Loading...
Staff Note Packet12.17.13 Department of Community 411101111h. Development Queensbury Planning Board Taw Staff Notes December 18, 2012, January 22, 2013 December 17, 2013 APPLICATION: Site Plan 78-2012 APPLICANT: Jeffrey Schwartz REQUESTED ACTION: Expansion of existing commercial use in a CLI zone requires Planning Board review/approval LOCATION: 53 Carey Road, Lots 4 & 13 EXISTING ZONING: CLI-Commercial Light Industrial SEQRA STATUS: Unlisted WARREN CO. REFERRAL: 12/10/2012-No County Impact ENGINEERING REVIEW: 12/13/2012 PARCEL HISTORY: SP 67-05: 30,924 sq. ft. addition to existing 30,851 sq. ft. warehouse building Approved 1-16-07 SP 69-00: Warehouse space, Wholesale Distribution-Mod. #2 No Action SP 69-00: 10,000 sq. ft. warehouse addition to an existing 10,000 sq. ft. warehouse 9-19-00 SB 6-87 SP 23-99 BP 05-949: Morris Products- 828 sq. ft. interior alteration 1-4-07 BP 05-378: 144 sq. ft. commercial addition BP 04-517: 10,600 sq. ft. warehouse addition 7-26-04 BP 01-355: 10,200 sq. ft. commercial addition 1-17-02 BP 99-669: New build, warehouse& office, 10,000 sq. ft. 1-17-02 PROJECT DESCRIPTION: Applicant proposes a 30,300 sq. ft. expansion addition to existing 30,502 sq. ft. warehouse resulting in a proposed structure size of 60,802 sq. ft.; this expansion is considered Phase IV. STAFF COMMENTS: Staff shared communications and meetings with the applicant during the entire 2013 year on a regular basis about the information needed to be submitted for review. The applicant provided two copies or revised plans and binder with stormwater and erosion management engineering documentation as a portion of the submission and fifteen copies without the stormwater and erosion management engineering documentation—a portion of the submission was provided after the deadline. The applicant had requested the November submission be reviewed at the Planning Board's December meeting at the November 17th meeting. 1 The binders provided included description of past activities and responses to staff and engineering comments along with the proposed construction project. The binder also included waiver requests where the board does not have authorization for some of those requested as they are requirements of stormwater and erosion control management. The applicant has indicated the stormwater and erosion control management had been updated by their engineer for review. The applicant's packet has been provided to the Town Engineer for review. The binder was difficult to review as explained previously by others of an enormous amount of paperwork and various details irrelevant to the project being proposed. The letter dated 11/15/13 indicates the drawings do not include the second floor layout of the existing already built portion of the building. The project indicates the proposed addition is a larger open warehouse with associated racking systems —if the applicant is proposing a 2nd floor for office or storage use the layout should be included with the submission. Binder contents • Morris Pg. 3 Item 7 Dumpster enclosure door width. The door width is noted as 10 ft. and 9 ft. and should be clarified for the final plans • Morris Pg. 9 Maintenance Plan. Section refers to SM31- SM3?. The pages of SM31-SM3? Are sections of the code pulled in reference to the stormwater and erosion control requirements? The maintenance plan is noted as Morris Pg. 21 in the binder received. • Addendum Morris Pg. 13 Tree Clearing 2B. The applicant should mark all trees that are to be removed as part of the project and communicate with the Code Compliance Officer prior to cutting. The Construction Manager will be required to contact the Code Compliance Officer as part of site compliance • Addendum Morris Pg. 13 Tree Clearing 2C. The applicant will need to clarify the distance of the strip of trees as S-3 identifies a 20 ft. strip and this page notes a 25 foot strip • Addendum Morris Pg. 14 Overhead Doors 3A. Future Loading Doors that do not have infrastructure for the truck wells shown on the plans may be further subject to site plan review when constructed. A note on the plan should also indicate the same. Those Future Loading Doors that do have truck wells shown a building permit will most likely be required and the Construction Manager should communicate with Building and Codes for the appropriate permits. A note on the plan should say the same. • Addendum Morris Pg. 14 barrier construction. Plans S-3 and S-5 need to be revised to provide a label to the figures that are on the drawings. • Addendum Morris Pg. 15 and 16 clearing of trees. Plans should be revised to clearly indicate the areas where trees are to be removed Station notations area not adequate for tree removal delineation. Trees should be marked and field observed by the Code Compliance