Loading...
Staff Notes Town of Queensbury Planning Board Community Development Department Staff Notes October 22, 2013 Application: SP 58-2013 SEORA Unlisted Applicant: David Kenny Referrals: Warren Co. Planning Location: 1468 State Route 9 Town Engineer Zoning: CI-Commercial Intensive REQUESTED ACTION: Site improvements / building modifications require review by the Planning Board PARCEL HISTORY: SP 13-11: Demolition of existing mall [Reebok Outlet] and construction of a new 55,000 sq. ft. shopping center 5-19-11 BP 13-088: Commercial retail PROJECT DESCRIPTION: Applicant proposes a modification to an approved site plan for the construction of 62,967 sq. ft. outlet retail stores where building #1 is already under construction. The modification involves relocation of the remaining buildings, relocation of parking with a majority to the rear and a new access drive configuration. MATERIAL REVIEW: Cover Letter Application Long EAF Stormwater Management Report& Stormwater Pollution Prevention Plan Narrative Map set: SP 1 through SP 8 STAFF COMMENTS: The applicant proposes a modification to an approved site plan where a five store linear complex was proposed. The applicant now intends to construct building one as pod 1 at 9,965 sq. ft. only from the linear store complex then proposes Pod 2 attached to Pod 1 at 9,600 sq. ft., then Pod 3 attached to Pod 2 at 10,800 sq. ft.; in addition three separate retail spaces; 1st at 11,558 sq. ft, 2nd at 10,658 sq ft, and 3`d at 10,658 sq. ft.. All of the buildings will be interconnect with permeable paver courtyard area for pedestrian use. The site proposes to have 313 parking spaces located mostly to the rear of the property with one access drive roadway for entering and exiting the Outlet area. The project is phased with the northerly building being constructed as phase 1; then phase 2 will include construction of all roads and parking lots; and phase 3 will include construction of the southern three buildings and associated site work. The plans show total site disturbance is 7.4 acres, location of the structures, parking area, lighting type and footcandle distribution with a stormwater and erosion control report and SWPPP are part of the submission. SUMMARY The applicant has completed a site plan application for the proposed construction of 62,968 sq. ft. of building space with an arrangement of Pod 1-3 connected retail spaces and three separate retail space buildings with an interior courtyard. The site work involves creating a predominately rear parking area with a drive access road directing traffic to the rear of the buildings with some parking in the front. The plans will need to be revised to show the stormwater device that was addressing NYSDOT stormwater from Route 9 —previous plans showed this device and the applicant has indicated the revision as part of the final plans. The applicant has submitted a long environmental assessment form for review and completing by the Planning Board. Clarification should address phasing as the assessment form indicates a single phase and the stormwater report indicates a 3- phase project. -2 - Pam Whiting From: Craig Brown Sent: Monday, September 30, 2013 2:04 PM To: Pam Whiting; Laura Moore Subject: FW: SP 57 2013 FYI and for file From: Chris Harrington Sent: Monday, September 30, 2013 2:01 PM To: Craig Brown Cc: Rod Warrington; Sandra Jarvis Subject: SP 57-2013 Craig: I am in receipt of the above site plan.There appears to 2 distinct parcels-one that is in the sewer district, the back one is outside the sewer district. It appears that there will be structures that will be connected to the Rte. 9 Sewer District on a parcel that is not in the District. It is advised that the applicant combine the back parcel with the front parcel. I am of the understanding that this combination of the two parcels will create a parcel that will be automatically brought into the district. Unless this is done, the issuance of a sewer permit may be delayed and a Sewer District Extension may have to be applied before issuance of the wastewater permit. Chris Harrington P.E. Engineer/Director of Wastewater 1 FIRE MARSHAL'S OFFICE .. 