Loading...
IM Inspection Worksheet_22-01-2024_08-48-31INSPECTION WORKSHEET (RESFINAL-000317-2024) RC-0360-2022Case Number:Case Module:Permit Management 01/22/2024 PassedInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:373 West Mountain Rd Queensbury, NY 12804 308.9-1-11 Company Name NameContact Type Applicant Mark Reichen Contractor Fine Home Building Granted Permission Jessalie Reichen Primary Owner Jessalie Reichen Mark Reichen Checklist Item CommentsPassed bedroom(s) with gas appliances False N/A Low flow toilet 1.3 gal/flushing cycle True Bathroom Fans, if no window True 3" Plumbing Vent through roof minimum 18 inch True Grade away from foundation: 6" down, 10' out False winter conditions Final Survey Plot Plan True Provide final survey / received 1/19/24 Window guards req:<2' above floor/6' above grade False at grade Interior privacy/trim/doors/main entrance 36 True Backflow Preventors where required True Basement wall insulation R- value verified True Emergency egress below grade True Intake Openings True Safety glazing: w/in 5' of tub/shower True Site Plan / Variance required False Seals on Garage Doors, esp. Wood True Not less than 3' horiz from opening of bthrn False Basement ceiling covered 2x8 fl joist or less True Attic Access Insulation = Attic R- Value False insulated door to cold storage Gas Shut-off Exposed & Regulator 12" min abv grd False LP Fireblocking at fl joist 80 s.f. or less False Garage Floor Pitched True Inter Connected True Arc Fault Breaker Habitable Spaces True Energy Sticker on Elec. Panel:R-Val. & Heating Sys True Furnace/Hot Water Heater operating True Hot water drain pan to indirect waste False N/A Fresh Air Intake True Basement stairs closed rise greater than 4 inches True Foam in basement/attics covered w/thermal barrier True Outside every bedroom area True January 22, 2024 Page 1 of 3 INSPECTION WORKSHEET (RESFINAL-000317-2024) Checklist Item CommentsPassed Blower Door Test Certification True Fin Elect; Energy Saving Light Bulbs 90 Percent True Heat detector in garage True Gas Log In Sealed or Glass Enclosure True OK to Issue C/O True OK to issue C/O upon approval of final survey received final survey Truss ID Signage Installed at Electrical Meter True Range Hood 400+ cfm-Fresh Air REQUIRED True 4 inch Building Number Address visible from road True HVAC Vent Terminal 10' from Lot Line & Openings True Attic Access Gasketed True Jack posts in basement lagged at top and bottom True Guard at deck, porches 36" or more False N/A 6" clearance to sill plate True 5/8" Type X with Living Space Above False Propane Tank: Proper Setback from Prop Line/Struct True 20 Minute Fire Door/Self-Closing Hardware True Every level, Every bedroom True Furnace shut-off w/in 30 ft. or w/in line of site True Chimney Height / B Vent / Direct Vent Location True Floor truss, draft stop- fin base 1,000 sq. ft.False TJI's sheet rock in between slats within 10' of all sleeping areas True on all levels w/gas appliances (i.e. furnace)True Relief Valve ,Heat Trap/Water Temp 110 deg or less True Fresh air supply 3' from grade True Carbon Monoxide Detectors:True Handrail 4 or more risers True HRV or ERV Installed per Bedroom Requirements True 1/2" Gypsum or House Wall and Gable True Attic Access 22 x 30 minimum True Plumbing fixtures True As Built Septic System True Flex Gas Pipe Bonding True Bathroom / Kitchen Watertight True Duct work sealed properly True Roof Complete / Exterior Finish Complete True Smoke Detectors:True 1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. Truss True Basement Egress: 5s.f. window w/sill or Bilco door True Guard at stairwell at 34" or more True Battery backup True Low water shut-off boiler False Foundation insulation to floor True ICF's January 22, 2024 Page 2 of 3 INSPECTION WORKSHEET (RESFINAL-000317-2024) Checklist Item CommentsPassed General Comments False Interior/Exterior Railings 34 to 38 True Electronic as-builts False Encl. Stairs Sheetrock Underside minimum ½ Gypsum False All Hot Water Systems: 3/4" or larger piping R-3 True Handrail Termination at Newell Post or Wall True Outside Spigots have Air Gap True Guards at stairs,decks,patios 30" + above grade False N/A January 22, 2024 Page 3 of 3