Officer. Waiver Requests • Item 2 Raised drainage structure. The plans need to be revised to reflect the drainage structure to be installed. A waiver is not applicable—plans need to be updated accordingly • Item 3 Protection of devices in the Town right-of-way. The Highway department requires devices to be protected during construction and to be stabilized upon project completion. A waiver is not applicable. • Item 5 Test pits. Test pits are required and to be verified by the Town designated Engineer. The applicant has indicated this would be completed with notification to the Town Designate Engineer as required. A waiver is not applicable • Item 1 Filter Fabric, Item 7 Boiler Plat language and any remaining waivers. o Filter fabric within a stormwater device is a temporary measure and should be removed upon project completion. This is a compliance requirement for stormwater and erosion control management. o Boiler Plat language -The applicant/ construction manager is responsible for communicating with the Code Enforcement Officer on a regular basis during project construction. Any changes -2- proposed from the final approved site plan that need to be changed due to field conditions are required to be communicated and noted with the Code Compliance officer prior to occurring. The project is subject to the stormwater requirements of the NYSDEC -devices are to be installed and maintained according to required operation of the device—the board is not authorized to grant waivers from these requirements. • Maintenance Plan. Waiver requests are not part of the maintenance plan and this notation should be removed. A revised maintenance plan should be provided with the approved plans. SUMMARY The applicant has completed a site plan application for the construction of a 30,300 sq. ft. addition to existing 30,502 sq. ft. warehouse resulting in a proposed structure size of 60,802 sq. ft. The board may consider requesting clarification on the width of the dumpster enclosure doors 9 ft. or 10 ft. and the width of the trees to remain on Carey Road East 20 ft. or 25 ft. The following should be included as conditions: 1. Plans to be revised to show a. Dumpster enclosure width b. Width of trees to remain along Carey Road East c. Label on fire barriers d. Notations of future loading doors may need a building permit and future loading doors with no truck well infrastructure may need site plan review e. Add detail of raised drainage structure f. Second floor if proposed within project area 2. Areas where trees are to be removed and trees to be removed should be marked in the field and confirmed with the Code Compliance Officer prior to removal 3. Maintenance plan to remove waiver request notation -3 - THE North Country Office Chi e' 375 Bay Road, Queensbury, NY 12804 P: (518) 812-0513 F: (518) 812-2205 COMPANIES www.chazencompanies.com Engineers Hudson Valley Office (845)454-3980 Environmental Professionals Capital District Office (518)273-0055 Land Surveyors Landscape Architects Planners December 3, 2013 Mr. Craig Brown Zoning Administrator and Code Compliance Officer Town of Queensbury 742 Bay Road Queensbury, New York 12804 Delivered via email only: CraigB@queensbury.net Re: Jeffery Schwartz Site Plan Review, 53 Carey Road Town of Queensbury, Warren County, New York Chazen Project#91204.46 Queensbury Ref. No:Site Plan 78-2012 Dear Mr. Brown: The Chazen Companies (Chazen) has received the latest submission responding to technical comments offered by Chazen on August 27, 2013 via e-mail. Based upon our review of the information provided, Chazen offers the following comments for the Town's consideration: Stormwater Management& Erosion and Sediment Control: 1. In response to comment 3 of Chazen's e-mail dated August 27, 2013 and comment 4 of Chazen's July 2, 2013 letter, the Applicant indicates that soil testing will be performed in advance of construction when a larger backhoe can be mobilized to the site. The Applicant shall notify the Town prior to soil testing so that the Town may request that Chazen be on-site during testing. The Applicant shall advance testing as required by the NYSDEC for all proposed infiltration facilities. 2. In response to comment 4 of Chazen's e-mail dated August 27th and comment 7 of Chazen's July 2, 2013 letter, the Applicant shall review Town code section 147-10.D and then discuss with the Town a formal maintenance agreement for stormwater management facilities. The Applicant has not included a draft maintenance agreement in this submission, though it was referenced as SM-57 within the documentation submitted. The applicant shall provide this information to receive approval. 