4 Town of Queensbury v� 742 Bay Road, Queensbury, NY 12804 " Hone of Natural Beauty ... A Good Place to Live " PLAN REVIEW David Kenny SP 57-2013 9/27/2013 The following comments are based on drawings submitted: • Fire Marshal has no site issues at this time Michael J Palmer Fire Marshal 742 Bay Road Queensbury NY 12804 firemarshal @queensbury.net Fire Marshal 's Office • Phone: 518-761-8206 • Fax: 518-745-4437 firemarshal@queensbury.net • www.queensbury.net THE Gh!,11Z91 375 Bay Road, Queensbury, NY 12804 P: (518) 812-0513 F: (518) 812-2205 COMPAN I ES www.chazencompanies.com Proud to be Employee Owned Hudson Valley Office (845)454-3980 Engineers Capital District Office (518) 273-0055 Land Surveyors Planners Environmental Professionals Landscape Architects October 15, 2013 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB(aqueensbury.net Re: Kenny Shopping Center —1454 State Route 9 Town of Queensbury, Warren County, New York Chazen Project#91300.38 Queensbury Ref. No:SP 58-2013 Dear Mr. Brown: The Chazen Companies (Chazen) has received a submission package from your office for the above project. The Applicant has previously received planning board approval in 2011 and wishes to change the layout of the proposed facility as the original plan has yet to be implemented. The Applicant intends to obtain a new site plan approval for the commercial intensive area of Route 9. Submitted information includes the following: 1. Stormwater Pollution Prevention Plan Narrative prepared by NACE Engineering — Dated September 2013; 2. Site Plan Review Application, dated September 15, 2013; 3. State Environmental Quality Review Full Environmental Assessment Form, Dated September 15, 2013; 4. Site Plans and Details, SP1 through SP6 (8 Sheets), prepared by Miller Associates, and NACE Engineering, dated September 15, 2013. Your office has requested that we limit our review to the design of stormwater management and erosion and sediment control items as it relates to compliance to local, state or relevant codes and regulations. Based upon our review of the information provided, Chazen offers the following comments for the Town's consideration: Chazen Engineering, Land Surveying&Landscape Architecture Co., D.P.C. Chazen Environmental Services. Inc. The Chazen Companies, Inc. Town of Queensbury Kenny Shopping Center October 15,2013 Page 2 Stormwater Management & Erosion and Sediment Control: 1. The proposed commercial development disturbs approximately 11.4 acres of land and therefore requires the preparation of a Stormwater Pollution Prevention Plan (SWPPP) in accordance with GP-0-10-001 that includes both erosion and sediment controls and post construction stormwater management practices. In addition, per Section 179-6-080 of the Town code, stormwater drainage plans shall analyze impacts of a commercial project using at least a 50-year return interval storm. 2. The proposed plan relies heavily on the fact that a previous site approval has been issued in 2011. However, no details on the previous plan, soils information, percolation test depth, resource areas, stormwater delineations or existing conditions models have been provided. The Applicant should provide plans and reports as previously submitted and approved for reference in this application. Specifically,we request the Applicant submit HydroCAD models and separate delineated plans for existing predevelopment, and approved (2011) postdevelopment conditions for comparison (147-8 B.3.e) and all relevant data to expedite review. 3. The delineation submitted for the proposed postdevelopment condition seems to have errors in parts. The Applicant should call out critical high points on the plan as necessary. We would like to draw specific attention to the borders of areas 9 and 10, the border of areas 10 and 11 as well as the border of area 13 with the adjacent driveway for corrections. Please add a North arrow to the delineation plan. 4. The HydroCAD printout indicates design for permeable pavers allows an infiltration rate of 4 in/hour. We recommend that the Applicant provide manufacturer data confirming this value. 5. The design detail for Permeable Pavers on sheet SP7 does not conform to the state design guidance (NYDEC SWMDM 5.3.11). 6. Within the HydroCAD printout, Subcatchment 7S calls out the surface area of permeable pavers to equal 28,863 square feet. However, Pond 7P calls out the surface area of permeable pavers to equal 30,100 square feet. We expect these values should be equivalent, and ask the Applicant to clarify this discrepancy. 7. We recommend the Applicant provide calculations confirming pretreatment of 100% of the water quality volume is provided for all delineated basins prior to infiltration (NYDEC SWMDM 6.3.3). The aggregate proposed below the dry wells cannot be considered for pretreatment. Per New York State Design standards, 100% of the Water Quality Volume must be captured prior to entry into an infiltration facility. Also dry wells should only be used for roof runoff infiltration (NYDEC SWMDM 6.3.1). Therefore, in the western area of the site (front parking lot) redundant infiltration practices should be used similar to that proposed in the rear of the site. 8. The applicant has not provided overflow measures for any of the infiltration basins proposed. The design illustrates with an infiltration rate of 16 in"/hour the basins will be able to infiltrate all stormwater volumes up to