Loading...
IM Inspection Worksheet_24-01-2024_14-34-05INSPECTION WORKSHEET (BINS-000399-2024) CC-0273-2021Case Number:Case Module:Permit Management 01/24/2024 Partial PassInspection Status:Inspection Date: Building InsulationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:39 Longview Dr Queensbury, NY 12804 296.8-1-3 Company Name NameContact Type Applicant Richard E. Jones Associates Architect Richard E. Jones Associates Contractor Sano Rubin Granted Permission The Glen @ Hiland Meadows Memory CareNick Norton Sano Rubin Primary Owner The Glen @ Hiland Meadows Memory CareNick Norton Checklist Item CommentsPassed January 24, 2024 Page 1 of 4 INSPECTION WORKSHEET (BINS-000399-2024) Checklist Item CommentsPassed Building Inspector Notes False 6/15/22 partial approval for insulation - rock wool sound insulation at 2 hour fire wall, second floor only verified. Ok to install plywood at second floor only - R 23 rock wool insulation verified at south stairwell at the T. Under stair platform only, ok to Sheetrock this area only 6/20/22 partial approval for insulation - rock wool sound insulation at 2 hour fire wall first floor verified, ok to install plywood. - rock wool in concealed areas that are double walls verified in unit L, unit H, unit G, and unit J. Ok to sheet rock these areas only. 6/30/22 partial approval for insulation - proper vent verified at main corridor north side only ( mechanical room not completed) 7/7/22 partial approval for insulation - R 38 insulation at second floor ceilings verified to the T intersection. South side of T left open to verify proper vent. A second layer of R 23 to be installed -Rockwool sound insulation verified at shower stalls from existing building to fire wall, first and second floor. 7/26/22 partial approval for insulation - thermal and sound insulation verified at rooms 206 thru 211 - R 38 with R 23 rock wool in ceilings with poly. - R 23 rock wool with poly at exterior walls. - interior walls cavities filled with rock wool as required. 8/2/22 Building Insulation Partial Approval - West Wing Only 2nd floor - Ok to cover R38 unfaced fiberglass ceiling insulation where complete with R23 mineral wool insulation. - Proper Vent approved at West Wing 2nd floor. 8/8/22 partial approval for insulation - rooms 251, 250, and 249 insulation approved for ceilings only, R38 with R 23 8/15/22 partial approval for insulation - Room 252 insulation in ceilings approved, R 38 with R 23 rock wool and poly. 8/25/22 partial approval for insulation - thermal insulation at exterior walls only, first floor rooms 107, 109, 111, 113, 115, 149, 150, 151, 152. R 23 rockwool in stud cavities and thru box beam with poly vapor barrier. 8/26/22 partial approval for insulation - thermal insulation at exterior walls verified. First floor rooms 106, 108, 110, 112, 114 Room 114 has a sliding glass door that in not installed. - the walls at the north and south stair wells first floor lever insulation verified. - sound insulation at rooms 249, 250, 251, 252 verified 8/30/22 partial approval for insulation - sound insulation at ceilings only, rooms 106, 107, 108, & 109 verified January 24, 2024 Page 2 of 4 INSPECTION WORKSHEET (BINS-000399-2024) Checklist Item CommentsPassed 8/31/22 partial approval for insulation - insulation at second floor stairwell foyers verified at north and south stairwells 9/2/22 partial approval for insulation -thermal insulation in north and south stair wells verified. -- sound insulation at ceilings only rooms 112 and 113 verified 9/9/22 partial approval for insulation - sound insulation at interior partitions verified, rooms 106, 107 -sound insulation, ceilings only, rooms112, 113, 114 & 115 - thermal insulation with poly and sound insulation at interior walls of the two storage room at the end of the corridor verified 9/13/22 partial approval for insulation - sound insulation at interior walls verified, rooms 108 & 109 9/20/22 partial approval for insulation - sound insulation at interior partitions verified at rooms 110, 111, 112, & 113. Ok to Sheetrock 9/27/22 partial approval for insulation - sound insulation at interior partitions verified rooms 149, 150, 151, & 152, ok to sheet 10/4/22 partial approval for insulation - thermal and sound insulation verified at store room at east end of building. 11/2/22 partial approval for insulation - insulation at truss cord roof detail 3 - 204 page A 204 of approved plans verified R 23 rock wool. 11/4/22 partial approval for insulation - insulation at mezzanine gable verified, rock wool R 23 11/14/22 Building Insulation Partial Approval - Ceiling insulation installed in rooms W110, W111, W113 and W106 okay to sheetrock. Call for reinspection of balance of ceiling insulation tomorrow by Mark Smith. Ceiling Insulation R38 fiberglass and R24 mineral wool with poly vapor barrier. 11/15/22 partial approval for insulation at wellness center - insulation at areas with flat roof verified, R 38 with R 24 rock wool in joist cavities brought out one bay or 16" past flat roof. - vapor barrier verified at area of flat roof. 12/21/22 partial approval for insulation at wellness center - thermal insulation at exterior walls verified, R 23 rockwool - sound insulation at interior walls verified. 12/6/23 partial approval for insulation - R23 rock wool insulation at gables and at truss cavities at eves verified at well ness center. 1/24/24 partial approval for insulation. -Poly vapor barrier at wellness center, pool ceiling verified. U Factors = .3 cfm for windows, .5 cfm for doors True .29 Insulation under bow & bay window(s)False January 24, 2024 Page 3 of 4 INSPECTION WORKSHEET (BINS-000399-2024) Checklist Item CommentsPassed Tub Shower R-20 with Vapor Barrier False Air Seal all Plates and Sills False Exterior wall outlets sealed False All Return Air Hard Duct Work False Duct work sealed properly / No duct tape True Duct Testing Outside Conditioned Space False Air Seal All Registers at Floor False House Wrap Taped at all Seams True Air Sealing all Joints Before Insulation True Door / Window Sealed (No Insulation)True Air Seal Outside Penetrations False All Ductwork Sealed Return and Supply False Air Barrier behind Knee Walls False Blower Door Test False Duct Insulation - if required in unheated spaces False 15 min thermal barrier/intumescent paint applied False Tyvek or Similar Exterior Sealant True Combustion Air Supply for Furnace False Fresh air supply 3' from grade False Window Sealing True Duct Blaster Test for duct work, R-8, unhtd spaces False Permit Card Visible From Road False Proper Vent, Attic Vent True 8/2/22 Building Insulation Partial Approval - West Wing Only 2nd floor - Ok to cover R38 unfaced fiberglass ceiling insulation where complete with R23 mineral wool insulation. - Proper Vent approved at West Wing 2nd floor. Insulation ResCheck ComCheck True 8/2/22 Building Insulation Partial Approval - West Wing Only 2nd floor - Ok to cover R38 unfaced fiberglass ceiling insulation where complete with R23 mineral wool insulation. - Proper Vent approved at West Wing 2nd floor. 8/8/22 partial approval for insulation - rooms 251, 250, and 249 insulation approved for ceilings only, R38 with R 23 8/15/22 partial approval for insulation - Room 252 insulation in ceilings approved, R 38 with R 23 rock wool and poly. 11/14/22 Building Insulation Partial Approval - Ceiling insulation installed in rooms W110, W111, W113 and W106 okay to sheetrock. Call for reinspection of balance of ceiling insulation tomorrow by Mark Smith. Ceiling Insulation R38 fiberglass and R24 mineral wool with poly vapor barrier. January 24, 2024 Page 4 of 4