3. In reference to waiver's requested 1, 2, and 3 (Morris Pg. 17). The Town cannot endorse the use of Filter Fabric in or over drainage grate structures. This is not a NYSDEC approved sediment control practice. The Applicant shall use a NYSDEC approved catch basin inlet protection method outlined in the NYS Standards and Specifications for Erosion and Sediment Control. Town of Queensbury Site Plan 78-2012 Jeffery Schwartz December 3,2013 Page 2 Conclusions and Recommendations It is our opinion that the applicant shall provide the outstanding documentation and incorporate any necessary changes in a subsequent plan submission. If you have any questions regarding the above, please do not hesitate to call me at (518) 824-1926. riq Sean M. Doty, P.E., LEED AP Senior Project Engineer cc: Pam Whiting,Town Planning Office Administrator(via email) Laura Moore,Town Land Use Planner(via email) File K19591200-91299191204.00-Town of Queensbury PB Engineer\91204 46-SP78-2012-Jeffery Schwarti51204 46_SP 78-2012-Jeffery Schwartz_12-03-13_LA.docx "11111W FIRE MARSHAL'S OFFICE w_ 1 Town of Queensbury F 742 Bay Road, Queensbury, NY 12804 " Home of Natural Beauty ... A Good Place to Live " PLAN REVIEW Morris Products SP 12/13/2013 The following comments are based on drawings: • Current drawings indicate on Drawing S-3,that the fire road meets the requirements of the NYS Fire Code. Before a final CO will be issued for the project, a letter must submitted indicating that the road is capable of supporting an imposed load of at least 86, 0000#. • I do not see any indications on Drawing S-5 of any traffic control type devices. Section 503.4 of the NYS Fire Code prohibits the restriction or obstruction of fire lane and access roads. If the owner is proposing such devices, I would suggest a face to face meeting to discuss, and if the Fire Marshal's office agrees with the plan, approval will be sought from the Fire Chief. Michael J Palmer Fire Marshal 742 Bay Road Queensbury NY 12804 firemarshal @queensbury.net Fire Marshal 's Office • Phone: 518-761-8206 • Fax: 518-745-4437 firemarshal@queensbury.net • www.queensbunj.net TOWN OF QUEENSBURY vir 742 Bay Road, Queensbury, NY. 12804-5902 Town of Queensbury Planning Board RESOLUTION TO APPROVE/DISAPPROVE SITE PLAN 78-2012 JEFFREY SCHWARTZ Tax Map ID 308.20-1-2/Property Address: 53 Carey Road(Lots 4 & 13) A site plan application has been made to the Queensbury Planning Board for the following< ;,Applicant proposes a 30,300 sq. ft. expansion addition to existing 30,502 sq. ft. warehouse resulting in a proposed structure of 60,802 sq.ft. Expansion of existing commercial use in a CLI zone requires Planning Board review and approval. A public hearing and/or meeting was advertised and held on 12-18-12, 1-22-13, 3-19-13. 5-21-13, 7-16-13, 9-24- 13, 11-19-13, 11-21-13. 12-17-13; This application is supported with all documentation, public comment, and application mat'=R,. in the file of record; MOTION TO APPROVE / DISAPPROVE SITE PLAN 78-2c1l JEFFRE' :SCHWARTZ., Introduced by who moved for its adoption, seconded by 1) Pursuant to relevant sections of the Town of Queensbury Zoning Coder-Chapter 179-9-080, the Planning Board has determined that this proposal satisfies the requirements as statedit the Zoning Code; • 2) The requirements of the State Environmental Quality Review Act,have beery considered and the Planning Board has adopted a SEQRA Negative/Positive Declaration; 3) Engineering sign-off requiredprior to signature of Zoning:Administrator'of the approved plans; 4) Applicant will provide:4ppropriate protection of devices during construction and to remove protection once construction is stabilized and complete. The activities wain inimize any erosion or situation from being deposited into the devices during construction. This includes but is not limited to the protection described on SM26 and stabili?;an;as described on SM27. 111.5.... -' 5) If required,the applicant must submit a copy of the following to the Town: a) The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity"prior to the start of any site work. b) The project NOT(Notice of Termination)upon completion of the project; 6) The applicant must maintain on their project site,for review by staff: a) The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP(Storm Water Pollution Prevention Plan)when such a plan was prepared and approved; b) The project NOI and proof of coverage under the current NYSDEC SPDES General Permit, or an individual SPDES permit issued for the project. 7) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel. 8) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work. 9) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution 10) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. Duly adopted this 171h day of December 2013 by the following vote: AYES: NOES: :% Cc: Peter Brown ti N,,,.... 4\. o.-- •. yy tL rtiti Lh h ....,4).%, •