the 100 year storm. The Town may wish for additional overflow measures to be provided for as directed in the NYS SWMDM should the structures become clogged. R:\9\91300-91399\91300.00-Town of Queensbury PB Engineer\91300.38-SP57.2013-David Kenny\LETTER 91300.38-SP 58-2013 David Kenny.docn Town of Queensbury Kenny Shopping Center October 15,2013 Page 3 9. The HydroCAD printout indicates that the infiltration rate was modeled across the entire wetted surface of the infiltration structures. In some cases the sides of these dry wells are constructed in fill for some depth which may not have a consistent infiltration rate. The Applicant should consider modeling the infiltration only across the horizontal surface where applicable. 10. Dry wells shall be separated a minimum of 10 feet from structures (NYDEC SWMDM 6.3.1). The space is very tight between the retail structure called out on the plan as Shoppes Pod 3 and the 10,658 SF building directly to the south. In addition, the distance between catchbasins and drywells is in many cases less than 10 feet. 11. The stormwater collection system has not been adequately detailed on the Grading and Drainage plan. Please include invert in and out information as applicable and correlate this information to the HydroCAD model as necessary. 12. Three of the proposed delineated areas (called out on the delineation plan as 9, 11 and 12) do not provide interconnection with multiple infiltration basins or perforated pipe for redundancy. We recommend additional considerations for pretreatment be considered in these areas. 13. The proposed drywells and access road on the southern border areas of the site will require an easement on the adjacent property, even if it is currently commonly owned. 14. The proposed drywells have been designed with open grates. However, the drainage area delineation submitted has not taken these grates into consideration. Providing open grates on the drywells would eliminate the possibility for pretreatment prior to infiltration. We recommend dry wells have solid covers. 15. The proposed site will be constructed largely on fill material. The Applicant is proposing dry wells for infiltration purposes across the site in areas that may have greater than 5 feet of fill for the proposed condition. Fill material is generally not suitable for infiltration BMP5 (NYDEC SWMDM 6.3.3). The depth of the standard drywells proposed in the standard detail is 8 feet and may be adequate in most cases to reach natural base. Additional geotechnical information should be sought to confirm the consistency and depth of fill across the site. The test pit information provided on sheet SP-1 indicates no water was found; however seasonal high groundwater may be evident in these test pits. We recommend more detailed test pit and percolation test data be submitted. Additional percolation tests should be carried out in the vicinity of TP-4 and TP-5 at the depth of the proposed infiltration basins as well as in the front (west) of the site where soils information is lacking. 16. The slope on the eastern end of the site is designed at roughly 33% and has been hatched on sheet SP-4. The test pit data on sheet SP-1 indicates the base material and existing fill on-site are sandy, as such these soils are likely susceptible to erosion. In addition, infiltration practices, directly adjacent to the slope may contribute to the instability of the slopes. The area has been called out for immediate stabilization in construction sequence note 10. The engineer should provide additional detail on rate of seeding and mulch application, as well as the type of mat and anchoring recommended. R:\9\91300.91399\91300.00-Town of Queensbury PB Engineer\91300.38•SP57-2013-David Kenny\LETTER_91300.38-SP 58.2013 David Kenny.docx Town of Queensbury Kenny Shopping Center October 15,2013 Page 4 17. An existing 24" storm drain pipe, serving State Route 9, is shown to conflict with the southwestern most building proposed on the site. It is mentioned on page 2 of the Stormwater management report as to be relocated, but has not been shown on the plan. We ask the Applicant include the new design alignment, invert information and outlet location with the subsequent submittal. Conclusions and Recommendations It is our opinion that there currently is not enough information to be able to complete a stormwater review. We request the Applicant provide additional information and clarification for the above items and incorporate the changes in subsequent plan submissions. If you have any questions regarding the above, please do not hesitate to contact me at(518) 824-1926. Sincerely, --W5 - Sean M. Doty, P.E., LEED AP Associate Senior Project Engineer cc: Pam Whiting,Town Planning Office Administrator(via email) Laura Moore,Town Land