Loading...
Agenda Queensbury Planning Board Agenda (aw First Regular Meeting: Tuesday November 19, 2013/Time 7—11 PM Queensbury Activities Center @ 742 Bay Road 1.0 Approval of Minutes 1.1 Dates-September 17, September 24, 2013 2.0 Administrative Items Site Plan 42-2012 Daniel &Ellen Nichols—For further tabling consideration Site Plan 78-2012 Jeffrey Schwartz—For further tabling consideration Subdivision 8-2012 Cerrone Builders—Resolution to Seek Lead Agency Status 3.0 Planning Board Recommendations to the Zoning Board of Appeals Applicant(s) SWORDFISH REALTY, LLG Application Type Site Plan 55-2013 Owner(s) Same as applicant SEQR Type N/A Agent(s) Tom Hutchins, Hutchins Lot size 13.54 acres Engineering; Jonathan Lapper, B P S R Location 2999 State Route 9L Zoning Classification WR-Waterfront Residential Tax ID No. 252.-1-75.1 Ordinance Reference 179-3-040, 179-5-020 Cross Reference AV 58--13 Warren Co. Referral 10/10/2013—No County Impact Public Hearing Not required APA, CEA, Other L G Park CEA Project Description: Site Plan: Applicant proposes construction of a 40 x 60' two story building -4 bays in lower level and office space on second level. Site improvements in a WR zone require Planning Board review and approval. Variance: Relief from maximum height for an accessory structure a WR zone Applicant(s) CELLCO PARTNERSHIP Application Type Site Plan 50-2013 D/B/A VERIZON WIRELESS Owner(s) Lost Chalets, LLC SEQR Type N/A-APA Jurisdictional Agent(s) Jared Lusk, Nixon Peabody, Lot size 670.88 acres Location Off Lockhart Mt. Road Zoning Classification Top 0 the World PUD Tax ID No. 265.-1-52 Ordinance Reference 179-5-120 F Cross Reference UV 48-13 Warren Co. Referral November 2013 Public Hearing Not required APA, CEA, Other APA Wetlands Project Description: Site Plan: Applicant proposes a 101 foot monopole with 117'x 30' telecommunications shelter on a concrete pad with associated site improvements. Telecommunication Towers in a PUD require Planning Board review and approval after a Use Variance approval has been received. Use Variance: Public Utilities; Telecommunication Towers are not an allowed use in a PUD;APA review due to tower height greater than 40 feet. The Planning Board shall make a recommendation to the Zoning Board of Appeals. Final Version 10-31-2013 4.0 Tabled Items: Applicant(s) KELLY CARTE Application Type Site Plan 45-2011 Owner(s) Same as applicant SEQR Type II Agent(s) Same as applicant Lot size 45.99+/-acres Location 207 Fuller Road Zoning Classification LC-10A Tax ID No. 300.16-1-3 Ordinance Reference 179-6-010, 179-9 Cross Reference AV 8-09,AV 19-07,AV 82-93, Warren Co. Referral July 2,2011 BP 8-377 Public Hearing/Meeting Dates: 8/2/11, 7/24/12, 7/16/13, APA, CEA, Other SPDES 9/24/13, 11/19/2013 Project Description: Applicant proposes to grade approximately three(3) acres of cleared land. Further proposal to culvert existing drainage course and existing spring requested. Clearing/disturbance on greater than one(1)acre requires Planning Board review and approval. 5.0 New Business: Applicant(s) HUDSON HEADWATERS Application Type Site Plan 61-2013 HEALTH NETWORK Owner(s) Same as applicant SEQR Type II Agent(s) Richard E. Jones Associates Lot size 6.56 acres Location SW corner of Carey Road Zoning Classification LI-Light Industrial Tax ID No. 309.13-2-31.2 Ordinance Reference 179-4-090 Cross Reference SP 45-13, SP 45-10 Warren Co. Referral November 2013 Public Hearing 11/19/2013 Project Description: Applicant proposes additional parking lot with 34 spaces for the HHHN facility. Site improvements to an approved site plan requires Planning Board review and approval. Applicant(s) 27 SILVER CIRCLE LLC Application Type Site Plan 62-2013 Owner(s) Same as applicant&William SEQR Type Unlisted Threw Agent(s) Hutchins Engineering Lot size 3.43,6.57 Location 27 Silver Circle Zoning Classification CLI-Commercial Light Industrial Tax ID No. 309.17-1-17.2, 13 Ordinance Reference 179-3-040 Cross Reference SP 23&24-13, SP 2-12, SP 18- Warren Co. Referral November 2013 09, SP 6-04 Public Hearing 11/19/2013 Project Description: Applicant proposes construction of a three new buildings, a gravel storage area and a boundary line adjustment. New buildings/site improvements in a CLI zone requires Planning Board review and approval. Any further business which may be properly brought before the Board Final Version 10-31-2013