Loading...
Rist-Frost Sept. 19, 1990+r `&NFEIr ARCHITECTS SURVEYORS OST OFFICE 13OX 838 21 RAY STREET GLFNS FALLS NY 12801 FAX 518 • 793-4146 518 • 793-4141 fIJ, 1 R, ci 4NhSIM1':. r..laaf �r.RATI T "A'' Town of Queensbury Office Building Bay and Haviland Roads Queensbury, NY 12804 Attention: Mrs. Lee York, Sr. Planner Re: Madison/Diamantis - Subdivision 9-1990 Sketch Plan Dear Mrs. York: September 17, 1990 RFA #89-5000.509 RC 90 We have reviewed the project and have the following engineering comments: 1. Lot 1 grading should divert any surface flow away from the location of the existing well. 2. Lot 1 driveway culvert sizing calculations should be submitted. 3. Regarding sewage disposal for lots 1 and 2: a. Effluent pumping will be necessary to utilize fill systems. b. Ten (10) feet of horizontal separation must be maintained between the limits of the absorption field fill area and property lines. C. Absorption field size must be finalized based on the stabilized fill perc test results. Very truly yours, RISI-FROST ASS O )ATES, P.C. ;1,..� Thomas M. Yarmowich, P.E.' Managing Project,Engineer TMY/cam 0 LACONIA, NH