Site Plan / Variance required False
Seals on Garage Doors, esp. Wood True
Not less than 3' horiz from opening of bthrn False
Basement ceiling covered 2x8 fl joist or less True
Attic Access Insulation = Attic R- Value False insulated door to cold storage
Gas Shut-off Exposed & Regulator 12" min abv grd False LP
Fireblocking at fl joist 80 s.f. or less False
Garage Floor Pitched True
Inter Connected True
Arc Fault Breaker Habitable Spaces True
Energy Sticker on Elec. Panel:R-Val. & Heating Sys True
Furnace/Hot Water Heater operating True
Hot water drain pan to indirect waste False N/A
Fresh Air Intake True
Basement stairs closed rise greater than 4 inches True
Foam in basement/attics covered w/thermal barrier True
Outside every bedroom area True
January 22, 2024 Page 1 of 3
INSPECTION WORKSHEET (RESFINAL-000317-2024)
Checklist Item CommentsPassed
Blower Door Test Certification True
Fin Elect; Energy Saving Light Bulbs 90 Percent True
Heat detector in garage True
Gas Log In Sealed or Glass Enclosure True
OK to Issue C/O True OK to issue C/O upon approval of final survey received final survey
Truss ID Signage Installed at Electrical Meter True
Range Hood 400+ cfm-Fresh Air REQUIRED True
4 inch Building Number Address visible from road True
HVAC Vent Terminal 10' from Lot Line & Openings True
Attic Access Gasketed True
Jack posts in basement lagged at top and bottom True
Guard at deck, porches 36" or more False N/A
6" clearance to sill plate True
5/8" Type X with Living Space Above False
Propane Tank: Proper Setback from Prop Line/Struct True
20 Minute Fire Door/Self-Closing Hardware True
Every level, Every bedroom True
Furnace shut-off w/in 30 ft. or w/in line of site True
Chimney Height / B Vent / Direct Vent Location True
Floor truss, draft stop- fin base 1,000 sq. ft.False TJI's sheet rock in between slats
within 10' of all sleeping areas True
on all levels w/gas appliances (i.e. furnace)True
Relief Valve ,Heat Trap/Water Temp 110 deg or less True
Fresh air supply 3' from grade True
Carbon Monoxide Detectors:True
Handrail 4 or more risers True
HRV or ERV Installed per Bedroom Requirements True
1/2" Gypsum or House Wall and Gable True
Attic Access 22 x 30 minimum True
Plumbing fixtures True
As Built Septic System True
Flex Gas Pipe Bonding True
Bathroom / Kitchen Watertight True
Duct work sealed properly True
Roof Complete / Exterior Finish Complete True
Smoke Detectors:True
1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. Truss True
Basement Egress: 5s.f. window w/sill or Bilco door True
Guard at stairwell at 34" or more True
Battery backup True
Low water shut-off boiler False
Foundation insulation to floor True ICF's
January 22, 2024 Page 2 of 3
INSPECTION WORKSHEET (RESFINAL-000317-2024)
Checklist Item CommentsPassed
General Comments False
Interior/Exterior Railings 34 to 38 True
Electronic as-builts False
Encl. Stairs Sheetrock Underside minimum ½ Gypsum False
All Hot Water Systems: 3/4" or larger piping R-3 True
Handrail Termination at Newell Post or Wall True
Outside Spigots have Air Gap True
Guards at stairs,decks,patios 30" + above grade False N/A
January 22, 2024 Page 3 of 3