Use Planner(via e-mail) File R:\9\91300-91399\91300.00-Town of Queensbury PB Engineer\91300.38-SP57-2013-David Kenny\LETTER 91300.38-SP 58-2013 David Kenny.docx f TOWN OF QUEENSBURY 742 Bay Road, Queensbury, NY. 12804-5902 Town of Queensbury Planning Board SEQR RESOLUTION—APPROVE/DISAPPROVE NEGATIVE DECLARATION SITE PLAN 58-2013 DAVID KENNY TAX MAP ID 288.12-1-19, 20 The applicant proposes Applicant proposes a modification to an approved site plan for the construction of 62,967 sq. ft. outlet retail stores where building #1 is already under construction. The modification involves relocation of the remaining buildings, relocation of parking with a majority to the rear and a new access drive configuration. Site improvements / building modifications require Planning Board review and approval. The Planning Board has determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review Act; The proposed action considered by this Board is Unlisted :in:;:A he Department of Environmental Conservation Regulations implementing the State Environm :.Quality Review Act and the regulations of the Town of Queensbury; �. V4ti.. No Federal or other agencies are involved; Part 1 of the Long EAF has been completed by the applicant Part 2 of the Long EAF (Questions 1-20)has been reviewed by the Planning Board; Upon review of the information recorded on this EAF, it is the conclusion of the Town of Queensbury Planning Board as lead agency that this project will result in no significant adverse impacts on the environment, and, therefore, an environmental statement need not be prepared. Accordingly, this negative declaration is issued. MOTION TO APPROVE / DISAPPROVE A NEGATIVE DECLARATION FOR SITE PLAN 58-2013 DAVID KENNY,Introduced by who moved for its adoption, seconded by As per the resolution prepared by staff. Duly adopted this 15th day of October 2013 by the following vote: AYES: NOES: Cc: Nace Engineering TOWN OF QUEENSBURY s 742 Bay Road, Queensbury, NY. 12804-5902 t-ry Town of Queensbury Planning Board RESOLUTION TO APPROVE/ DISAPPROVE SITE PLAN 57-2013 DAVID KENNY TAX MAP ID 288.12-1-19,20/ PROPERTY ADDRESS: 1468 STATE ROUTE 9 A site plan application has been made to the Queensbury Planning Board for the following: Applicant proposes a modification to an approved site plan for the construction of 62,967 sq. ft. outlet retail stores where building#1 is already under construction. The modification involves relocation of the remaining buildings, relocation of parking with a majority to the rear and a new access drive configuration. Site improvements / building modifications require Planning Board review and approval. A public hearing was advertised and held on 10-22-2013; This application is supported with all documentation, public comment, and application material in the file of record; MOTION TO APPROVE / DISAPPROVE SITE PLAN 57-2013 DAVID KENNY,_Introduced by who moved for its adoption, seconded by 1) Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; 2) The requirements of the State Environmental Quality Review Act have been considered and the Planning Board has adopted a SEQRA Negative/Positive Declaration; 3) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff; 4) The Sanitary Sewer connection plan must be submitted to.the Wastewater Department for its review, approval,permitting and inspection; 5) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; 6) Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; 7) If required, the applicant must submit a copy of the following to the Town: a) The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity" prior to the start of any site work. b) The project NOT(Notice of Termination)upon completion of the project; 8) The applicant must maintain on their project site,for review by staff: a) The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP(Storm Water Pollution Prevention Plan)when such a plan was prepared and approved; b) The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project. 9) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel. 10) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work. 11) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution 4*'```'' :\ r: 12) As-built plans to certify that the site plan is developed according to the app A gti. .s,,;, s to be provided prior to issuance of the certificate of occupancy. . \r,,,:v.,...:..w Duly adopted this 22nd day of October 2013 by the following vote: AYES: 4.4441\* L NOES: *f .. '�• cc: Nace Engineering .'; v',z� L� y4, ti:1 :::.,..• "...-\ {:}a::: L..,ti'y ..;.,LL `y ,...tt,„ ..„."..„:,.. • . . . . . ‘ \W:....›. , .. . :S 3.,.„ .: , ,,,,,..-...:,::::* :„, .:: :::::::: .,..,,.::.... „....„ ti:: ....., .„. ......:,,,,..:.. ...,:, :,..,.:.. ..::::: x:..-tii:.;:::::.,::::: ..: ::::„..... ,...,..r. „.. ..